Points to be considered for planning of green Points to be considered for planning of green
house constructionhouse construction
1. Site selection - size and future expansion1. Site selection - size and future expansion
2. Water supply - source - well, tank, pipeline, 2. Water supply - source - well, tank, pipeline,
river, etc.river, etc.
3. Fencing - type, gate, cattle trap, etc.3. Fencing - type, gate, cattle trap, etc.
4. Greenhouse - design, plant layout and 4. Greenhouse - design, plant layout and
working drawingworking drawing
5. Plant system - soil, pot, bags, platform or soil 5. Plant system - soil, pot, bags, platform or soil
less medialess media
6. Irrigation - drip, sprinkler and ridge- furrow6. Irrigation - drip, sprinkler and ridge- furrow
7. Ventilation - natural, forced and openings7. Ventilation - natural, forced and openings
8. Environmental factors - temperature, RH, 8. Environmental factors - temperature, RH,
carbon dioxidecarbon dioxide