Module- 1 : Registration of PIBO Module- 2 : Registration of PWP Module- 3 :Issue & Exchange of EPR Certificate Module- 4 :Filing of Annual return Module- 5:Environmental Compensation Module- 6 :Third Party Audit Module- 7:Training All modules are operational Seven Modules of EPR Portal
1 .0 Registration of PIBOs
REGISTRAION OF PIBOs Type Brand-Owner/Producer/Importer (ii)Company Details: Following information to be provided Legal/ Trade Name ( As per GST) Type of Business( Private/Public/ Proprietorship/ Co-operative etc.) Type of Company ( Micro/ Small / Medium / large) Registered Address of the entity Company PAN/ CIN ( Mandatory for companies registered under the Company Act and validated on the Portal) ( PAN /GST API also being integrated)
Signup for Registration of PIBOs
Part A: General Information States/UTs where the PIBO is operational Confirmation, if the PIBO, has a production facility Year of Commencement of Operations Details of products produced Representative Picture of Plastic Packaging /Plastic Packaging for Commodities covering different Categories. Category-wise Plastic packaging consumed in the last two years ( Section 5c) Confirmation that the PIBO is not using / producing /selling banned SUP items Checks & Balances: If year of commencement of operation is previous to the current year, the portal shall not accept applications zero plastic waste consumption (Section 5c) and waste generation (Section 7) Filling up of the Application Form Note: Section 5(c) is not required to be provided for Producers in MSME (small & Micro) category
Part A: General Information
PART B (Pertaining to Liquid Effluent & Gaseous Emissions) Consent API integrated . The user will have to key in the Consent Application No. which will autofetch the date of validity of the Consents (Air/ Water Act) The user shall be able to proceed further with filing of application only if the Consents under Air & Water Act are valid on the date of filing of application. Note: MSME (Micro & Small category) Producers can apply for grant of provisional Registration on the EPR Portal by providing proof of submission of application for grant of Consent to Operate (CTO) to concerned SPCBs/PCCs
Part B: Pertaining to Liquid Effluent & Gaseous Emissions
PART C: Related to Wastes Statewise / category wise Pre-consumer & Post consumer plastic packaging waste, recycled plastic content is to be provided for the last two years in Section 7 of the application The user can click on “Save” after keying in data for each row to avoid losing data Pop-up Message shall be flashed if there is a discrepancy in the data Checks & Balances: Category and year wise quantity of Total Pre and Post consumer plastic waste provided in section 7a should be less than or equal to the details provided in section 5c .
Part C: Pertaining to Wastes ( Section 7)
Part C- Section 8: Filling of Procurement & Sales Details The various details which have to be provided include: Name of entity, Address, Mobile No Year of procurement ; Plastic material Type Category of plastic (for CAT-I container size( >09L and <4.9L, >4.9L &<0.9L)to be selected) GST details of seller; Total quantity to be procured Percentage of recycled plastic; Invoice No. Plastic packaging can be procured from Registered as well as unregistered entities In case of procurement from Registered entity “Invoice Number” generated from EPR Portal is to be keyed in and details shall be auto populated. In case of procurement from Unregistered entity details as required is to be keyed in GST invoice is to be uploaded wherever applicable as per GST Act 2017 ( as amended) Checks & Balance : Section 8 data should match with Sec 7
Part C ( Section 8) – Plastic Packaging Procurement
Procurement Details (Unregistered entity )
Detailed view of procurements details
Sales details and invoice generation
Detailed view of sales transection
Part D: EPR target Category wise EPR Target Auto-generated on the Portal based on information provided in the Application
Checklist The user shall fill in the Checklist prior to filing the application to ensure filing of error free application
Payment of Application Fees
Late fees Mechanism
3 .0 Post Registration EPR Implementation
Real time procurement / sales transactions are to be recorded on the portal by Registered Entities Entries have to be made for the current financial year . Post Registration EPR Implementation A. Real time data entry
In case of material transaction between registered PIBOs, details of procurement shall be auto populated in buyer section once invoice is generated by seller. In case of material transaction between unregistered PIBOs, following details need to be keyed in Name of entity, Address, contact no. Plastic material Type, Category of Plastic Category of plastic GST details of seller Total quantity to be sold Percentage of recycled plastic content Invoice No. Document required :PDF copy of invoice issued to the seller to be uploaded . Procurement details A . Real time data entry
Procurement details Unregistered Entities A . Real time data entry
A . Real time data entry Sales details
Sales details and invoice generation A . Real time data entry
Recycling/ EOL certificates: To be issued by PWPs Use of Recycled Plastic certificates: To be issued by producers/ brandowners Reuse of rigid plastic packaging: By brandowners Roadmaking: Self declaration by PIBOs Certificate generation by different entities on the EPR Portal Availability of certificates in different categories to be displayed on the Portal Transfer of certificates on the Portal Post Registration EPR Implementation B. Generation & Transfer of EPR Certificates
2 .0 Registration of Plastic Waste Processors (PWPs )
1.0 Company details : Same as PIBO Additional details: Plot Area & No. of Workers deployed Note: Plant address to be given as Registration address 2.0 GPS Location Maximum possible resolution to be provided on the Google map Note : Should match with plant address 3.0 Authorized Person Details : Same as PIBO 4.0 Date of Commencement of Operations : Same as PIBO 5& 6 Registration & Renewal Application details : Same as PIBO PWP Application Form
PWP Application Form
7. Category of Processing ( 11 Processing Code) R1: Recycling of CAT-: I PW to Pellet/Chips R2 : Recycling of CAT-II PW to Pellets/Chips R3 : Recycling of CAT-Ill PW to Pellets/Chips/ fibers R4 : Recycling of CAT-I PW to Products R5 : Recycling of CAT-II PW to Products R6 : Recycling of CAT-Ill PW to make Products C1: Processing CAT-IV PW for industrial composting E1 : End of life PW co-processing in cement plants E2 : End of life PW co-processing in steel plants E3: End of life PW processing in Waste to Energy plants E4: End of life PW processing in Waste to Oil Units PWP Application Form ( Continued)
8.0 Process Flow Diagram(Same as Producers) Note: Should be compatible with category of processing 9.0 Consent Details: Same as PIBOs Additional : Details of Authorization details under HWM Rules to be provided 10. Geotagged Pictures & Video Raw material Storage Production Area Product dispatch area Video Link Note: Should match with Process code & PFD GPS location should match with GPS location of plant PWP Application Form ( Continued)
PWP Application Form
PWP Application Form
11 . Plant machinery Name & Geotagged Picture Power rating, Operating Hours, Processing capacity Note : Should match with Process code, PFD & Geotagged pictures/video GPS location of pictures should match with GPS location of plant 12. Plastic Waste processing capacity Plastic Waste category Process code Processing capacity Product Production capacity Note: Specific provisions for Waste to Energy /Co-processing plants Processing capacity is w.r.t Plastic waste which is processed Production capacity is w.r.t Product manufactured PWP Application Form ( Continued)
PWP Application Form ( Continued) 13. Power Load of the Plant Electricity bill to be uploaded Note: Should match the processing capacity & power rating of machines 14. Waste Management details : As per PWM Rules 15 . Details of Disposal Facility : As per PWM Rules 16. Pollution Control Measure : As per PWM Rules 17. Disaster Management Plan Details of On-site & Off-site DMP to be provided 18 & 19: Signatures, Any Other Information & Enclosures : Same a PIBO Application
PWP Application Form
PAN, GST, GIN of the Company Aadhar / PAN of Authorized person Process flow diagram Consents under Air/ Water Act & Authorization under HWM Rules Geo-tagged pictures of raw material storage, production & product dispatch area Geo-tagged pictures of plant machinery Copy of Electricity Bill Copy of Analysis report of characterization of waste generated Copy of documents giving Occupational safety and health aspects Copy of document giving details of pollution control measures Copy of onsite /offsite Disaster management plant Covering letter Document regarding any other information which the unit wishes to provide Checklist of Documents
Sl. No Plastic Waste Processing ( TPA) Application Fees ( Rs ) 1 < 200 5000 2 200-2000 20000 3 >2000 50000 Fees for renewal of Registration shall be same as same as Registration fee. 25% of Application fees is to be paid as Annual Processing Fees at the time of filing annual return Waiving off of Resubmission fees Relaxation in payment of re-submission fees given till September 15, 2022 to facilitate Registration of PIBOs/PWPs whose application was in “Not approved” category Late fee mechanism to become operational after updation Application Fees & Annual Processing Charges