13-07-2024 SHANGRI-LA APARTMENT BUILDING RENOVATION WORKS.pdf

ShyamRajJilla 17 views 28 slides Aug 10, 2024
Slide 1
Slide 1 of 28
Slide 1
1
Slide 2
2
Slide 3
3
Slide 4
4
Slide 5
5
Slide 6
6
Slide 7
7
Slide 8
8
Slide 9
9
Slide 10
10
Slide 11
11
Slide 12
12
Slide 13
13
Slide 14
14
Slide 15
15
Slide 16
16
Slide 17
17
Slide 18
18
Slide 19
19
Slide 20
20
Slide 21
21
Slide 22
22
Slide 23
23
Slide 24
24
Slide 25
25
Slide 26
26
Slide 27
27
Slide 28
28

About This Presentation

Renovation Works


Slide Content

CIVIL RENOVATION WORKS FOR THE SHANGRI-LA
APARTMENTS, (SHANGRI-LA FLAT OWENERS
COOPERATIVE MAINTEANANCE SOCIETY LIMITED),
BANJARA HILLS, HYDERABAD, TELANGANA STATE.
PREPARED BY M/S: SRR ARCHITECHNIQUES,
Ar. S. Raghuram Acharya

EXISTING SCENARIO OF THE APARTMENT:
There are two underground water tanks with a capacity
of two lakhs liter.
Overhead tanks have fifty thousand liter in two numbers
and twenty five thousand liters in one.
A Fire fighting system is available in the apartment, but
it is not in workable condition.
Water supply and drainage pipes are out of date and
need to be replaced.
In Vertical shafts, some areas are covered with slabs.
Most of the drainage pipe lanes are leaking.

EXISTING SCENARIO PHOTOGRAPHS:

SCOPE OF WORKS:
PHASE – I:
Terrace Water Proofing, Water Supply And Drainage
(STP)
PHASE – II:
Painting work (Common areas, interiors and
exteriors)
PHASE-III:
Surrounding area in set backs flooring (VDF flooring
with tiles) etc., works

WATER SUPPLY SYSTEM:
1) Over Head Tank or Up Feed System:
2) Hydro pneumatic System:
Type of pipe Material:
A) Galvanised Iron Pipes - metal pipe:
B) Mild Steel Pipes metal pipe:
C) Poly Vinyl Chloride pipes - non- metal pipe:
D) High Density Poly Ethylene Pipes - non metal
pipe:
E) Ductile Iron Pipes:

Mild Steel Pipes:
Number of joints are less as they are available in longer length.
Pipes are durable and can resist high internal water pressure
and highly suitable for long distance high pressure piping.
Flexible to lay in certain curves.
Light weight and easy to transport. Damage in transportation is
minimal.
Pipes are prone to rust and require higher maintenance.
Require more time for repairs and not very suitable for
distribution piping.
Available in diameter of 150-250 mm for water supply and cut
lengths of 4 - 7 m (2.6-4.5 mm wall thickness).
Steel Pipes are joined with flanged joints or welding.

Galvanised Iron (GI) Pipes:
Cheap in cost and light in weight.
Light in weight and easy to join.
Affected by acidic or alkaline water.
GI pipes are highly suitable for distribution system.
They are available in light (yellow colour code), medium (blue
colour code) and heavy grades (red colour code) depending on
the thickness of pipe used. Normally, medium grade pipes (wall
thickness 2.6-4.8 mm) are used for water supply system.
Normally, 15-150 mm size pipes (nominal internal diameter) are
used for distribution system. They are available in length of 3 m.
GI pipes can be used in non-corrosive water with pH value
greater than 6.5.
GI pipes can be used for rising main as well as distribution.
GI pipes are normally joined with lead putty on threaded end.

Poly Vinyl Chloride (PVC unplasticised) Pipes:
Cheap in cost and light in weight.
Economical in laying and jointing.
They are rigid pipes.
Highly durable and suitable for distribution network.
Free from corrosion and tough against chemical attack.
Good electric insulation.
Highly suitable for distribution piping and branch pipes.
Less resistance to heat and direct exposure to sun. Hence, not
very suitable for piping above the ground.
PVC pipes weigh only 1/5th of steel pipes of same diameter.
Certain types of low quality plastic impart taste to water.
 Available in size 20-315 mm (nominal internal diameter) for
water supply with pressure class of 2.5, 4, 6, 8 & 10 kg/cm2 for
water supply. Ideally pipes with 6 kg/cm2 should be used.

HDPE Pipes:
Light in weight. • Flexible than PVC pipes.
HDPE pipes are black in colour.
Suitable for underground piping and can withstand movement of
heavy traffic.
Allows free flowing of water.
Highly durable and suitable for distribution network.
Free from corrosion.
Good electric insulation.
Useful for water conveyance as they do not constitute toxic
hazard and does not support microbial growth.
Normally, 20-315 mm diameter pipes are used for water supply
and distribution system with pressure ranging from 6-10 kg/cm2 .
Available in coils in small diameters. Above 110 mm diameter,
available in lengths starting from 6 m.

Ductile Iron Pipes:
Ductile Iron pipes are better version of cast iron pipes with
better tensile strength.
DI pipes are prepared using centrifugal cast process.
DI pipes have high impact resistance, high wear and tear
resistance, high tensile strength, ductility and good internal
and external corrosion resistance.
DI pipes are provided with cement mortar lining on inside surface which
provides smooth surface and is suitable for providing chemical and physical
barriers to water. Such pipes reduce water contamination.
The outer coating of such pipes is done with bituminous or Zinc paint.
DI pressure pipes are available in range from 80-1000 mm diameter in lengths
from 5.5-6 m.
Available in thickness class K7 and K9 with barrel wall thickness ranging from
5- 13.5 mm. Also available in pressure class (Like C25, C30, C40 etc.).
They are about 30 percent lighter than conventional cast iron pipes.
DI pipes lower pumping cost due to lower frictional resistance.

Over Head Tank or Up Feed System: (Indirect supply system)

When the water pressure in mains is not sufficient for direct water supply
system from mains can be either pumped up in to the over head storage
tank, usually at the roof of the building from where the water is supplied to
different floors by gravity or stored into the underground storage tank from
where is pump to the OHT. & then it is supplied by gravity.

Pressurized Distribution System (Hydro-pneumatic Pumping
System):
Variation of direct pumping system.
Air tight pressure vessel is installed on line to regulate the operation of
the pumps.
The pressure switch installed in the pressure vessel/ tank switches off after
reaching the predetermined pressure and the operating pump is put to
stop.
Air compressor is necessary to feed the water with air to maintain the air
water ratio.
This system eliminates the need of an OHT and supplies water at a much
higher pressure resulting the even distribution of water on all floors.
Pressurized distribution system is a direct pumping system incorporating a
recharge diaphragm vessel.

Pressurized Distribution System (Hydro-pneumatic Pumping
System):

Combined Distribution System:
In this system, a combination of gravity
and pressurized distribution is adopted.
A few upper floors are provided with a
pressure booster pumping system to
achieve the desired residual pressure,
while the lower floors are fed by gravity
supply.
Water collected in the over head tank is
distributed to the various parts of the
building. To achieve required residual
pressure for top 2 to 4 floors for proper
functioning of the fixtures, a pressure
booster pumping system is installed
on the dedicated outlet from overhead
tank with its own distribution piping
serving the top 2 to 4 floors. For lower
floors, water is distributed by gravity
system.

Sewerage Treatment Plant (STP):
MBBR TECHONOLOGY (Moving bed biofilm reactor):
The MBBR system consists of an aeration tank (similar to an activated sludge
tank) with special plastic carriers called fluidized aerated bed (FAB) media that
provide a surface where a biofilm can grow. The carriers are made of a material
with a density close to the density of water (1g/cm7). An example is high density
polyethylene (HDPE) which has a density close to 0.95 g/cm7. The carriers will
be mixed in the tank by the aeration system and thus will have good contact
between the substrate in the influent wastewater and the biomass on the
carriers. To prevent the plastic carriers from escaping the aeration it is
necessary to have a sieve on the outlet of the tank.
Advantages The MBBR system is considered a biofilm process. Other
conventional biofilm processes for wastewater treatment are called trickling
filter, rotating biological contactor (RBC) and biological aerated filter (BAF).
Biofilm processes in general require less space than activated sludge systems
because the biomass is more concentrated, and the efficiency of the system is
less dependent on the final sludge separation. A disadvantage with other biofilm
processes is that they experience bio-clogging and build-up of head loss.
MBBR systems don't need a recycling of the sludge, which is the case with
activated sludge systems. The MBBR system is often installed as a retrofit of
existing activated sludge tanks to increase the capacity of the existing system.

Sewerage Treatment Plant (STP):

PHASE –I
TERRACE WATER PROOFING TREATMENT,
WATER SUPPLY AND DRAINAGE WITH STP

BILL OF QUATITIES FOR THE TERRACE WATERPROOFING WORKS:
S.No Description of the item UNIT QTY. RATE AMOUNT
1
Surface Preparation : Chipping and removing old concrete,
preparing the surface by removing dust, with necessary
treatment like Crack treatment, Pond test, Grouting if any
leakages were observed and Filling cracks with Fosrog
GP2.
Sqmt 1956
₹ 925.00 ₹ 1,809,300.00
2
Supply and application of Waterproofing coating using
Brushbond RFX of M/S Fosroc @ coverage of 1.5
kg/Sqmt with necessary tools and tackles
Sqmt 1956
3
Providing & laying of protection layer Geotextile fabric 40
GSM over the entire membrane with proper overlaps
Sqmt 1956
4
Laying of Screed of 50mm thick over the Waterproofing
membrance mixing with integral waterproofing Compound
Conplast WL of M/s Fosroc. Sqmt 1956 ₹ 285.00 ₹ 557,460.00
5
Groove Cutting _Cutting the groove of width -5mm and
depth 10mm with necessary tools and tackles
Rmt 300 ₹ 450.00 ₹ 135,000.00
6
Sealant filling_Fillingthe groove with Polysulphinde
sealantwith necessary groove cleaning. Rmt 300 ₹ 980.00 ₹ 294,000.00
Total of terrace waterproofing works ₹ 27,95,760.00

BILL OF QUATITIES FOR THE WATER SUPPLY AND DRAINAGE WORKS:
S.No Description of the item UNIT QTY. RATE AMOUNT
1 Removal of Old Pipes

G.I Outlet pipes which are connected to the Drainage
will be removed in the all area of the outlets, which are
of Dia 90mm - 110 mm. For each pipe. (Exterior
Concrete side part of the pipes will be removed)
RMT 2800 ₹ 350.00 ₹ 9,80,000.00
2 Fitting of SWR Pipes

SWR pipes will be fitted with the required bends for the
kitchen wastage and solid Waste of the buildings to
connect the Drainage out in ground level of the building
as specified Dia of 90mm to 110mm. (ASTRAL)
RMT 1300 ₹ 950.00 ₹ 12,35,000.00
3 Fitting of outlet Drainage Pipes

Removal and fitting of new underground drainage pipes
of PVC-U with 200 mm dia and required manholes
connectivity to the main Drainage line.
RMT 290 ₹ 1,800.00 ₹ 5,22,000.00
4 Fitting of CPVC Pipes

CPVC pipes will be fitted with the required bends for the
of the buildings to connect the inlets of the building as
specified Dia of 15mm to 25mm. (ASTRAL) RMT 1650 ₹ 1,150.00 ₹ 18,97,500.00
Total of Water supply and Drainage works ₹ 46,34,500.00

ABSTRACT ESTIMATE FOR THE TERRACE WATER PROOFING, WATER SUPPLY
AND DRAINAGE ALONG WITH STP WORKS
S.No Description of the item AMOUNT
1 Terrace Water Proofing Works ₹ 27,95,760.00

2 Water Supply and Drainage Works ₹ 46,34,500.00

3 STP and Civil works (21.66+5.34) ₹ 27,00,000.00

4 Meter Works ₹ 2,50,000.00

5 Rainwater Harvesting Pits ₹ 5,00,000.00
6 Hydro Pneumatic System ₹ 8,00,000.00
7 Total ₹ 1,16,80,260.00

8 Architect Consultancy Services Fee ₹ 2,19,740.00

9 Total of Terrace Water Proofing, Water supply and
Drainage works
₹ 1,19,00,000.00

PHASE –II
PAINTING WORKS
(COMMON AREAS, INTERIORS AND EXTERIORS)

BILL OF QUATITIES FOR THE PAINTING WORKS:
S.No
Description of the item
UNIT QTY. RATE AMOUNT
1
Exterior Paints:

i)
Supply and Application of Exterior Aultra Rain Protect
Base coat premium in 1 coat for the exterior of the
building. The cracks in horizontal walls will be made
2mm U, V groove size and it will be applied SBR latex
for closing pores of the walls , Filled with Cracks of
Fosroc. ( Cleaning of the building will be done with the
Waste cloth to remove the Dust Particles)
SFT 14,900 ₹ 8.00 ₹ 1,19,200.00
ii)
Supply and Application of Exterior Aultra Weather
Protect Plus in two coats for the exterior building.
SFT 80,000 ₹ 15.50 ₹ 12,40,000.00
2
Interior Paints

i)
Supply and Application of Aultra Everlite premium Acrylic
emulsion Washable paints in 2 coats for Walls lobby,
Ceiling in verandas, office room, Security room.
(Cleaning of the building will be done with the Waste
cloth to remove the Dust Particles )
SFT 58,108 ₹ 8.50 ₹ 4,93,918.00
ii)
Supply and Application of Aultra Ceiling premium Acrylic
emulsion paints in 2 coats for Ceiling in verandas, office
room, Security room. ( Cleaning of the building will be
done with the Waste cloth to remove the Dust Particles )

SFT 58,108 ₹ 7.00 ₹ 4,06,756.00

BILL OF QUATITIES FOR THE PAINTING WORKS:
S.No Description of the item UNIT QTY. RATE AMOUNT
3 Ducts

Supply and Application of Aultra Rain Shield premium in
2 coat for the Ducts of the building. The cracks in
horizontal walls will be made 2mm U, V groove size and
it will be applied SBR latex for closing pores of the walls,
Filled with Cracks of Fosroc. ( Cleaning of the building
will be done with the Waste cloth to remove the Dust
Particles)
SFT 22,400 ₹ 9.50 ₹ 2,12,800.00
4 Wood Care

Supply and application of wood care putty in filling the
cracks of the doors and the windows which are elevated
in the exterior side of the building. Application of wood
primer and then Aultra Everlite premium enamel for the
required area. ( Cleaning of the building will be done
with the Waste cloth to remove the Dust Particles)
SFT 15,204 ₹ 22.00 ₹ 3,38,888.00
5 Metal enamel

Supply and application of Aultra Everlite premium
enamel for metal railing of staircase, exterior elevation
balcony railing, protected grills in the exterior area ,
Front Gate of the Building. If any metal exterior
materials which is required to do rework will be done to
bring in uniform colour of metals. ( Cleaning of the
building will be done with the Waste cloth to remove the
Dust Particles )
SFT 15,204 ₹ 23.00 ₹ 3,54,292.00
Total of Interior and Exterior Painting Works ₹ 31,65,854.00

ABSTRACT ESTIMATE FOR THE INTERIOR AND EXTERIOR PAINTING WORKS
S.No Description of the item AMOUNT
1 Interior and Exterior Painting Works ₹ 31,65,854.00

2 Total ₹ 31,65,854.00

3 Architect Consultancy Services Fee ₹ 84,146.00

4 Total of Interior and Exteriors Painting Works ₹ 32,50,000.00

PHASE –III
BUILDING SURROUNDING SETBACK AREA
FLOORING WORKS

BILL OF QUATITIES FOR THE SURRODING AREA SET BACK FLOORING:
S.No Description of the item UNIT QTY. RATE AMOUNT
1
Surface Preparation : Preparing the surface by removing
dust, with necessary treatment like crack treatment,
Filling cracks with SBR and Fosroc GP2.
SMT 1,956 ₹ 75.00 ₹ 1,46,700.00
2
Marking the level of slope of slope by using total station
to remove the uneven surface of the flooring
SMT 1,956 ₹ 5.00 ₹ 9,780.00
3
Supply, Application, leveling of the M20 grade of
concrete with mixture of Record 3s fibers and weld
mesh will be provided the joints if necessary
waterproofing agent mix/ compact will be added for not
shrinkage of the concrete, Flower finish will be provided
with the sprinkling of hardener on the surface. 50 mm
Thickness from existing floor level ) (Mixture of Ultratech
53 grade cement)
SMT 1,956 ₹ 1,050.00 ₹ 20,53,800.00
4
Curing of the concrete will be provided for 7 days with
bunds filling of the water. Removing of the bunds and
cleaning of the surface will be done.
SMT 1,956 ₹ 20.00 ₹ 39,120.00

BILL OF QUATITIES FOR THE SURROUNDING AREA SET BACK FLOORING:
S.No
Description of the item
UNIT QTY. RATE AMOUNT
5 Groove cutting the groove of width 5mm and depth 10
mm with necessary tools and tackles.
RMT 300 ₹ 220.00 ₹ 66,000.00
6 Sealant filling_ Filling the groove with Polysulphide
sealant with necessary groove cleaning.
RMT 300 ₹ 450.00 ₹ 1,35,000.00
7
Marking of the parking layout with given flat nos. and
width parking area will be done for the area located in
the building area
RMT 1,956 ₹ 150.00 ₹ 1,95,600.00
Total of the Building Surrounding Area Set Back
Works
₹ 26,46,000.00

ABSTRACT ESTIMATE FOR THE BUILDING SETBACK SURROUNDING ARE
FLOORING WORKS
S.No Description of the item AMOUNT
1 Building Setback Surrounding Area Flooring Works ₹ 26,46,000.00

2 Total ₹ 26,46,000.00

3 Architect Consultancy Services Fee ₹ 54,000.00

4 Total of Building Setback Surrounding Area Flooring
Works
₹ 27,00,000.00