CII- SOHRABJI GODREJ GREEN BUSINESS CENTER CASE STUDY PPT

vk78512 21,438 views 21 slides Oct 23, 2018
Slide 1
Slide 1 of 21
Slide 1
1
Slide 2
2
Slide 3
3
Slide 4
4
Slide 5
5
Slide 6
6
Slide 7
7
Slide 8
8
Slide 9
9
Slide 10
10
Slide 11
11
Slide 12
12
Slide 13
13
Slide 14
14
Slide 15
15
Slide 16
16
Slide 17
17
Slide 18
18
Slide 19
19
Slide 20
20
Slide 21
21

About This Presentation

CII-SOHRABJI GODREJ GREEN BUSINESS CENTER ,HYDRABAD ,BEST POWER POINT PRESENTATION


Slide Content

1
CII–SOHRABJI GODREJ GREEN BUSINESS CENTER
HYDERABAD
CASE STUDY ON:-
FIRSTGREEN BUILDING OF PLATINUM RATING
PRESENTEDBY:-
VIVEK KUMAR
KAJAL KUMARI
AMAN KUMAR
DISHANK

2

3

4

5
CII –WON AN INTERNATIONALLY ACCLAIMED AWARD BY THE UNITED STATES
GREEN BUILDING COINCIL AS THE MOST ADVANCED BUILDING IN THE WORLD .
IT IS THE CENTER OF EXCELLENCE OF THE CONFEDERATION OF THE INDIAN
INDUSTRY FOR ENERGY ,EFFICIENCY,GREEN BUILDINGS,RENEWABLE
ENERGY,WATER ,ENVIRONMENT & RECYCLING AND CLIMATE CHANGE ACTIVITIES
IN INDIA .
THE GREEN INSTITUTE ENTERED INTO A STRATEGIC PARTNARSHIP WITH THE
CONFEDERATION OF INDIAN INDUSTRIES TO ESTABLISH THE GREEN BUSINESS
CENTER(GBC) AT HYDRABAD FOR PROMOTING GREEN ACTIVITIES IN INDIA .

6
THE BUILDING BOASTS OF LIGHTING ENERGY SAVING 88 % COMPARED TO AN
ELECTRICALLY BUILDING OF THE SAME SIZE .
VEGETATION THAT WAS LOST TO THE BUILT AREA WAS REPLACED BY GARDENS
ON 55% OF THE ROOF AREA .
THE BUILDING ACHIEVES A 35% REDUCTION OF MUNICIPALLY SUPPLIED
POTABLE WATER ,IN PART THROUGH THE USE OF LOW -FLUSH TOILETS AND
WATERLESS URINALS.
95% OF THE RAW MATERIAL WAS EXTRACTED OR HARVESTING LOCALLY.
AN IMPRESSIVE 77% OF THE BUILDING MATERIAL USE RECYCLED CONTENT.
A WASTE MANAGEMENT PLAN ENSURED THAT 96% OF CONSTRUCTION WASTE
WAS RECYCLED .
35% OF USERS HAVE SHIFTED TO ALTERNATIVE MODES OF TRANSPORTATION :
CARPOOLS,BICYCLES AND CARS THAT RUN ON LIQUEFIED PETROLIUM GAS ,AND
LOW POLLUTION DIESEL AND GASOLINE .
6

7
CENTRAL COUNTYARD.
ROOF GARDEN –PROTECTS HEAT PENITRATION ,CUTS DOWN
ISLAND EFFECT
HIGH PERFORMANCE GLAZING TO BRING IN NATURAL
LIGHT WHILE MINIMIZING HEAT INGRESS .
USAGE OF LIGHT GLAZING AND VISION GLAZING .
JALI WALL FOR BRINGING IN NATURAL LIGHT AS WELL AS
VENTILATION .

8

9

10

11

SOLAR PHOTOVOLTAIC
12

WIND TOWER WITH EVAPORATIVE COOLING
13
WIND TOWER

14

15

16
Root zone treatment process

FUNCTION OF JALI IN RAINS
17

18
18

19

20
ENERGYEFFICIENCY
DESIGN –ORIENTATION FOR MAXIMUM DAY LIHGT
AVOIDING GREEN WALL AND GREEN ROOF.
USE OF NEUTRAL GLASS TO REDUCE HEAT GAIN.
USAGE OF ENERGY EFFICIENT WHITE GOODS .
USE OF ZERO CFC REFRIGERATORS IN REFRIGERATION AND AIR –CONDITION.
ONLINE MONITORING SYSTEM TO MONITOR THE ENERGY PERFORMANCE .
ESTABLISHING BASELINE DATA FOR ENERGY CONSUMPTION.
USEOF ECO FRIENDLY ELECTRIC CAR FOR TRANSPORTATION AND TRAVELLING
WITHIN THE PREMISES HELPING IN PREVENTING POLLUTION

21