Building project presentation & 6 STOREY BUILDING PROJECT.
Size: 5.79 MB
Language: en
Added: Apr 01, 2017
Slides: 23 pages
Slide Content
WELCOME TO OUR PRESENTATION 1
PRESENTATION TOPIC NAME: SIX STOREY BUILDING PROJECT 2
GROUP NO: 01 OUR GROUP MEMBER: NAME ID 12. Ruhul Amin 12306034 13. Afsana Yesmin Shathe 12306004 14. Fakrul Islam 13106099 15. Md. Rashedul Islam 13106009 16. Arman Chowdhury 13106051 17. Md. Arifuzzaman 13106037 18. Mst . Laboni Akter 13106003 NAME ID 1. Md. Arifujjaman 11306030 2. Md. Emdad Bhuiyan 12306063 3. Md. Jahurul Islam 12306028 4. A.T.M Fahad 12306055 5. Hafizur Rahman 13106052 6. Abdullah AL Mamun 12306076 7. Md. Masud Rana 12306067 8. Md. Ruhul Amin 12306101 9. Md. Firoj Amin 12306075 10. Sinjan Mallick 12106120 11. Md. Rahman Manna 123606093 3
ABOUT OUR PROJECT Project Name: Six story building project Project Location Plot-65, Road-02, Sector-10, Uttara Dhaka COMPANY NAME Building Technology and Ideas Ltd. ( bti ) Land Area 4.5 Katha Building Height Ground Floor + 5Floor (6 Storied ) Unit Single Unit (East Facing) Expected Completion December 2016 OWNER NAME Md. Supan . 4
A project is an endeavor that is undertaken to produce the results that are expected from the requesting party. INTRODUCTION Project design: A project may be design only Construction or a combination of design and construction Important Components of a project kickoff meeting Scope Budget Estimate and Schedule 5
Company Organogram 6
KICK OFF MEETING The Kick-Off Meeting gets us started; it introduces the project team, confirms the overall purpose and objectives of the project, determines the roles and responsibilities of the team members, and establishes ground rules for working together. The most important purpose is to get commitment to the scope and objectives of the project. The kickoff meeting for a new project is your best opportunity to energize the group and establish a common purpose toward completing the work . A kickoff meeting is the first meeting with the project team and the client of the project . This meeting introduces the members of the project team and the client and provides the opportunity to discuss the role of team member . There is a special discussion on the legalities involved in the project 7
OBJECTIVE Provide Equal Access and Flexibility History of Accessible Facility Design Beyond Accessibility to Universal Design To develop the management, quality and try to utilize they qualification about this subject. Increasing good communication skill of any project work as a project manager . 8
Utilize Cost Management Throughout Planning Design and Development Process Consider Non-Monetary Benefits Such As Aesthetics Historic Preservation Security and Safety COST-EFFETHETICS: 9
Initial budget : Initial budge depends on Building Size Building Cost Building Type 10
FUNCTIONAL/OPERATIONAL: Account for Functional Needs . Ensure Appropriate Product/Systems Integration . Meet Performance Objectives. AESTHETICS: Pertains to the physical appearance and image of building elements and spaces as well as the integrated design process. 11
PRODUCTIVE: Assure Reliable Systems and Spaces Promote Health and Well-Being Provide Comfortable Environments SECURE/ SAFE : Fire Protection Occupant Safety and Health Natural Hazards and Security 12
SUSTAINABLE: The main objectives of sustainable design are to reduce, or completely avoid depletion of critical resources like energy, water, and raw materials, prevent environmental degradation caused by facilities and infrastructure throughout their life cycle; and create built environments that are livable, comfortable, safe, and productive . LOCATION: This project building is situated in uttara model town at Dhaka district. It is very close to the main road. 13
TECHICAL DRAWINGS OF THE PLAN Structural Drawing: Typical floor plan 14
Column Layout Column section 15
Stair case 16
ESTIMATION: Estimate ore building based on required materials in cubic feet. This is approximate estimation. It is done only for giving primary idea to the owner, how much material may be required for build this six story building. Some extra materials may be required. And many other equipment may be needed in future those are not included here. they have done this estimate by finding total volume of specific material then calculate the volume of cement, sand, aggregate by its ratio. 17
MODERN ESTIMATE SOFTWARE http://www.architecture.onlinenewsvenue.com/how-to-cost-estimate-with-microsoft-excel-free-template-design/ 18
SCHEDULE The project schedule is the tool that communicates what work needs to be performed, which resources of the organization will perform the work and the timeframes in which that work needs to be performed. Schedule Benefits: The project schedule should reflect all of the work associated with delivering the project on time . Without a full and complete schedule, the project manager will be unable to communicate the complete effort, in terms of cost and resource, necessary to deliver the project . They have shown all information which helped for everyone understand in this part they have tried to mention that when there are started this work and how many times to spend to complete the project work. How many labor needed of their overall project work. Time is the main fact in scheduling when their owner has been given that project and how long time needed to complete that work. 19
Gantt Chart Examples for construction projects are an effective approach to start project management. Both a commercial building and residential construction Concept Draw PROJECT is a best software to get started any project. 20
CONCLUSION The construction site is a place where an engineer can acquire knowledge about a building project. The construction processes of column, beam, slab and stair have been learned. Making good communication with people like client, Labours etc. have been learned also. During the project work unexpected problems were occurring and how to overcome that problem in that situation have been learned. By applying theoretical and practical knowledge in construction site, the real engineering experiences have been acquired. 21