Civil Engineer Resume

9,095 views 3 slides Feb 02, 2016
Slide 1
Slide 1 of 3
Slide 1
1
Slide 2
2
Slide 3
3

About This Presentation

Civil Engineer with well knowledge in computer and site exicution


Slide Content

CURRICULUM VITAE
RAVI KUMAR TERLAPU
Contact: +91-9700635363
Passport No : H9252798
E-Mail : [email protected]
JOB OBJECTIVE
Seeking middle level assignments in the field of Construction Management and civil Execution
preferably in the civil industry
PERSONAL DETAILS
Date of Birth :17
th
April, 1985
Address : D. No. 12-2-9/2, Kannyyapeta, (Behind Green Park Hotel), Visakhapatnam (530002)
Languages Known :Telugu, English & Hindi
ACADEMIC QUALIFICATIONS
·B.Tech. from PHYDAH Engineering & Technology, Visakhapatnam JNTU University in 2010
·Diploma from(Civil Engineering)M.R.A.G.R. Polytechnic,Vijayanagaram S.B.T.E.T in 2006
·12
th
from ALPHA Junior College, Visakhapatnam Board of Intermediate Education Hyderabad in2003
·10
th
from M.N.R. school, Visakhapatnam Board of Secondary Education in 2000
IT& Other SKILLS
·Packages: AutoCAD& STADD Pro
·Operated Instruments: Auto Level
PROFILE SUMMARY
·An incisive professional with comprehensive experience of 6 years in the field of Project Management,
Site Execution, Construction Management
·Presently associate with L&T ECC, Rajasthan as a Senior Engineer
·Astute manager with a flair for adopting modern site execution methodologies and systems in
compliance with quality standards. Curriculum vita
·Adroit in leading detail programmers for the construction of major bridges, hydro power plants, tunnels,
highways, pipe rack, canals, etc.
·Expertise in swiftly ramping up projects with competent cross-functional skills and on time execution.
·Strong interpersonal relationship management, communication skills with the ability to develop a strong
network with project members, consultants, contractors with consummate ease
CORE COMPETENCIES
Site & Construction Management
·Supervising the entire of site and construction activities encompassing technical inputs for
coordinating site management activities
·Interacting with suppliers for achieving cost effective purchase of equipment, accessories and
material with timely delivery so as to minimize project cost
·Conceptualizing detailed project execution plans after thorough discussion with clients and
handlingselection of sites
ORGANISATIONAL EXPERIENCE
Since 2014- TillL&T ECC, Rajasthan as Senior Engineer
Project Undertaken:
Title : The Construction Works 2-Laning of Railway corridor 625 KM
Duration :4 years

Description :The basic purpose of the project was to construct 2 - line Railway corridor with
constructed Bridges and formation with level of sub Grade
Client : WDFC
Consultant : RITES
Cost of project : 7000cr
Role:
·Handling structural works in Minor And Major bridges
· Checking of Reinforcement placed & fixed with proper spacing and form work with respect to approved
working Drawing & specifications for foundation, sub-structure, super-structure with respect to RFI
submitted
·Taking care of structures in bridge works RUB, MIB’s, MJB structures and box culverts in railway
corridor
·Involved in the preparation of bar bending schedules for bridge drawings
·Executing the bending and built the structure as per drawings and bar bending schedule
·Shuttering or farm work are done as per drawing built
·Team of under my controle 80 pepoles
Highlight:
· Handled the billing of the site execution work
· Completed 7 MIB’s, 2 RUB’S, 1 MJB up to sub structure
Since 2013 to 2014 Master Associates, Interior Designers & Project Management Consultant as
Engineer at Visakhapatnam
Project Undertaken:
Title : Proposed Vodafone transport hub At Visakhapatnam
Duration : 6 Months
Client : Vodafone
Consultant : Master Associates, Interior Designers & Project Management Consultant
Project Cost : 4 cr
Role:
·Coordinating with Head office, Contractor and Clint site team
·Ensure execution as per design and drawing
·Day to day supervision of Constructional Activities
·Day to day monitoring of progress of work
·Maintaining Quality standards as per contract
·Maintaining a record of constructional activities
·Maintaining safely standards
·Checking of contractor bills
·Keeping a check on actual cost V/s Budgeted cost
Since Nov’2010- Feb’2013Navayuga Engineering Company Ltd., Jammu Kashmir as Site Engineer
Project Undertaken:
Title : The Construction Works for Rehabilitation, Strengthening and 4-Laning of Quazigund to
BanihalSection of NH-1A from Km189.350 to Km 204.700, including 2 Tunnels (2-lane) of
0.69 Km & 8.45 Km length in the State of Jammu & Kashmir
Duration :5 years
Description :The basic purpose of the project was to construct Tunnel 1 (approx. 0.69 Km) and Tunnel
2 (approx. 8.45 Km) with cross passages according to the New Austrian Tunneling
Method – NATM. In the method the vital part was Geotechnical Monitoring.
Client :NHAI
Consultant : SMEC
Project Cost : 2200cr
Role:
·Handling benching for tunnels & structural works in bridges

· Checking of Reinforcement placed & fixed with proper spacing and form work with respect to approved
working Drawing & specifications for foundation, sub-structure, super-structure with respect to RFI
submitted
·Taking care of structures in bridge works RUB, open foundation structures and box culverts
·Involved in the preparation of bar bending schedules for bridge drawings
·Executing the bendingand built the structure as per drawings and bar bending schedule
·Carrying out sub contractor bills, monthly R.A. bills and take certifications from client
·Preparing the Monthly Progress Report
·Managing the billing of the site execution work
May’2010 - Oct’2010Navayuga Engineering Company Ltd., Sikkim as Site Engineer (Site
Execution)
Project undertaken:
Title : Teastha Hydro- Power Plant (Tunneling) Stage-III (Sikkim)
Duration : 5 years
Description: The project was undertaken to carry the tunnel execution works like rock bolting, tunnel
profiling, drilling & blasting and short creation.
Project Cost : 1800cr
Role:
·Handling Profiling and checking the Rock bolts and short-creating for tunnels works in Hydro Power
Plant
·Profiling coordinates of Tunnel Execution work
SinceAug 2006- July 07 IDDCConsultancy,Visakhapatnamas a Site Surveyor & CAD Operator
Project Undertaken NCC
Title : The Project Thotapalli Right main canal of the Distribution canal and Branch canals Survey
and Alignment preparation
Duration : 1 year
Description :The project was One Distributaries canal 25Kms and 32 branch Canals survey and
Alignment preparation
Role:
·Prepared for Branch and Distribution canals
·Handled the Ayacutpreparation for the branch and distribution canals
·Carried the site surveys for the alignments and diverted structures
·Handling alignment Prepared and surveying
Place : Visakhapatnam
Date : (T.RAVI KUMAR)