LAGOS STATE GOVERNMENT MINISTRY OF WORKS & INFRASTRUCTURE BETHLEHEM GIRLS COLLEGE ABULA ADO, LAGOS. PROGRESS REPORT October 3, 2022 FREDERICK ROBERTS LIMTED 1
October 3, 2022 FREDERICK ROBERTS LIMTED 2 The project development is cited on a 2-hectare land and comprised of 3 distinct works listed below; Perimeter fence wall – 1245 meters Sand filling Library Building PROJECT DESCRIPTION
October 3, 2022 FREDERICK ROBERTS LIMTED 3 PROJECT SCOPE FENCE – I Foundation – Reinforced concrete inverted T-beam. Wall – Galvanized mesh wire fixed at intervals to galvanized steel pipes embedded into the foundation beam. B. FENCE – II Foundation – Reinforced Concrete Inverted T-Beam Wall – 9’’ sandcrete blockwork/Plastering Columns – 230mm x 300mm reinforced column Coping – Reinforced concrete coping C. SAND FILLING Sand filling to make up level, height 600mm with a 30% compaction factor commencing from ground level
October 3, 2022 FREDERICK ROBERTS LIMTED 4 PROJECT SCOPE D. LIBRARY BUILDING The building is developed on a 320m2 footprint and comprised of a. Ground Floor 2 office space Locker room Visitors’ convenience Library Hall Store Students’ convenience b. Mezzanine Floor Library Hall
October 3, 2022 FREDERICK ROBERTS LIMTED 5 GENERAL PROJECT ISSUE AND ACTIONS E. ISSUES AND OBSERVATIONS Fence Tilt – It was observed that the fence sloped against its vertical alignment and this could have been caused by the following reasons – The used of sandcrete walls as against the galvanized steel mesh, thus causing an over bearing effect on the soil. Low bearing capacity of the soil Earth movement caused by the use machines and equipment during sandfilling F. ACTIONS Affected walls as been marked and demolition of such tilted walls have commenced.
October 3, 2022 FREDERICK ROBERTS LIMTED 6 SUMMARY OF WORK PROGRESS – BLOCK A & D ( MCT )
October 3, 2022 FREDERICK ROBERTS LIMTED 7 WORK PROGRESS PICTURES – FENCE WORK LIFT STATION BASE CONCRETING LIFT STATION WALL CONCRETING IN PROGRESS LIFT STATION WALL CONCRETING IN PROGRESS LIFT STATION WALL CONCRETING IN PROGRESS
October 3, 2022 FREDERICK ROBERTS LIMTED 8 WORK PROGRESS PICTURES – LIBRARY PILING WORKS IN PROGRESS PILING WORKS IN PROGRESS PILING WORKS IN PROGRESS PILING WORKS IN PROGRESS
October 3, 2022 FREDERICK ROBERTS LIMTED 9 WORK PROGRESS PICTURES – SANDFILLING SANDFILLING WORKS COMPLETED SANDFILLING WORKS COMPLETED SANDFILLING WORKS COMPLETED SANDFILLING WORKS COMPLETED
October 3, 2022 FREDERICK ROBERTS LIMTED 10 WORK PROGRESS PICTURES – DEMOLISHED FENCE DEMOLISHED PORTION OF THE FENCE DEMOLISHED PORTION OF THE FENCE DEMOLISHED PORTION OF THE FENCE DEMOLISHED PORTION OF THE FENCE