2022-kiic-presentaion-english membantu untuk presentrasi

maryamunaharti 73 views 25 slides Jul 03, 2024
Slide 1
Slide 1 of 25
Slide 1
1
Slide 2
2
Slide 3
3
Slide 4
4
Slide 5
5
Slide 6
6
Slide 7
7
Slide 8
8
Slide 9
9
Slide 10
10
Slide 11
11
Slide 12
12
Slide 13
13
Slide 14
14
Slide 15
15
Slide 16
16
Slide 17
17
Slide 18
18
Slide 19
19
Slide 20
20
Slide 21
21
Slide 22
22
Slide 23
23
Slide 24
24
Slide 25
25

About This Presentation

this is KIIC Catalog


Slide Content

2022

Pride of KIIC
The pride of KIIC, extending to every corner.
The pride of industrial estate development .
The pride of the tenant companies.
1

2
Table of the Contents
1 7 points of KIIC that make it easy to focus on production activities
2 Location Map of Industrial estates
3 Access/ Surrounding infrastructure
4 Karawang Regency over view
5 Development concept / Access
6 Development
7 Tenant
8 Infrastructure
9 Rental services
10 Security system
11 Support service
12 Supporting facilities in the estate
13 CSR・Industry-academia collaboration programs
14 Map of hospitals and residential facilities
15 Flow of Purchasing the land and start operating
3
4
5
6
7
8
12
13
16
17
18
19
20
21
22

© Karawang International Industrial City
7 points of KIIC that make it easy to focus on production activities
Access
Directly connected to toll roads.
A convenient hub that is also easily
accessed from the sea and air.
Development
Designed and constructed by Japanese
companies. Target to developed the land
Specialized for industrial land-use.
Infrastructure
We ensure stable supply of
Electricity, Water, Gas, Telecommunication,
and Fiber connection
Security
The Indonesian government
recognized us as a
“National Vital Object”
Support services
KIIC got awarded by the
Indonesian government
for its service.
Supporting facilities
Peace of mind for a lifestyle.
Convenient one-stop facilities.
CSR
There are various CSR activities to
support coexistence and co-prosperity
with the local community.
3

© Karawang International Industrial City
Location
map of
industrial
estates
New Patimban international port
(under construction,Dec/2020 Partialy
Opened)
Tanjung Priok
International Port
Soekarno-Hatta
International Airport
Jakarta-Bandung
High-speed Rail
Outer Ring Road II
EJIP
MM2100
BEKASI FAJAR
DELTA SILICON
HYUNDAI
GIIC
JABABEKA
SURYA CIPTA
BUKIT INDAH INDOTAISEI
MITRA KARAWANG
Japanese industrial estate (industrial estates mainly led by Japanese capital )
Industrial estates operated by local companies
Purbaleunyi
Toll Road
4

© Karawang International Industrial City
Access /
Surrounding
infrastructure
A convenient hub that is easily accessed from land, sea and air.
Jakarta - Cikampek
Toll Road
About 46 km point
※Toll gates directly connected to the industrial area
To Soekarno-Hatta
International Airport
About 80 km
Tanjung Priok
International Port
Plans for Jakarta - Cikampek II
South Toll Road
Straight-line distance to
new Patimban port
(2020 partially opened)
In the future
Toll road to new
Patimban international port
(Scheduled 2024 Opened)
Jakarta Cikampek II
South Toll Road(Scheduled 2023 Opened)
Jakarta Cikampek Toll Road
Outer Ring Road II
(Scheduled 2023 Opened)
Purbaleunyi
Toll Road
Jakarta-Bandung
High-speed
Rail(Scheduled 2023
Opened)
Tanjung Priok
International Port
New Kertajati
International Airport
MRT
Soekarno-Hatta
International Airport
About 60 km
About 70 km
5
Jakarta - Bandung High-Speed Rail
Karawang Station
(Scheduled to commence
operation in 2022)
((Scheduled 2023 Opened)
New Patimban international port
(under construction,Dec/2020 Partialy
Opened)

© Karawang International Industrial City
Karawang
Regency
Overview
50-5445-4940-4435-3930-3425-2920-2415-19
Men 60,39873,92088,91297,486102,89105,06112,19111,38
Women57,70070,39684,61594,454101,6299,85399,307101,03
Total118,09144,31173,52191,94204,51204,91211,50212,41
0
50,000
100,000
150,000
200,000
250,000
Population by age(2020)
Total Population 2,370,488 (2020)
(Men) 1,213,004 (Women) 1,157,484
Easy to secure workers (Manpower)
Adjacent to Jakarta metropolitan
area (JABODETABEK) ,a large
consumption area

Minimum Wage 4,798,312(2021) 4,798,312 Rp(2022)
Rate of up 0.00%
Working population in KIIC
:approximately 60,000
72% of Resident is 15th -64th
6
15 - 54 Resident 1,461,230
(Men) 752,242 (Women) 708,988
the gateway to
Bandung,

central and east Java

© Karawang International Industrial City
DELTA SILICON
DELTA SILICON
GIIC
DELTAMAS CITY
LIPPO CIKARANG
JABABEKA
SURYA CIPTA
Bypass
Cikarang Pusat
toll gate
New toll gate
(planned)
At 41km point
Karawang Barat 1
toll gate (north)
Karawang Barat 2
toll gate (south)
Cikarang Japanese School
(CJS)
Convenient access from the city
areas of Kawarang to KIIC
via ordinary roads
Development
concept/
Access
Smooth access with direct links to toll roads.
There are 2 exits from the Highway,
the North and South sides.
One of the exits is directed to KIIC,
there are only a few general vehicles
entering KIIC.
Thus, the traffic inside the Estate
is well organized.
Convenient access from
regular roads
Construction is underway to develop a single-direction
two-lane road from the city center of Karawang to KIIC.
Using the bypass, it is possible to travel from the center
of Karawang Regency in the direction of Cikarang and
Cikampek.

Industrial
estates
Residential and
commercial areas
7

© Karawang International Industrial City
Water treatment
facility
PLN substation
PLN substation
Water treatment
facility
Water treatment
facility
Logistics
Warehouse 1
Water treatment
facility
Stage 4 160ha
Less than 10 minutes by car
from interchange
Phase I 465ha
Phase II 398ha
Phase III 351ha
Development
Embodying the trust and
track record of Itochu.

Target to develop
for industrial land-use
This area is not a complex development that
includes commercial and residential areas,
there is no mixing of industrial vehicles and
general vehicles. There is also little risk of
traffic congestion in the future.
Developer
Joint development by Itochu
Corporation and leading Indonesian
corporate group Sinarmas
Period of development
Phase I area
465ha Construction started in 1993
Phase II area
398ha Construction started in 1995
Phase III area
351ha Construction started in 2010
Phase Ⅲ (Stage4) 160Ha On sale

Phase Ⅲ(Stage5)105Ha under development
Sold
out
Some lots available
Well-maintained roads in the industrial estate
To ensure that travel is smooth and comfortable at all times, all effort is
constantly made to maintain roads. To prevent traffic accidents, dampers are
set up where it is necessary to force vehicles to
reduce speed. Those living in the vicinity are
employed to clean the roads every day, as part of
efforts to maintain a clean and hygienic landscape.

8
Stage5 105 ha
New Expantion
Logistics
Warehouse 2

© Karawang International Industrial City
Global network
Expanding a wide range of businesses at approximately 100
bases in 62 countries around the world.
Other Project in Indonesia
PJ name Tanjung Barat Grand Hyatt Hyatt Regency/Andaz








Location 15km from JKT CBD Bali(Nusa Dua) Bali(Sanur)
Asset type Condominium Hotel Hotel
PJ scale 189 Room 630 Room 375/144 Room
Developed Industrial Park
PJ name AMATA CITY CHONBURI AMATA CITY RAYONG AMATA CITY BIENHOA








Location Thailand Thailand Vietnam
Number of tenants About 700 About 300 About 150
Developed size About 4,000ha About 2,300ha About 700ha
ITOCHU Corporation
Herein Indonesia
Total 27 subsidiaries/affiliates
・PT. ITOCHU LOGISTICS(Logistics)
・PT. ANEKA TUNA INDONESIA (Tuna Can)
・PT. MARUBENI ITOCHU STEEL (Steel Trading)
・PT. CTC Techno Solutions Indonesia(IT)
Found In 1858
Number of employees
(Including group)
128,164
Head office locations Tokyo Osaka
Net Profit(FY20) USD 3,788M
Total asset(FY20) USD101B
Credit rating
Moody’s :A3(stable)
S&P :A(stable)
Others
USA Fortune magazine
Selected as a Global 500
company (71st)
Wide range of goods and services
To provide a range of goods and services that will support people's lives, the ITOCHU Group operates
in a comprehensive array of business domains, from upstream areas, such as transactions involving raw
materials, to downstream domains, such as retail.
Global Partnership with reputable companies
ITOCHU made strategic business alliance and capital
participation with China's largest conglomerate CITIC
Limited and Thailand's leading conglomerate Charoen
Pokphand Group Company Limited.
SPC
Acquired 20% shares
Equivalent to USD 11B
During 1990-1996, ITOCHU invested in 20% shares of Thailand industrial developer
Amata Corporation and jointly developed industrial park in Thailand and Vietnam.
Until today, ITOCHU still has a part of shares and helps sales activities in parallel with
seeking for opportunities to collaborate.

9

© Karawang International Industrial City
Sinarmas Group is a conglomerate which spread throughout the Southeast
Asia centered in Indonesia, which have many kind of business.

There are 7 main business pillar in Sinarmas Group, It consist of more than
100 companies, which includes the Palm Oil Company, Sinar Mas Agro
Resources &Technology, and the biggest Paper production company, Asia
Pulp& Paper .

Sinarmas Land is operating in the real estate sector for more than
40 years. The development is in more than 5 countries, 24 cities,
for Township, Residence, Hotel/ Golf Course, Commercial Facilities,
and Industrial Estates.
It is the core of real estate business in the Sinarmas Group and
a Public Listed company in Singapore.
10
Established in 1938
Eka Tjipta Widjaja (Founding Father) started Sinar Mas
14 public listed companies in Indonesia and Singapore.
Has more than 380.000 direct employees, with at least 3
million jobs in the value chain.
3 major initiatives foundations and philanthropy,
4 education institutions, 1 hospital.
7 Main business pillar
About Sinarmas Group and
its Development
BSD City
Kota
Deltamas
Grand
Wisata
Kota
Wisata
Grand
City
Balikpapa
n
Township
Financial Service
Real Estate
Energy Infrastructure
Communication
Technology
Pulp &
Paper Product
Agribusiness
and food
Healthcare
Developed Industrial Estate
Other Development Projects
PJ Name KIIC GIIC








# of Tenants About 170 About 140
Development Area About 1,400 ha About 1850 ha
Name Grand Wisata Kota Wisata








Location Bekasi Cibubur
Type of Asset Township Township
Name Paddington ITC BSD City
Location Surabaya BSD City
Type of Asset Housing Commercial

© Karawang International Industrial City
Development
High quality and reliable management by Japanese companies.
Development and design by a Japanese consulting company

Land preparation by Japanese general contractor
Design: Nippon Koei
Construction: Takenaka Civil Engineering & Construction, TOKYU CONSTRUCTION CO., LTD., etc.
Construction of water supply and drainage plant: Kurita Water Industries Ltd.,
Chiyoda Corporation, Toshiba Infrastructure Systems & Solutions Corporation
&
KIIC Japanese civil engineer supervise the land preparation work
The overall design of KIIC was undertaken by the local subsidiary
of Nippon Koei. Japanese quality has been incorporated into the
development, including flood assessment, rainwater drainage
design, factory wastewater design (gravity system), and logistics
and traffic flow design. Rainwater drainage design is reviewed
every year to take into account the changing weather conditions
every year. KIIC itself
is also being developed
on an area higher than
the surrounding areas.
There is very low
probability of flooding
inside KIIC.
Design for the development of the industrial estate
Site preparation is carried out by a
general contractor from Japan, based on
the development design by the local
subsidiary of Nippon Koei. There is
Japanese civil engineer who is very
familiar with the topography and
Geology of the land. These engineer
monitor the preparation work.
Site preparation work
11
Pride of
Experienced and excellent
Japanese civil engineers who
understand the characteristics
of Indonesian soil (expanded
soil) and climate (rainy season
and dry season) are in charge
of management and
supervision.

© Karawang International Industrial City
Major Tenants of KIIC
■ Toyota Motor Manufacturing Indonesia

■ Yamaha Indonesia Motor Manufacturing

■ Astra Daihatsu Motor

■ Asian Isuzu Casting Center

■ Sharp Semiconductor Indonesia /
Sharp Electronics Indonesia

■ Uni-Charm Indonesia

■ Ajinomoto Indonesia

■ Kao Indonesia
■ P&G

■ Philip Morris

■ Firmenich

■ IFF

■ Voith Paper Rolls Indonesia

■ Linde

■ Schutz Container Systems Indonesia

■ Posco IJPC

■ DongSeo

■ Hua Yii

■ Fu Siung


・Harmonious coexistence of different industries
・Many companies with a strong awareness of
environmental compliance
Sharing of values
12
Tenant

© Karawang International Industrial City
Infrastructure
Electricity (State-owned PLN)
Priority
supply
contract
Stable power supply from
4 routes
Drawn from two directions of the Java-Bali line
Dedicated transformer substation
within KIIC (Pinayugan)
ROUTE
1 240MW
External transformer substation 1
(Peruri)
ROUTE
2 180MW
External transformer substation 2
ROUTE
Additional 60MW
Dedicated transformer substation
within KIIC (Margakarya)
ROUTE
3 120MW
Tenant companies are grouped through looping system
and designed to prevent any electricity problems in a
company to impact the entire estate. In the event of any
Electricity problems within the same group, the system
allows for power to be supplied from the opposite direction.
First in Indonesia
Realizing the procurement and stable supply of electricity
through the application of
Premium Service (priority supply contract).
13
For Back up (Mekarsari)
Cibatu Sub.
Cibatu Baru Sub.
MeKarsari Sub.
(Back up)1unit×60MW
MargaKarya Sub.
2unit×60MW

Pinayungan Sub.
4unit×60MW
Peruri Sub.
3unit×60MW
KIIC Power Environment(High Voltage line ・Substation Location)
Map)
500KV High Voltage line
150KV High Voltage line
Pride of
Due to the use of
the looping system
and the smooth
cooperation
between KIIC and
PLN, the actual
power outage time
in 2021 is within
about one hour.

© Karawang International Industrial City
Industrial water and wastewater plant
Raw water obtained from Tarum Barat Irrigation water.
Proprietary
to
KIIC Designed and constructed by a Japanese company
that specialized in Industrial Water Plant
Two industrial water supply plants,
four wastewater treatment plants
Industrial water
supply capacity 35,000t/day
Two reservoirs located in the estate as emergency back-up water supply.
The amount of water can be met the needs for more than two weeks
for all tenant companies
Wastewater treatment facilities set up in four areas in the estate.
Its operation is certified with ISO9001 and ISO14001, OHSAS18001
Wastewater
treatment capacity 36,000t/day
Infrastructure
14

© Karawang International Industrial City
image
Natural gas pipeline has been buried in the
industrial park by PGN
image
15
6 providers provide services
(No optical fiber laying)
Telecommunications
and the Internet Connection
Telephone Internet
There are six service providers in KIIC, including the
Japanese one. Five providers buried their own
optical fiber cable and developed their service.
NTT Communications has the most capacity among these
providers.
Natural gas
(state-owned PGN)
Infrastructure
The streetlights along the roads in KIIC are computerized to manage the
brightness of each street light individually.
According to the surrounding environment, the cloud system control and
optimize the brightness in every moment.
It is an environment-friendly street light that does not consume energy
unnecessary.
Intelligent Street Lighting System

© Karawang International Industrial City
Services available even
for small-scale business
Various rental services are available to assist tenants
to start their businesses quickly and reduce their initial investment.
Rental
services
5 points that are unique to KIIC
Fully equipped with high-quality
basic infrastructure
Able to use other supporting
facilities in the Estate
Offering courteous advice
and support from
the management office
Introducing professionals in various areas such as
the establishment of company, accounting, employment
Rental factory
Area : 1,500 – 3,500 ㎡
(Standard single-story factories Total 12)
Contract period : 3 years
Renewable, may cancel contract before
expiry (conditions apply), monthly payment
Rental warehouse Rental office
Area : 18 – 250㎡
Can be used as a temporary
office until the factory
is established
16
Area :First WH ~ 20,000㎡
5000㎡×4(expandable)
:Second WH ~ 20,000㎡
5000㎡×4(expandable)

© Karawang International Industrial City
Security
system
Security posts set up
in three locations
at KIIC’s entrance
2
(Two of them are used as
police stations.)
24-hour (three shifts)
security system
provided by
150 security staff
3
Security system in cooperation with
Karawang Regency government,
Karawang police, and Telukjambe police
4
The surveillance cameras
in KIIC are shared with
Karawang Police and can be
monitored by them as well.
Equipped with three fire trucks
and one ambulance
5
150 in-house security staff. Close cooperation with the government and the police.
Designated as “National
Vital Object” by the
Indonesian Ministry
of Industry since 2014.
1
As an important facility
for Indonesia’s economic
development, the government
is committed to providing
priority security services.
17

© Karawang International Industrial City
Support
services
Substantial support provided, based on more than 25 years of knowhow.
In the past two assessments of major industrial estates carried
out by the Indonesian government, KIIC was recognized and
commended as the Best Industrial Estate in 2013 and Excellent
Industrial Estate in 2015.
In particular, in the management service category we got the
first rank in both times. (The award system implemented only twice
in 2013 and 2015)
Best Industrial Estate.
More than 25 years of experience
and track record. History of
qualifications and awards.
Acquired:
ISO 9001
(Quality management system)
ISO 14001
(Environmental management system)
OHSAS 18001
(Occupational health and safety management system)
2002
Received the“Yasa Ayodhya Adinugraha”
award from the Indonesian Investment
Coordinating Board (BKPM)
2005
Received the “Best Achieved Foreign
Investment Company” award from the
Governor of West Java
2013
Recognized and commended in the first
“Best Industrial Estate.”* by the
Indonesian Ministry of Industry

2014
Designated as a “Biological Diversity Park”
by the governments of Karawang Regency
and West Java province
Recognized and commended in the second
“Excellent Industrial Estate.”* by the
Indonesian Ministry of Industry

2016
Designated as an industrial estate applicable for the
KLIK Program by the Indonesian Investment
Coordinating Board (BKPM).
This realizes significant reduction in the time
required for industrial construction start.
Staff with many years experience provide support when tenant companies run
into any problems. In addition, various information is provided and
consultation services offered as a part of efforts to create an environment that
allows companies to focus on their production activities.
2015
18
2020
Received the INDO 4.0 award by the Ministry
of Industry of Indonesia, for the title of Smart
Industrial Estate.

KIIC also has got the INDO 4.0 award by the Ministry of Industry of
Indonesia, for the title of Smart Industrial Estate in 2021

© Karawang International Industrial City
Restaurant
Japanese restaurant /
Indonesian cuisine/Fast food, etc.
A wealth of convenient supporting facilities.
Banks (8 banks)
RESONA / J TRUST / Danamon/
MAY BANK / BNI / MANDIRI / PERMATA / SINARMAS, etc.
Long-stay Golf View Hotel “PURI KIIC”
Sports and recreational facilities
Gym/Soccer field/Volleyball court
Clinic / Convenience store / ATM/ Telecom
office
Gas station
Mosque
One-stop service consolidated in one place so that users can complete their tasks at one go
Supporting
facilities in
the estate
19

© Karawang International Industrial City
CSR/
Industry-
academia
collaboration
programs
Aiming for coexistence and co-prosperity with the local community
●Providing baby food every month to children
under five in seven neighboring villages
Tenant association program
●Providing scholarship to selected high school
students (60 students) in seven neighboring villages
(To complement the support, KIIC also provides
a certain amount of scholarship separately to
280 junior and senior high school students)
●Spraying of mosquito repellent to counter dengue
fever, donations, and disaster relief activities, etc.
●Donation of supplies to schools, infant health
facilities, etc.
KIIC program
●Implementation of environmental conservation
activities in the neighboring regions
(tree-planting, setting up garbage bins),
health and safety activities
(blood donation, educational activities),
and support for economic independence
(support for startups, advice), etc.
●Also provides support for other cultural, arts,
and religious events in the local community
Joint CSR program
“Telaga Desa” (agro-environmental park)
●As an activity to contribute to the
community that involves the participation of
tenant companies, since 2008, KIIC has
begun operating and managing an
agricultural park (With guidance from
professionals, it provides knowhow on
vegetable farming, catfish farming, compost
making, mushroom farming, and tree
cultivation widely to the local community)
●Implementation of technical training programs for employees of tenant
companies in collaboration with Hiroshima University and Bandung
Institute of Technology (ITB).
Industry-academia collaboration programs
CSR Activities Q & A
Q
.
A.
We consider CSR activities
to be vital for conducting
business operations
smoothly in Indonesia, but
have many questions and
concerns…

image
If you join the KIIC tenant association, the Association implements a wide
range of contribution activities to the local community, so there is basically
no need for each company to engage in local community contribution
activities separately. As the management company also offers many
community contribution activities and programs that involve the
participation of tenant companies, your company can participate in these
programs to fulfill your obligation to report to the Indonesian government.
Activity reports are issued through KIIC.
20

© Karawang International Industrial City
Map of
hospitals
and
residential
facilities
Resinda
Mandaya Hospital
Greha Karawang
Karawang Indah
Karang Indah
Grand Taruma
Bayu Karta Hospital
Dewi Sri Hospital
Karawang
Public Hospital
Karaba Inda
Galuh Mas
Perumnas Bumi
Teluk Jambe
Rosela Hospital
Johar Permai
Bumi Karawang Baru
Citra Kebun Mas
Griya Kondang Asri
Greha Pratama Permai
Karawang Jaya
Bintang Alam
Sedana
Griya Indah
Central Medika Clinic
Jakarta Kyoai
Medical Services
Karawang Public Hospital KIIC±15min.
Bayu Karta Hospital KIIC±20min.
Dewi Sri Hospital KIIC±20min.
Mandaya Hospital KIIC±15min.
Rosela Hospital KIIC±8min.
Jakarta Kyoai Medical Services inside KIIC
Central Medika Clinic KIIC±8min.
Residence
21

© Karawang International Industrial City
Site visit
Your consideration
Investment
permit
acquisition
Local corporation
established
Sales
contract
conclusion
Land delivery(AJB

Land division
(HGB)
procedure
Construction permit
application
Environmental
permit application
Obtained
construction permit
1-3 month 3 – 5 month
Obtaining an
environmental permit
More than 6 month
Construction
started
Construction started
(KLIK designated industrial park)
Flow of
Purchasing
land and start
operating
Since KIIC is a KLIK certified industrial park, the start time of factory construction can be greatly
shortened.
We will firmly support your operation by using our many years of experience and deep ties
with local government offices.
※KLIK = KLIK designated industrial park.
KLIK (Direct Construction Investment Service) is a system that allows
investors to build a factory if they move into a specific industrial estate
before obtaining a government construction permit. You can apply for a
building construction permit and an environmental permit at the same
time while proceeding with the construction work. There are
32 industrial parks in Indonesia that are covered with this system.
Pride of
we strongly support
the acquisition of
land rights,
construction /
environmental
permits, and the
establishment of
relationships with
PLNs.
22
Significantly shorten the
operation period
Full support by KIIC

© Karawang International Industrial City
Pride of KIIC
Continuing to protect an environment that allows
companies to focus on production activities,
now, and into the future.
That is the pride of KIIC.
For all tenant companies
23

© Karawang International Industrial City
Contact
us
PT. MALIGI PERMATA INDUSTRIAL ESTATE
PT. HARAPAN ANANG BAKRI & SONS
PT. KARAWANG TATABINA INDUSTRIAL ESTATE

Person in Charge; Ota, Nakamura, Chali
Tel; +62-811-1330-7615 (Ota)
Mail; [email protected] (English / Japanese)
[email protected] (Indonesian / English)
Website; http://www.kiic.co.id
Tags