About This Presentation
PPT FOR CASE STUDY OF ACROPOLIS MALL
Size: 62.46 MB
Language: en
Added: Aug 30, 2025
Slides: 22 pages
Slide Content
LIVE CASE STUDIES ARCHITECTURAL DESIGN STUDIO 5 ISHIKA BANIK A92204023012 B.ARCH, SEM 5 2023-2028 SRINJOY DUTTA A92204023002 B.ARCH, SEM 5 2023-2028 DEBANGAN CHANDA A92204023011 B.ARCH, SEM 5 2023-2028
INTRODUCTION Location: West Bengal, Kasaba , Sector B , Kolkata Project owner: Merlin Group Area: 74322.432 sq. m Orientation of building: NW-SE Acropolis is a mixed - use development with: 3 Floors basement parking: About 500 Cars 4 Floors Mall: 2.7 Lac sq. ft gross leasable area.
INDIA LOCATION 1858/1 Rajdanga Main Road,Kasba , Kolkata – 700107, India Topography : Gangetic alluvial plain with an average elevation of 9-11 meters above sea level. Geographical coordinates : 22.510 ° N 88.398°E
SUN PATH DIAGRAM January (Winter): Sun is lower in the sky, path is tilted south, shadows are longer May (Summer peak): Sun is almost overhead, very high altitude, shorter shadows, maximum heat gain. September (Monsoon end): Sun path shifts south again, moderate altitude, balanced light and shadow.
The building is oriented East–South-East to: Catch prevailing SE–SW breezes from the open field for ventilation and cooling. Avoid harsh West sun by placing service blocks and hotel on that side. Get softer morning/forenoon light from the East instead of strong afternoon heat. Fit the site context along Rash Behari Connector while opening to the stadium side. ORIENTATION
Hot and humid for eight months, and comfortable for four months. Summer (March to June): Temperatures – 25°C to 38°C Winter (November to February): Temperatures – 12°C to 27°C Average annual rainfall is 1,800 mm, with about 100 rainy days June to September. Temperature Graph Rainfall Graph CLIMATE
Nearest railway station- baliganj junction 2.6km Nearest airport- Netaji subhashchandraji Bos Airport 19.4km Nearest bus stop- Chakraborty para bus stop 120m Nearest railway station- Hawera station 17.8km Acropolis mall A CCESSIBILITY
SITE ZONING RASH BEHARI AVENUE CHAKRABORTY PARA ROAD GITANJALI ROAD ACROPOLIS MALL SITE
FACILITIES
FEATURES TOTAL AREA : 2,88,000 SFT. TOTAL CARPET AREA (IN SQ. FT): 80,000 SQ.FT TOTAL NO OF STORES : 93 NO. OF LIFTS : 16 NO. OF ESCALATORS : 8 NO. OF ENTRY POINTS : 2 NO. OF EXIT POINTS : 2 NO OF EXIT POINT : 2 PARKING AREA IN SQ. FT. : COVERED 1,00,000 SQ. FT
GROUND FLOOR 15 retail shops + shopper's stop = total retail = 16. S ERVICES RETAIL SHOPS CIRCULATION ENTRY/EXIT ZONING OF FLOORS
FIRST FLOOR 21 retail shops + shopper's stop = total retail = 22 . S ERVICES RETAIL SHOPS CIRCULATION ZONING OF FLOORS
SECOND FLOOR 27 retail shops + shopper's stop = total retail = 28 . S ERVICES RETAIL SHOPS CIRCULATION ZONING OF FLOORS
THIRD FLOOR S ERVICES FOOD STALLS CIRCULATION ZONING OF FLOORS 15 food stalls + multiplex (4 halls) + food court seating area. MULTIPLEX SEATING AREA
CIRCULATION Horizontal circulation: The elements present for circulation are: -passages, and -atrium The bridging passage is present on the third floor for ease of access. atrium passage Vertical circulation: The elements present for circulation are: -lifts -escalators -staircases lifts staircase
VERTICAL CONNECTIVITY: 4 escalator, 14 lifts and 5 staircase VENTILATION: Air condition are provided for air ventilation, not enough source of natural air ventilation. And for the light ventilation LED lights are used and also glass façade gives natural light in at day time (natural light ventilation) VENTILATION AND VERTICAL CONNECTIVITY
MATERIALS Exterior facade – Granite and Glass. Interior – Glass and Zinc panels. All materials used for construction are fire retardant. Glass walkway Exterior facade
FIRE FIGHTING Water based fire fighting system is provided in complex other than diesel. Sprinklers are provided in ceiling void above false ceiling. Landing valves with hose reel are provided on each floor near staircase/lift lobby. 5 Fire escape staircase.