Annnamayya Dam presentation made on behalf of Executive Engineer, Annamayya Project Division, Kadapa. At present Permanent Restoration of the dam is under progress


Slide Content

WELCOME ANNAMAYYA PROJECT RAJAMPETA(M), ANNAMAYYA DISTRICT

ANNAMAYYA PROJECT

Original Project details: The Project Comprises of Spillway Length of 94 Mts with 5 No’s of Radial Crest Gates and size of each Gate is 13.75 M x 14.00 M with Design spillway discharge capacity of 2,85,000 Cusecs and Earth Bund of Length 336 Mts ( Eroded during JAWAD Cyclone November 2021). TYPE OF SPILL WAY OGEE SPILL WAY SPILL WAY DISCHARGE CAPACIITY (As per 3D Model Studies) 2,17,000 Cusecs SAFE SPILL WAY CAPACITY 1,80,000 Cusecs ( Without overflow on D/S, R/S Wing & Prorection wall ) LENGTH OF DAM 430 M (INCLUDING SPILLWAY) LENGTH OF SPILL WAY 94 M LENGTH OF EARTH DAM 336 M

DEEPEST BED LEVEL = +181.650 M CREST LEVEL = +189.60 M SILL LEVEL OF SLUICE = +195.060 M FRL = + 203.600 M MWL = + 203.600 M TBL = + 206.650 M

INTENDED BENEFITS OF THE PROJECT AYACUT DETAILS Contemplated Ayacut under Annamayya Project 9105 Ha ( 22500 Ac) Khariff 13000 Ac (ID) Rabi 6500 Ac (ID) Wet Crops under 6 Nos of MI Tanks 3000 Ac (ID) Localized ayacut 10236 Ac Rabi in 12 villages of Rajampet & Pullampet Mandal in Annamayya District ( Gazette notification is under process ) MAJOR CROPS BANANA , PAPAYA , TURMERIC, PADDY DRINKING WATERSUPPLY SCHEMES 1. Drinking water supply to Rajampet Municipality 2. Drinking water supply to Pullampet Rural water Supply Scheme 3. Release of 0.190 TMC of water into Cheyyeru River during April and May for drinking water to Downstream villages in Nandalur and Penagaluru Mandals

Origin/cause of the issue JAVAD Cyclone November 2021. Due to Extremely Heavy rains in Nov 2021, the Irrigation tanks on upstream side of Pincha River and also Temporary ring bund at Pincha project itself have breached. This has resulted in over flooding the river in flash flood scenario and sudden increase in inflows at Annamayya Project . The spillway was unable to dissipate this unprecedented discharge as it is much more than its capacity. This has resulted in rise of water levels in reservoir above tank bund level, over topped the earthen dam on 19-11-2021 at early hours and bund completely eroded. Around 5,00,000 cusecs of inflow estimated as per Area slope method

ANNAMAYYA PROJECT AFTER JAWAD CYCLONE ON 19-11-2021

INSPECTIONS OF THE TECHNICAL EXPERTS COMMITTEE & CWC TEAM The technical committee formed under the chairmanship of the Engineer – in – chief, ( Technical), Vijayawada inspected the dam between 29.3.2022 to 31.3.2022 and conducted meeting 0n 5.5.2022 at Vijayawada. Discussions were made regarding the hydrology, designs and drawings of the restoration of the Annamayya project. The committee after detailed discussion recommended the 200 Year maximum flood discharge of 5, 60,000 cusecs for spillway maximum surplus discharge for restoration of Annamayya project . CWC inspected the project on 23 rd May 2022.

Technical Experts Committee Inspection of Annamayya Project on 29.03.2022

CWC TEAM INSPECTION OF ANNAMAYYA PROJECT ON 23.05.2022

NECESSITY OF RESTORATION OF THE ANNAMAYYA PROJECT To cater the needs of the existing project on drinking water schemes and contemplated ayacut, restoration of the dam is essential. Hence tentative drawings were prepared for additional spill way to accommodate additional spill way discharge and Non overflow concrete dam section in the balance eroded portion of earth dam .

PROPOSAL DESCRIPTION NAME OF WORK : LINE ESTIMATE FOR "PERMANENT RESTORATION WITH NOF CONCRETE DAM AND PROVIDING ADDITIONAL SPILLWAY FOR ANNAMAYYA PROJECT NEAR BADANAGADDA (V), RAJAMPET MANDAL OF ANNAMAYYA DISTRICT . EST. AMOUNT RS 801.00 Cr. ( AS PER SSR 2022 – 23)

PROPOSED NEW CONCRETE DAM: SALIENT FEATURES TOTAL LENGTH OF NEW DAM TO BE CONSTRUCTED – 336 M ( Excluding old spillway) LENGTH OF ADDITIONAL SPILL WAY _ 184.75 M LENGTH OF NOF SECTIONS L/S - 69.25 M, R/S - 82 M ADDITIONAL SPILLWAY DISCHARGE – 3,80,000 Cusecs. TBL +206.65 M FRL +203.600 M MWL +203.600 M CREST LEVEL OF ADDITIONAL SPILL WAY = +191.60 M NO & SIZE OF GATES IN ADDITIONAL SPILL WAY : 11 Nos of size of 13.25 M x 12.00 M. Each Vent discharge : 42800 Cusecs.

Why the action in proposal is required To provide an ayacut of 10236 acres in 12 villages and stabilization ayacut of 1526 acres under 6 tanks in Rajampeta and Pullampeta mandals . It also serves drinking water needs of Rajampeta municipality, Pullampeta rural water supply and Drinking water to the downstream villages of Nandalur and Penagalur mandals of Annamayya District. Major cropping pattern in the ayacut area is high yielding commercial crops like Banana, Papaya and Turmeric which are highly income generating crops to the farmers. The ryots are earning about Rs . 230 to 300 crores of revenue and enhancing the GDP of Government of Andhra Pradesh substantially in the drought prone area of Rayalaseema.

Approval sought The Line Estimate was prepared with current SSR 2022-23 and worked out to Estimate cost of Rs .801.00 Crores and submitted to the Government for according Administrative approval vide letter No: ENC(I) DCE(GDS)(OT1)/ AEE5/ANNAMAYYA Dt:22-08-2022. Soon after obtaining the administrative approval further process will be taken up for Technical Sanction, Calling tenders, finalizing agency and to start the work.