Charles River Pollution Control District - Presentation 2/5/09
shersteve
643 views
17 slides
Feb 06, 2009
Slide 1 of 17
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
About This Presentation
The presentation by the Charles River Pollution Control District to the Franklin (MA) Town Council on 2/5/09. The presentation provides an overview on the capital improvement plan, the reasons why it is needed, and the budget required to support it.
Size: 386.71 KB
Language: en
Added: Feb 06, 2009
Slides: 17 pages
Slide Content
Charles River Pollution Charles River Pollution
Control DistrictControl District
2010 Budget2010 Budget
15-year Capital Improvement Plan (CIP)15-year Capital Improvement Plan (CIP)
February 2009February 2009
District Wastewater Treatment FacilitiesDistrict Wastewater Treatment Facilities
District Wastewater Treatment FacilitiesDistrict Wastewater Treatment Facilities
Average daily flow to plant about 4.5 million
gallons per day (mgd)
Peak days double or even triple
220 miles of sewer lines contribute to plant
Seven communities contributing flow
–Franklin ~ 3.1 mgd
–Medway ~ 0.8 mgd
–Millis ~ 0.3 mgd and Bellingham ~ 0.3 mgd
–Norfolk, Dover and Sherborn < 50,000 gpd as
septage
District BudgetDistrict Budget
Significant budget increases for 2010 due to:
–Capital projects Capital projects
–Salaries and benefitsSalaries and benefits
–Chemical costs
–Maintenance costs
2011 through 2016 projected budget to be
within Proposition 2.5 %
Requested District Increase Over Prop Requested District Increase Over Prop
2.52.5
FY 2009 budget (O&M and capital)
2.5 % Increase
Sewer connections (CY 08)
Subtotal:
FY 2010 proposed budget
Difference :
* does not include 2.5% increase and sewer connections from CY08
Purpose of 15-Year CIPPurpose of 15-Year CIP
Required improvements to maintain
compliance with Federal and State Permits
Improvements necessary to keep plant
operating at current capacity
Equipment replacement expected after ~20
yrs operation to keep the facility in good
condition
Plan necessary expenditures and schedule
for implementation
Major Components of CIPMajor Components of CIP
National Pollutant Discharge Elimination
System (NPDES) permit compliance
Landfill closure
Plant process/mechanical improvements
Facility improvements
District’s I/I RequirementsDistrict’s I/I Requirements
Map and description of inspection and
maintenance activities/expenditures
Map of areas for inspection and maintenance
activities
Calculation of annual average I/I and maximum
month for previous year
Report of I/I-related corrective actions, including
unauthorized discharges
Landfill ClosureLandfill Closure
Existing Landfill
–Located adjacent to plant,
near parking lot, chlorine
building and outfall
–2.5 acres
–1979 to 1989 dewatered
sludge, grit and
screenings
–1989 to 2002 only grit and
screenings
–Closed since 2005
Process/Mechanical ImprovementsProcess/Mechanical Improvements
System for washing and compacting
screenings
Improved septage receiving facilities
Clarifier mechanism replacement
Conversion from gaseous chlorine to sodium
hypochlorite
Facility Improvements Facility Improvements
Brickwork: repair and replace
Roofs: replace plywood
underboards, recoat metal
Exterior doors: replace as needed
Windows: reseal and weather-
strip
Exterior walkways and platforms:
replace bricks where needed,
refinish concrete
Lime silo: recoat
Estimated Total Cost of CIPEstimated Total Cost of CIP
NPDES permit compliance
Landfill closure
Plant improvements
Facility improvements
Total:
*Note: all figures are escalated costs, with construction
planned between 2010 and 2014
$7.1 million
$1.9 million
$8.6 million
$1.8 million
$ 19.4 million
Expected Total Debt Service Expected Total Debt Service
2011 – 2012: permitting and design
–Interest on short term loan (short term borrowing)
2013 – 2014: design complete, construction
underway
–Interest on short term loan (~$150,000 per year)
2015 – 2034: all 15-year CIP construction
complete
–General obligation bond at 5% (~$1.55 million per
year)
Member Community AssessmentMember Community Assessment
Franklin
Medway
Bellingham
Millis
Norfolk
Dover
Sherborn
* All percentages based on total reserved capacity per community (total plant 5.7
mgd)
67.50 %
16.75 %
5.25 %
8.75 %
0.85 %
0.45 %
0.45 %
Franklin Community Debt ServiceFranklin Community Debt Service
67.5 % assessment of plant capacity
2013 and 2014: $102,000 per year
2015 through 2034: $1,050,000 per year