BC-II lec 6 pierand deep fdn.pptx

NisthaPathak2 287 views 50 slides Dec 30, 2022
Slide 1
Slide 1 of 50
Slide 1
1
Slide 2
2
Slide 3
3
Slide 4
4
Slide 5
5
Slide 6
6
Slide 7
7
Slide 8
8
Slide 9
9
Slide 10
10
Slide 11
11
Slide 12
12
Slide 13
13
Slide 14
14
Slide 15
15
Slide 16
16
Slide 17
17
Slide 18
18
Slide 19
19
Slide 20
20
Slide 21
21
Slide 22
22
Slide 23
23
Slide 24
24
Slide 25
25
Slide 26
26
Slide 27
27
Slide 28
28
Slide 29
29
Slide 30
30
Slide 31
31
Slide 32
32
Slide 33
33
Slide 34
34
Slide 35
35
Slide 36
36
Slide 37
37
Slide 38
38
Slide 39
39
Slide 40
40
Slide 41
41
Slide 42
42
Slide 43
43
Slide 44
44
Slide 45
45
Slide 46
46
Slide 47
47
Slide 48
48
Slide 49
49
Slide 50
50

About This Presentation

FOUDATION WEOIFHOLKSEF


Slide Content

BUILDING CONSTRUCTION-II BEG 116 AR LECTURE-6 DATE:

2. Pier foundation: A Pier foundation consists of a cylindrical column of large diameter to support and transfer large super-imposed loads to the firm strata below. Piers are holes filled with concrete which act as leg for foundation Piers are used when a heavy structure is to be built and the firm/hard strata is at reasonable depth Construction process comprises sinking vertical shafts and filling with concrete

2. Pier foundation: Fig: Pier foundation with arch

2. Pier foundation:……………… Difference between Pile and Pier foundation: Difference in methods of construction pile foundations transfer the load through friction and/or bearing but pier foundations transfer the load only through bearing pier foundation is shallower in depth than the pile foundation Pier foundation require less excavation

Types of Pier foundation: ( i )  Masonry or concrete pier  (ii)  Drilled caissons

( i )  Masonry or concrete pier : When a good bearing stratum exists upto 5 m below ground level, brick, masonry or concrete foundation piers in excavated pits may be used The size and spacing of the piers depends upon the depth of hard bed, nature of overlying soil and super-imposed loads

( i )   Drilled caissons  : The terms drilled caissons, foundation pier or sub-pier are also termed as cylindrical foundation. Drilled caissons are generally drilled with the mechanical means     A drilled caisson is largely a compressed member subjected to an axial load at the top and reaction at the bottom

Drilled caissons may be of three types :  concrete caisson with enlarged bottom   caisson of steel pipe with concrete filled in the pipe  caisson with concrete and steel core in steel pipe  

Drilled caissons   

3. Well foundation or caissons: “Caisson”- french word “ caisse ”- means box Well foundations or caissons are box like structure-circular or rectangular-which are sunk from the surface of either land or water to the desired depth Adopted for the construction of foundation of bridge , pier They are much large in diameter than the pier foundations or drilled caissons

3. Well foundation or caissons:……….. Caisson foundations are used for following purpose(or in following case): To transmit load of the structure to hard bearing strata lying below deep waters box

3. Well foundation or caissons:……….. Caisson foundations are used for major foundation works, such as for: bridge piers and abutments in rivers, lakes etc Wharves, quay walls, docks Break waters and other structures for shore protections Large water front structures such as pump houses, subjected to heavy vertical and horizontal loads

Well foundations or caissons are hollow from inside, which may be filled with sand and are plugged at the bottom. The load is transferred though the perimeter wall, called steining Well foundations are not used for buildings 3. Well foundation or caissons:……

3. Well foundation or caissons:……….. Types of caissons: Box caissons Open caissons or wells or well foundation Monolithic caissons Pneumatic caissons

3. Well foundation or caissons:………..

a. Box caissons: Box is open at top and closed at the bottom May be of RCC, steel or timber It is first built on land and then sunk in position The cavity is generally filled with sand Then the top of caisson is filled with concrete

a. Box caissons:……….

a. Box caissons:………. Source: Gurucharan pg 112

a. Box caissons:……………….. Box caisson is used in following case: When the depth of water is not more than 6 to 8m When the bed material is soft or loose

a. Box caissons:……………….. Procedure: First of all the base where caisson is to rest is leveled and consolidated If caisson is to rest on group of piles, the head of piles are leveled such a way that heads of pile lie on same plain The caisson is floated on site of use and slowly sunk by filling the cavity of box caisson with sand or gravel

a. Box caissons:……………….. Procedure:………… Sand filling helps in uniform distribution of load on soil The sand bed is sealed with concrete in order to confine soil in its position

b. Open caissons or well or well foundation Unlike box caisson open caisson is open at both top and bottom end Open caisson is a box of timber, metal or RCC Open caissons are known as well and if no. of well is two it is known as twin well and if more wells than these are called monolith Uneconomical – as heavy timbering is required Slow in construction- since greater earthwork required

b. Open caissons or well or well foundation Types of open caisson: Single well Multiple well or monoliths Cylinder Gurucharan pg 113 to 116

c. Pneumatic caisson Closed at the top and open (during construction) at the bottom The basic principle is to isolate the working chamber from the surrounding atmosphere Working process similar to the open caisson but in this caisson the working chamber is kept air tight

c. Pneumatic caisson The pressure of air in the shaft is kept higher than that of the water at the working depth so that the subsoil water may not enter the working chamber

FOUNDATION IN BLACK COTTON SOIL What is Black cotton soil? Having properties of shrinkage and swelling due to moisture movement through them Swells excessively when wet(wet during rain) and shrinks when dry This results cracks in wall and damage lintels, beams Have poor bearing capacity

Things to be considered while designing footing in black cotton soil: The safe bearing capacity of soil should be properly determined The foundation should be taken at least 50cm lower than the depth of moisture movement If the black cotton soil layer is at the top(1 to 1.5m) deep, the layer can be completely removed and foundation can be laid over non-shrinkable and non-swelling soil

Things to be considered while designing footing in black cotton soil:………………………… But if the black cotton soil is at greater depth than the foundation laid should not be allowed to be in contact with soil In this case the excavation of large width and depth is dug and insert the layer of sand around and beneath the footing Deeper piles and piers are used In case the bearing capacity of soil is low the foundation trench should be made hard

Things to be considered while designing footing in black cotton soil:…………….. Better to construct this type of foundation during dry season Types of foundation in black cotton soil: Strip or pad foundation Pier foundation Under reamed pile foundation

1. Strip or pad foundation: Some special design features as follows are adopted: When soil has little swelling pressure When soil has relatively high swelling pressure When soil has high swelling pressure When soil is soft and loose and bearing capacity is low

1. Strip or pad foundation:………….. When soil has little swelling pressure: A layer of of 60cm thick cohesion less sand is filled below the foundation bed and compacted Sand is also filled around the footing

1. Strip or pad foundation:………….. When soil has relatively high swelling pressure: By keeping alternate layers of sand and ballast/ mooram

1. Strip or pad foundation:………….. When soil has high swelling pressure : 25 to 30 cm thick and wide strips of concrete is laid over the compacted base of trench The space or gap between the two strips of concrete is filled with sand and is equal to the width of bottom of masonry Above this strip the foundation bed is laid Side of foundation laid with sand

1. Strip or pad foundation:………….. When soil has high swelling pressure:……….. 80mm dia pipe @ spacing 1.5m are placed through masonry and concrete reaching sand fill and pipe is filled with sand Plug may placed at the top of the pipe which can be removed and placed as per the work required

1. Strip or pad foundation:………….. When soil is soft and loose and bearing capacity is low: First of all 30 cm thick layer of ballast is rammed Over it 30cm thick layer of sand is filled Over it lies the concrete bed of foundation Sides of foundation filled with sand as usual

2. Pier foundation with arches: Piers are dug at regular interval and filled with cement concrete Piers rest on hard bearing strata Piers at the top are connected through concrete or masonry arch Above masonry arch the walls rest Sometimes beams are provided over the arch in case the arch is constructed of masonry

2. Pier foundation with arches:……… The arches are constructed high above ground level The gap allows the free vertical movement of soil during swelling and shrinkage operation

3. Under-reamed pile foundation: Under reamed piles are bored cast in situ  concrete piles having bulb shaped enlargement near base A Pile having one bulb is called single under reamed pile and having two is double underreamed pile The bearing capacity of the pile is increased by increasing the number of bulbs at the base The basic principle of under reamed pile is to anchor the structure at a depth where ground movement are negligible due to moisture variation or other reasons

Simple tools are required for construction of under-reamed  piles like spiral auger, under reaming tool, and boring guide For speeding up the construction bore and under ream for large diameter and deeper pile a  mechanical rig can be used 3. Under-reamed pile foundation:…………….

Diameter of the bulb is 2.5 times dia of piles stem or may vary from 2.5times the dia of piles The c/c distance vertical spacing between two bulbs(in case of multi reamed piles) vary from 1.25 to 1 .5 times the diameter of bulb Length of under reamed piles varies from 3 to 8m 3. Under-reamed pile foundation:…………….

FOUNDATION IN SLOPING SITE Generally, it's most economical to place wall footings at a constant elevation If the site or finished grade slopes along the length of the wall, however, the footing may end up a considerable distance below finished grade This is clearly not economical, as it requires extra excavation and material

Slope the footing with the site so its depth below the finished grade is nearly constant along its length FOUNDATION IN SLOPING SITE Step the footing so its depth below finished grade is not excessive at any point along its length Following options are preferred

FOUNDATION IN SLOPING SITE Sloped Footing Issues simple geometry and apparent ease in formwork construction. But create the following construction issues

FOUNDATION IN SLOPING SITE Sloped Footing Issues Vertical wall bars above the footing will have different lengths - increase the quantity of vertical reinforcement Horizontal reinforcing bars in the lower portion of the wall will also have different lengths because they are interrupted by the sloped footing will require trapezoidal formwork- so need modifications to standard rectangular formwork A sloped footing could be unstable, particularly on a very steep slope and Concrete placement and finishing could be difficult, and a stiff concrete mixture might be required to prevent the concrete from flowing downhill

FOUNDATION IN SLOPING SITE Considerations For Stepped Footings For a very long wall- stepped footing more economical

FOUNDATION IN SLOPING SITE Considerations For Stepped Footings It's generally more cost effective to minimize the number of steps. For example, it may be more economical to design for a 6 ft (1.8 m) change in elevation using three 2 ft (0.6 m) steps or two 3 ft (0.9 m) steps rather than six 1 ft (0.3 m) steps- This minimizes the number of wall sections to be detailed and formed

CAUSES OF FAILURE OF FOUNDATION AND THEIR REMEDIAL MEASURES ……………… Bc punmia pg 63

THANK YOU