1200 15

4,147 views 12 slides Jul 17, 2013
Slide 1
Slide 1 of 12
Slide 1
1
Slide 2
2
Slide 3
3
Slide 4
4
Slide 5
5
Slide 6
6
Slide 7
7
Slide 8
8
Slide 9
9
Slide 10
10
Slide 11
11
Slide 12
12

About This Presentation

No description available for this slideshow.


Slide Content

18 2 1200 (Part 15) - 1907
(Reattemed m)

Indian Standard

METHOD OF MEASUREMENT OF
BUILDING AND CIVIL ENGINEERING WORK

PART 15 PAINTING, POLISHING, VARNISHING, ETC

( Fourth Revision )

Second Reprint SEPTEMBER 1998

ube evony12 69612

© Copyright 1987
BUREAU OF INDIAN STANDARDS
NANAK BHAVAN, 9 BAVADUR SHAH. ZAPAR MAR

October 1967

15: 1200

Indian Standard

METHOD OF MEASUREMENT OF
BUILDING AND CIVIL ENGINEERING WORK

PART 15 PAINTING, POLISHING, VARNISHING, ETC

( Fourth Revision }

Method of Measurement of Works of Ovi Bngieering Excluding
River Valley Proje, BDC 44

sima Amrum

1200 (Part 18) 1967

Sex X Mana MR auodaion of Toda (Re

18: 1200 (Pan 15) - 1987
Indian Standard

METHOD OF MEASUREMENT OF
BUILDING AND CIVIL ENGINEERING WORK

PART 15 PAINTING, POLISHING, VARNISHING, ETC
{ Fourth Revision }
0. FOREWORD

Measurement oscupies a very important place a planing and execu
Fin of any cl engineering work rom the me of ei esti
sd lor measurement ace ot uniform and considerable Siferences exit
Bene practic folwad by, one comtrtion agen and año? and
sso between yous Cea und Sate Govern! Sparen Whe
tlt fe sins snd eal opacas wine dep
Side of operation for
À and Dane
vicious ystems fee.

A I une of wef ann (1: RGA), by va
“ise result of study. the Committee
Being appleabe to bik

1: 1200 (Pat 15) 1987

15 Sice varios trades are not related o one another, the Commitee
ina ope of ade a een nig LOL: o
Sou fade Ti prt covering method of measurement of pasting
polishing, anto, et applicable fo Duda ay wel al Epes:
Fe words was before sted as acond reiten in 1908 and ied
coin 19
146 In the cour ofus ofthis standard in he past tn yen, segons
foe improvement of sme ofthe clas wee canes. The fourth Ten
Gover eden! in epee of pinta of se work and on
{aiming of fats door, bade Weng he requirement 20 310 bring
Inline th reine of reanudan Standard
07 For the purpose of dexding wheter a particular requiement of
ändere compl vith, the fad value cred or Cala, cpr
si a ate of ayy al fount of ne ih
stat The number of gleam! ace sand rounded
us shoul be the some a tht of the puc vals lo andré

1. SCOPE
1.1 This standard (Pact 15) covers the method of measurement of pnt
i alae es id marine o

2. GENERAL RULES

2. Clubbing of lems — tms maybe clubbed togeber provide se are
‘a ie ao stad desorption of tems sted he anda

22 Booking of Dimensicos — In booking of dimensions, th ode ba be
etd pny sce fee, wi nd hot ph

23 Dee em Dorion e ac em hl, la thre
inh, mire rear covers eve; banding
A floor, wally gst Paes, 7

18: 1200 (Pan 15) - 1967

24 Meararement — AU work sal be measured net in the decimal tm,
ete nd a Ben blow

1) Dimensions sal be measured tothe neues 001 m, and
1) Areas shall be worked out othe nearest 001 m

25, Da of Quai em of works ala deco mater and
A pente e

26 Preparatory ‚ch e kooting, primi, stoping and rabbin
Aus Hara ol or sipping shal be derbe andthe uber of coat
Shall tated Wark Su surfaces previously pated sal be measured
Separata
2:61 Where special colours o other special nites are rogue, i shall
Dr
27 Work on diferent srfces shall be messed separately classed
2 (laws and he preparatory work hal be deste and Iced m be
13) Norabsorbent surface, such a on tel and other metal; and
1) Semrabsorbent surfaces, ach as wood, bebosrd

3. MEASUREMENT OF PAINTING

AL Painng, exept where otherwise slated, sal be measured in square
31 No deduetion shall be made for openings not exeeding 0 a
(ach, and go addition sll be made for palgung to beading, mesling,
dpe lambs, soft, ily ct of ch open
32 In cae of fabricated sutura! cel and ion work, priming cost of
Paint shall include ith fabrication, Subreqeent coats of pla ball
[tneaured separately one bas of weight of steel work and ron work
ia saure meen The weignare of tel shee piste and sp ole
eh selon sel rods an sted spa forged sel al eating and ec
Des thal ete from elevant Idienandarde. vet header bol bed
¿oi moat was) ute Corb! when al add
jaen! work, these shall Be enumerate and measured ss entra ove.
nm se and os work o Ue pa spied ies in hop ea Her

33 Pain workup to 10 om in vii or in girth ane aot in conjonction
Si similar paged work sal be measured in running metres and hal
ee esting 1 ie where 1 equi.

15: 1200 (Part 15) 1987

44 Cain ton, wire noticed nde item, shal be measured
34 Small ais upto 01m? of pntd surface, were notin conjunction
‘var painted work, sal Demand

35 Paatng on dear types of work sal be kept separate und surfaces
dde pul sta be decid I al be nated wer een
Sef pd. Alert, diferent surface may be grouped ite
die tc tan, of tes Big comedo slo

26 Corrugated ses surfaces and Nainital pater 00€ surface hall be
cadet with plan mulas aos Increasing hr zea byte fing

1) Nainital pater oof (pin sheets with rl) 10 pee
©) Nainital pateraroo with courte sheets 25 peoent
3) Astesos cement sets, orge 20 porn

37 Painting on enve-gutes, rannte pipes sl and ventas pipes

Ana ee pol tal Be mented tn runing’ tees sting he E oe
{pith Els suchas Dons, sow, Bana, edo ei sae nuded

38 Paining on small arcs, such s gate and tun straps, meta eng
Fo mo tel oaks eas aa ba, as of tule
‘on with sae pained wore sal be enumersieh, "SOMME

Serial mts (not ated), water tank, od

ane maso space andthe IS esla peal
sured par stating thesia, eh and average

2.10 Paiting in repair work up 1 1 mi ahal De enumerate in he fom

a) Not exceeding 1m,
Y) Exoesting Dm and ot exteding 05 m3, und
©) rowing 0 m? and not excesos I m

1 1200 (Par 15) - 1987

FRET BROT AER FLA ARES OF TREN RTOS

os GEBEN imma

15: 1200 (Pat 15) 1967

RSet TI at) laren ae)
Fag puma Maw (ogre) 04 rate)

im fap me ct Merete in, et) mr

1S: 1200 (Part 15) 1087

4. VARNISHING

A1 Application of sin, staining ao varnishing on wood nor sal be
las in socordanse with the werk protons online fa

5. POLISHING
1 Politing on wood-work shal be described sinclding all preparate
‘tock and Usd ig and shal be measured I Suar atts in accordance
‘Sih de provaonscootined in 3. Alternative artes shal be deste

tnd emumerted

6. PRESERVATIVE TREATMENT
64 Surface application of wood preservatives shal be mens

eee teste of gh e slate pono contd Sl

7. TARRING

LA Tarring shall be measured as for panting in accordance wih he
provision contained ia 3

5. WRITING LETTERS AND FIGURES
A1 Lester ures and similar items shall te enumerted stating eight

$a or “orale, arco Mick tale ee sop sommes hype and
{hee al be deme tbe la is tee =

AMENDMENT NO. 1 MAY 2002
TO

IS 1200 ( Part 15): 1987 METHOD OF MEASUREMENT
OF BUILDING AND CIVIL ENGINEERING WORKS

PART 15 PAINTING, POLISHING, VARNISHING,ETC
( Fourth Revision)

[ Page 6, clause 3.6(a) ] — Substitute the following for the existing:
a) MS. and G.I. corrugated sheets 14 percent

[ Page 6, clause 3.6(e) ) — Insert the following after (e):

9) Aluminium corrugated sheet 12 percent

(Page 8, Table, Note 6 ) — Insert the following after Note 6:

“NOTE 7 — Multiplication factors which may be needed for other intermediate cases
which are not covered in above, may be arrived at in line with the factors recommended
inthe ble”

(CED 44)
Tags