cost estimate for oil and gas plant in petro

TarekKhafaga1 139 views 107 slides Jun 30, 2024
Slide 1
Slide 1 of 107
Slide 1
1
Slide 2
2
Slide 3
3
Slide 4
4
Slide 5
5
Slide 6
6
Slide 7
7
Slide 8
8
Slide 9
9
Slide 10
10
Slide 11
11
Slide 12
12
Slide 13
13
Slide 14
14
Slide 15
15
Slide 16
16
Slide 17
17
Slide 18
18
Slide 19
19
Slide 20
20
Slide 21
21
Slide 22
22
Slide 23
23
Slide 24
24
Slide 25
25
Slide 26
26
Slide 27
27
Slide 28
28
Slide 29
29
Slide 30
30
Slide 31
31
Slide 32
32
Slide 33
33
Slide 34
34
Slide 35
35
Slide 36
36
Slide 37
37
Slide 38
38
Slide 39
39
Slide 40
40
Slide 41
41
Slide 42
42
Slide 43
43
Slide 44
44
Slide 45
45
Slide 46
46
Slide 47
47
Slide 48
48
Slide 49
49
Slide 50
50
Slide 51
51
Slide 52
52
Slide 53
53
Slide 54
54
Slide 55
55
Slide 56
56
Slide 57
57
Slide 58
58
Slide 59
59
Slide 60
60
Slide 61
61
Slide 62
62
Slide 63
63
Slide 64
64
Slide 65
65
Slide 66
66
Slide 67
67
Slide 68
68
Slide 69
69
Slide 70
70
Slide 71
71
Slide 72
72
Slide 73
73
Slide 74
74
Slide 75
75
Slide 76
76
Slide 77
77
Slide 78
78
Slide 79
79
Slide 80
80
Slide 81
81
Slide 82
82
Slide 83
83
Slide 84
84
Slide 85
85
Slide 86
86
Slide 87
87
Slide 88
88
Slide 89
89
Slide 90
90
Slide 91
91
Slide 92
92
Slide 93
93
Slide 94
94
Slide 95
95
Slide 96
96
Slide 97
97
Slide 98
98
Slide 99
99
Slide 100
100
Slide 101
101
Slide 102
102
Slide 103
103
Slide 104
104
Slide 105
105
Slide 106
106
Slide 107
107

About This Presentation

oil and gas plant cost estimate


Slide Content

HERVE
BARON
Cost estimate of Oil & gas facilities
© 2013 – Hervé Baron
Welcome
to this presentation.
It explains how the investment cost for an Oil & Ga s
facility is estimated.
After a short introduction, the 3 common methods of cost
estimate are shown.
Common ratios, such as $/kg for equipment, pipe etc . are
given.
Comments are most welcome (
[email protected]
),
which I will incorporate for the benefit of all.
Hervé
Cost estimate of Oil & gas facilities

HERVE
BARON
Cost estimate of Oil & gas facilities
© 2013 – Hervé Baron
Agenda
Introduction
The different estimation methods:
• Capacity factored
• Equipment factored
• Analytical
Cost estimate of Oil & gas facilities

HERVE
BARON
Cost estimate of Oil & gas facilities
© 2013 – Hervé Baron
What will be the
overall cost of
this facility?

HERVE
BARON
Cost estimate of Oil & gas facilities
© 2013 – Hervé Baron
Cost = ∑Quantities * item costs How would you determine quantities?
All items

HERVE
BARON
Cost estimate of Oil & gas facilities
© 2013 – Hervé Baron
Quantities estimates: •Ratio from past projects
•Material Take-Off

HERVE
BARON
Cost estimate of Oil & gas facilities
© 2013 – Hervé Baron
Cost = ∑Quantities * item costs
How would you determine quantities?
What is an item cost made of?
All items

HERVE
BARON
Cost estimate of Oil & gas facilities
© 2013 – Hervé Baron
Item cost =Supply cost + installation cost
How would you each one?

HERVE
BARON
Cost estimate of Oil & gas facilities
© 2013 – Hervé Baron
Item cost estimates: Supply + installation
•In-house data from
past projects
•Inquiries

HERVE
BARON
Cost estimate of Oil & gas facilities
© 2013 – Hervé Baron
Item cost estimates: Supply + installation
•In-house data from
past projects
•Inquiries
Sensitivity to:
Raw materials

HERVE
BARON
Cost estimate of Oil & gas facilities
© 2013 – Hervé Baron
Item cost estimates: Supply + installation
•In-house data from
past projects
•Inquiries
Sensitivity to:
Raw materials
•Steel, alloy steel, copper,
cement, iron

HERVE
BARON
Cost estimate of Oil & gas facilities
© 2013 – Hervé Baron
Item cost estimates: Supply + installation
•In-house data from
past projects
•Inquiries
Sensitivity to:
Raw materials
Construction market

HERVE
BARON
Cost estimate of Oil & gas facilities
© 2013 – Hervé Baron
Sensitivity to: Raw materials
Construction market

HERVE
BARON
Cost estimate of Oil & gas facilities
© 2013 – Hervé Baron
Purpose of estimate:
• Concept screening
• Study of feasibility
• Decision to invest
Estimate type:
• Capacity factored
• Equipment factored
• Analytical

HERVE
BARON
Cost estimate of Oil & gas facilities
© 2013 – Hervé Baron
Purpose of estimate:
• Concept screening
• Study of feasibility
• Decision to invest
Estimate type:
• Capacity factored • Equipment factored
• Analytical

HERVE
BARON
Cost estimate of Oil & gas facilities
© 2013 – Hervé Baron
• Capacity factored
C1/C2 = (P1/P2)
e
e ~ 0.6
Ci: Cost of facility with production
capacity Pi

HERVE
BARON
Cost estimate of Oil & gas facilities
© 2013 – Hervé Baron
• Capacity factored
C1/C2 = (P1/P2)
e
e ~ 0.6
Ci: Cost of facility with production
capacity Pi
Exercise: what is the increase in cost for +50% capacity increase?

HERVE
BARON
Cost estimate of Oil & gas facilities
© 2013 – Hervé Baron
Exercise: what is the increase in cost for +50% capacity increase? In your opinion, what is the limit of such estimate? • Capacity factored
C1/C2 = (P1/P2)
e
e ~ 0.6
Ci: Cost of facility with production
capacity Pi

HERVE
BARON
Cost estimate of Oil & gas facilities
© 2013 – Hervé Baron
Exercise: what is the increase in cost for +50% capacity increase? In your opinion, what is the limit of such estimate?
It takes into
account neither market conditions nor plant location (labourcost)
• Capacity factored
C1/C2 = (P1/P2)
e
e ~ 0.6
Ci: Cost of facility with production
capacity Pi

HERVE
BARON
Cost estimate of Oil & gas facilities
© 2013 – Hervé Baron
• Equipment factored
C = f M
C: total installed cost of facility
M: cost of main equipment
f: factor

HERVE
BARON
Cost estimate of Oil & gas facilities
© 2013 – Hervé Baron
• Equipment factored
C = f M
C: total installed cost of facility
M: cost of main equipment
f: factor
Note: Typical figures for Petrochemical Plant

HERVE
BARON
Cost estimate of Oil & gas facilities
© 2013 – Hervé Baron
What’s the main equipment?
• Equipment factored
C = f M
C: total installed cost of facility
M: cost of main equipment
f: factor

HERVE
BARON
Cost estimate of Oil & gas facilities
© 2013 – Hervé Baron

HERVE
BARON
Cost estimate of Oil & gas facilities
© 2013 – Hervé Baron
How is the cost of main
equipment evaluated?

HERVE
BARON
Cost estimate of Oil & gas facilities
© 2013 – Hervé Baron
Process design
PFDs
H&M balance

HERVE
BARON
Cost estimate of Oil & gas facilities
© 2013 – Hervé Baron
• Equipment factored
C = f M
f: factor
f depends on
– type of facility (petrochemical, refining, LNG, of f-shore)
– Size

HERVE
BARON
Cost estimate of Oil & gas facilities
© 2013 – Hervé Baron
• Equipment factored
C = f M
f: factor
f depends on
– type of facility (petrochemical, refining, LNG, of f-shore)
– Size
Typical figures for a chemical plant
In your opinion, how can we refine the estimate?

HERVE
BARON
Cost estimate of Oil & gas facilities
© 2013 – Hervé Baron
• Equipment factored
C = ∑ fi Mi
Mi Cost of all type i Main equipment
fi: factor

HERVE
BARON
Cost estimate of Oil & gas facilities
© 2013 – Hervé Baron
• Equipment factored
C = ∑ fi Mi
Mi Cost of all type i Main equipment
fi: factor
Why do you think justifies such an approach?

HERVE
BARON
Cost estimate of Oil & gas facilities
© 2013 – Hervé Baron
• Equipment factored
C = ∑ fi Mi
Mi Cost of all type i Main equipment
fi: factor
Why do you think justifies such an approach?

HERVE
BARON
Cost estimate of Oil & gas facilities
© 2013 – Hervé Baron
• Equipment factored
C = ∑ fi Mi
Mi Cost of all type I Main equipment
fi: factor
In your opinion, what is the limit of such estimate?

HERVE
BARON
Cost estimate of Oil & gas facilities
© 2013 – Hervé Baron
• Analytical
–Main equipment supply + install
–Piping supply + install
–Electrical supply + install
–Instrumentation & Control system supply + install
–Civil Works
–Steel structures
–Painting, Insulation
–Temporary construction facilities
–Engineering & Project Management
–Miscellaneous

HERVE
BARON
Cost estimate of Oil & gas facilities
© 2013 – Hervé Baron
• Analytical
– Establish the bill of quantities ( BOQ) in each trade: equipment,
civil, piping, structural steel etc.
– BOQ = Material Take-Off (what is measured from available
drawings at this stage) + allowances for design development +
allowances for what is not yet on drawings + contingencies
– Apply ratios to get supply + installation cost
– Installation cost = qty* manhours/ton ratio * labourcost
– Labourcost is all in, i.e., includes construction equipment (crane,
scaffolding)
– The ratio is based on standard manhours, i.e., home country,
– Localization factor (productivity) to be applied, i.e., actual
installation manhours= ratio * productivity
– Example: piping installation cost, ratio: 250 stdh / ton
• Western Europe, labourcost $100/hryields $20k/ton
• Middle East, labourcost $18/hr, productivity 2.5 y eilds$16k/ton

HERVE
BARON
Cost estimate of Oil & gas facilities
© 2013 – Hervé Baron
• Analytical
–Main equipment supply + install –Piping supply + install
–Electrical supply + install
–Instrumentation & Control system supply + install
–Civil Works
–Steel structures
–Painting, Insulation
–Temporary construction facilities
–Engineering & Project Management
–Miscellaneous

HERVE
BARON
Cost estimate of Oil & gas facilities
© 2013 – Hervé Baron
• Main equipment supply + install
• Supply

HERVE
BARON
Cost estimate of Oil & gas facilities
© 2013 – Hervé Baron
• Main equipment supply + install
• Supply: eqt list (dimensions) => weight

HERVE
BARON
Cost estimate of Oil & gas facilities
© 2013 – Hervé Baron
Process design
PFDs
H&M balance

HERVE
BARON
Cost estimate of Oil & gas facilities
© 2013 – Hervé Baron
• Main equipment supply + install
• Supply: eqt list (dimensions) => weight
• Rate?

HERVE
BARON
Cost estimate of Oil & gas facilities
© 2013 – Hervé Baron
• Main equipment supply + install
• Supply: eqtlist (dimensions) => weight
• Rate:
USD 4/kg for CS –depends on eqtsize: 4 (large) –10 (small)
USD12/kg for SS
USD 300-500 /m2 for Shell&Tube/ Air-coolers
USD 1000/kW for pumps

HERVE
BARON
Cost estimate of Oil & gas facilities
© 2013 – Hervé Baron
• Main equipment supply + install
• Supply: eqt list, dimensions/capacity/weight
• Installation

HERVE
BARON
Cost estimate of Oil & gas facilities
© 2013 – Hervé Baron
• Main equipment supply + install
• Supply: eqt list, dimensions/capacity/weight
• Installation ratios: % supply cost, typ. 8%

HERVE
BARON
Cost estimate of Oil & gas facilities
© 2013 – Hervé Baron
• Main equipment supply + install
• Supply: eqtlist, dimensions/capacity/weight
• Installation ratios: % supply cost, typ. 8%
30 stdmanhours/ton (includes labour
and equipment)

HERVE
BARON
Cost estimate of Oil & gas facilities
© 2013 – Hervé Baron
• Analytical
–Main equipment supply + install
–Piping supply + install –Electrical supply + install
–Instrumentation & Control system supply + install
–Civil Works
–Steel structures
–Painting, Insulation
–Temporary construction facilities
–Engineering & Project Management
–Miscellaneous

HERVE
BARON
Cost estimate of Oil & gas facilities
© 2013 – Hervé Baron
Piping supply + install
• Qty: ratio (eqt weight), typ. 40%

HERVE
BARON
Cost estimate of Oil & gas facilities
© 2013 – Hervé Baron
Piping supply + install
• Qty: ratiof (eqt number)

HERVE
BARON
Cost estimate of Oil & gas facilities
© 2013 – Hervé Baron
Piping supply + install
• Qty: ratiof (eqt number)

HERVE
BARON
Cost estimate of Oil & gas facilities
© 2013 – Hervé Baron
Piping supply + install
• Qty: ratiof (eqt number)
Remark: Unit vs Interconnection

HERVE
BARON
Cost estimate of Oil & gas facilities
© 2013 – Hervé Baron
Piping supply + install
• Qty: ratio (eqt number, eqt weight)
MTO

HERVE
BARON
Cost estimate of Oil & gas facilities
© 2013 – Hervé Baron
Process design
PFDs
H&M balance
P&IDs

HERVE
BARON
Cost estimate of Oil & gas facilities
© 2013 – Hervé Baron
PFDs
H&M balance
P&IDs
Process design
Plot Plan
Equipment list

HERVE
BARON
Cost estimate of Oil & gas facilities
© 2013 – Hervé Baron
P&IDs Plot Plan
Piping Layout

HERVE
BARON
Cost estimate of Oil & gas facilities
© 2013 – Hervé Baron
A unique synthesis for the busy Project professional 200 pages, 250 illustrations
For more information on Engineering, look up in:

HERVE
BARON
Cost estimate of Oil & gas facilities
© 2013 – Hervé Baron
Piping supply + install
• Qty:MTO

HERVE
BARON
Cost estimate of Oil & gas facilities
© 2013 – Hervé Baron
Piping supply + install
• Qty:MTO
»Item count: P&IDs
»Lengths: Piping Layout

HERVE
BARON
Cost estimate of Oil & gas facilities
© 2013 – Hervé Baron
Piping supply + install
• Qty:MTO
»Item count: P&IDs
»Lengths: Piping Layout
HBoth Process & Utility lines
HBoth Above Ground & Underground lines, Fire water

HERVE
BARON
Cost estimate of Oil & gas facilities
© 2013 – Hervé Baron
Piping supply + install
• Qty:MTO
»Item count: P&IDs
»Lengths: Piping Layout
HBoth Process & Utility lines
HBoth Above Ground & Underground lines, Fire water
Allowances added
for:

HERVE
BARON
Cost estimate of Oil & gas facilities
© 2013 – Hervé Baron
Piping supply + install
• Qty:MTO
»Item count: P&IDs
»Lengths: Piping Layout
HBoth Process & Utility lines
HBoth Above Ground & Underground lines
Allowances added for:
Ewhat is not taken-off, e.g., small diameter and design
development (P&ID completion) to obtain quantities
to erect

HERVE
BARON
Cost estimate of Oil & gas facilities
© 2013 – Hervé Baron
Piping supply + install
• Qty:MTO
»Item count: P&IDs
»Lengths: Piping Layout
HBoth Process & Utility lines
HBoth Above Ground & Underground lines
Allowances added for:
Ewhat is not taken-off, e.g., small diameter and design
development (P&ID completion) to obtain quantities
to erect

HERVE
BARON
Cost estimate of Oil & gas facilities
© 2013 – Hervé Baron
Piping supply + install
• Qty:MTO
»Item count: P&IDs
»Lengths: Piping Layout
HBoth Process & Utility lines
HBoth Above Ground & Underground lines
Allowances added for:
Ewhat is not taken-off, e.g., small diameter and design
development (P&ID completion) to obtain quantities
to erect
Ecut and losses to obtain quantities to be supplied

HERVE
BARON
Cost estimate of Oil & gas facilities
© 2013 – Hervé Baron
Piping supply + install
• Qty: ratio (eqtnumber, eqtweight)
MTO
• Rate
Supply

HERVE
BARON
Cost estimate of Oil & gas facilities
© 2013 – Hervé Baron
Piping supply + install
• Qty: ratio (eqtnumber, eqtweight)
MTO
• Rate Supply $ /kg, typ. USD 3 /kg for CS

HERVE
BARON
Cost estimate of Oil & gas facilities
© 2013 – Hervé Baron
Piping supply + install
• Qty: ratio (eqtnumber, eqtweight)
MTO
• Rate Supply $ /kg, typ. USD 3 /kg for CS
Install

HERVE
BARON
Cost estimate of Oil & gas facilities
© 2013 – Hervé Baron
Piping supply + install
• Qty: ratio (eqtnumber, eqtweight)
MTO
• Rate Supply $ /kg, typ. USD 3 /kg for CS
Install stdmhrs/ton, typ. 200-250 in unit,
100 on interconnecting pipe-racks,
applied to the total piping weight,
including fittings & valves.

HERVE
BARON
Cost estimate of Oil & gas facilities
© 2013 – Hervé Baron
Electrical supply + install
• Price ratio % Main equipment, typ. 15-20%

HERVE
BARON
Cost estimate of Oil & gas facilities
© 2013 – Hervé Baron
Electrical supply + install
• Price ratio % Main equipment, typ. 15-20%
• Quantities: Consumers list
• Rate (supply+install): USD 50k / consumer (w/o
generation) USD 520 / installed kW

HERVE
BARON
Cost estimate of Oil & gas facilities
© 2013 – Hervé Baron
Plot Plan
Single Line Diagram
Consumers list

HERVE
BARON
Cost estimate of Oil & gas facilities
© 2013 – Hervé Baron
Plot Plan
Single Line Diagram
Consumers list

HERVE
BARON
Cost estimate of Oil & gas facilities
© 2013 – Hervé Baron
Instrumentation & Control system supply + install
• Price ratio % Main equipment, range: 40-120%

HERVE
BARON
Cost estimate of Oil & gas facilities
© 2013 – Hervé Baron
Instrumentation & Control system supply + install
• Price ratio % Main equipment, range: 40-120%
• Qties

HERVE
BARON
Cost estimate of Oil & gas facilities
© 2013 – Hervé Baron
Instrumentation & Control system supply + install
• Price ratio % Main equipment, range: 40-120%
• Qties nbequiv. loops (CV, 0.5 ON/OFF, Analyser)

HERVE
BARON
Cost estimate of Oil & gas facilities
© 2013 – Hervé Baron
Instrumentation & Control system supply + install
• Price ratio % Main equipment, range: 40-120%
• Qties nbequiv. loops (CV, 0.5 ON/OFF, Analyser)
• Rate

HERVE
BARON
Cost estimate of Oil & gas facilities
© 2013 – Hervé Baron
Instrumentation & Control system supply + install
• Price ratio % Main equipment, range: 40-120%
• Qties nbequiv. loops (CV, 0.5 ON/OFF, Analyser)
• Rate supply: $ /equivalent control loops, typ. 90k
install: hrs/ equivalent control loops, typ. 750

HERVE
BARON
Cost estimate of Oil & gas facilities
© 2013 – Hervé Baron
Instrumentation & Control system supply + install
• Price ratio % Main equipment, range: 40-120%
• Qties Instrument list

HERVE
BARON
Cost estimate of Oil & gas facilities
© 2013 – Hervé Baron
Instrumentation & Control system supply + install
• Price ratio % Main equipment, range: 40-120%
• Qties Instrument list
• Rate Supply+install: $ / I/O, typ. 1000

HERVE
BARON
Cost estimate of Oil & gas facilities
© 2013 – Hervé Baron
Civil Works
• Price Ratio % Main equipment cost, typ. 15-20%

HERVE
BARON
Cost estimate of Oil & gas facilities
© 2013 – Hervé Baron
Civil Works
• Price Ratio % Main equipment cost, typ. 15-20%
• Qty

HERVE
BARON
Cost estimate of Oil & gas facilities
© 2013 – Hervé Baron
Civil Works
• Price Ratio % Main equipment cost, typ. 15-20%
• Qty Dimensions/Weight of equipment &
structure => size of foundations (m3)

HERVE
BARON
Cost estimate of Oil & gas facilities
© 2013 – Hervé Baron
Civil Works
• Price Ratio % Main equipment cost, typ. 15-20%
• Qty Dimensions/Weight of equipment &
structure => size of foundations (m3)
• Rate

HERVE
BARON
Cost estimate of Oil & gas facilities
© 2013 – Hervé Baron
Civil Works
• Price Ratio % Main equipment cost, typ. 15-20%
• Qty Dimensions/Weight of equipment &
structure => size of foundations (m3)
• Rate all-in (materials & labour) rate $/m3, typ. 1000

HERVE
BARON
Cost estimate of Oil & gas facilities
© 2013 – Hervé Baron
Civil Works
• Price Ratio % Main equipment cost, typ. 15-20%
• Qty MTO: excavation, formwork, rebar, etc.

HERVE
BARON
Cost estimate of Oil & gas facilities
© 2013 – Hervé Baron
Civil Works
• Price Ratio % Main equipment cost, typ. 15-20%
• Qty MTO: excavation, formwork, rebar, etc.
• Rate Mhrs/operation + labour cost

HERVE
BARON
Cost estimate of Oil & gas facilities
© 2013 – Hervé Baron
Steel structures
• Price Ratio % Main equipment cost, typ. 10-30%

HERVE
BARON
Cost estimate of Oil & gas facilities
© 2013 – Hervé Baron
Steel structures
• Price Ratio % Main equipment cost, typ. 10-30%
• Qty Ratio

HERVE
BARON
Cost estimate of Oil & gas facilities
© 2013 – Hervé Baron
Steel structures
• Price Ratio % Main equipment cost, typ. 10-30%
• QtyRatio
pipe-racks: 90% of piping weight
platforms: 10% of equipment weight

HERVE
BARON
Cost estimate of Oil & gas facilities
© 2013 – Hervé Baron
Steel structures
• Price Ratio % Main equipment cost, typ. 10-30%
• QtyRatio pipe-racks: 90% of piping weight
platforms: 10% of equipment weight
• Rate

HERVE
BARON
Cost estimate of Oil & gas facilities
© 2013 – Hervé Baron
Cost estimate
Steel structures
• Price Ratio % Main equipment cost, typ. 10-30%
• QtyRatio pipe-racks: 90% of piping weight
platforms: 10% of equipment weight
• Rate Supply USD 2/kg
Erection 20 stdmanhours/t

HERVE
BARON
Cost estimate of Oil & gas facilities
© 2013 – Hervé Baron
• Analytical
–Main equipment supply + install
–Piping supply + install
–Electrical supply + install
–Instrumentation & Control system supply + install
–Civil Works
–Steel structures
–Painting, Insulation

HERVE
BARON
Cost estimate of Oil & gas facilities
© 2013 – Hervé Baron
• Painting, Insulation
• Price ratio % eqt, piping, str cost, typ. 5% each

HERVE
BARON
Cost estimate of Oil & gas facilities
© 2013 – Hervé Baron
• Painting, Insulation
• Price ratio % eqt, piping, strcost, typ. 5% each
• Qty MTO

HERVE
BARON
Cost estimate of Oil & gas facilities
© 2013 – Hervé Baron
• Painting, Insulation
• Price ratio % eqt, piping, strcost, typ. 5% each
• Qty MTO
• Rate supply + install h / m2
typ. 0,5 for painting 1,5 for (hot) insul.

HERVE
BARON
Cost estimate of Oil & gas facilities
© 2013 – Hervé Baron
• Analytical
–Main equipment supply + install
–Piping supply + install
–Electrical supply + install
–Instrumentation & Control system supply + install
–Civil Works
–Steel structures
–Painting, Insulation
–Temporary construction facilities –Engineering & Project Management
–Miscellaneous

HERVE
BARON
Cost estimate of Oil & gas facilities
© 2013 – Hervé Baron
• Temporary Construction facilities
• Ratio % total cost, typ. 5% for new site
• Detailed

HERVE
BARON
Cost estimate of Oil & gas facilities
© 2013 – Hervé Baron
• Analytical
–Main equipment supply + install
–Piping supply + install
–Electrical supply + install
–Instrumentation & Control system supply + install
–Civil Works
–Steel structures
–Painting, Insulation
–Temporary construction facilities
–Engineering & Project Management –Miscellaneous

HERVE
BARON
Cost estimate of Oil & gas facilities
© 2013 – Hervé Baron
• Engineering & Project Management = all Project ser vices
• Price ratio % total cost, typ. 15%

HERVE
BARON
Cost estimate of Oil & gas facilities
© 2013 – Hervé Baron
• Engineering & Project Management = all Project
services
• Price ratio % total cost, typ. 15%
• Qty ratio

HERVE
BARON
Cost estimate of Oil & gas facilities
© 2013 – Hervé Baron
• Engineering & Project Management = all Project
services
• Price ratio % total cost, typ. 15%
• Qty ratio hrs / eqt item, typ. 1800 for Refining,
2500 for gas, 4000 for LNG

HERVE
BARON
Cost estimate of Oil & gas facilities
© 2013 – Hervé Baron
• Engineering & Project Management = all Project
services
• Price ratio % total cost, typ. 15%
• Qty

HERVE
BARON
Cost estimate of Oil & gas facilities
© 2013 – Hervé Baron
• Engineering & Project Management = all Project
services
• Price ratio % total cost, typ. 15%
• Qty home office: tasks list + std manhours
field supervision: ratio to labour, typ. 1/7

HERVE
BARON
Cost estimate of Oil & gas facilities
© 2013 – Hervé Baron
• Analytical
– Main equipment supply + install
– Piping supply + install
– Electrical supply + install
– Instrumentation & Control system supply + install
– Civil Works
– Steel structures
– Painting, Insulation
– Temporary construction facilities
– Engineering & Project Management
– Miscellaneous – Contractor’s cost

HERVE
BARON
Cost estimate of Oil & gas facilities
© 2013 – Hervé Baron
• Miscellaneous
• Earthworks: always specific
• Special foundations
• Infrastructures: roads, buildings
• Spare parts, typ. 5% main equipment cost
• First fill (catalyst, lubes, chemicals)

HERVE
BARON
Cost estimate of Oil & gas facilities
© 2013 – Hervé Baron
• Analytical
– Main equipment supply + install
– Piping supply + install
– Electrical supply + install
– Instrumentation & Control system supply + install
– Civil Works
– Steel structures
– Painting, Insulation
– Temporary construction facilities
– Engineering & Project Management
– Miscellaneous
– Contractor’s cost

HERVE
BARON
Cost estimate of Oil & gas facilities
© 2013 – Hervé Baron
• Contractor’s cost
–profit,
–risks,
–sales cost,

HERVE
BARON
Cost estimate of Oil & gas facilities
© 2013 – Hervé Baron
• Contractor’s cost
–profit, typ. 7%
–risks,
–sales cost,
typ. 10-15%

HERVE
BARON
Cost estimate of Oil & gas facilities
© 2013 – Hervé Baron
– Main equipment supply + install
– Piping supply + install
– Electrical supply + install
– Instrumentation & Control system
supply + install
– Civil Works
– Steel structures
– Painting, Insulation
– Temporary construction facilities
– Engineering & Project Management
– Miscellaneous: catalysts etc.
– Contractor’s cost

HERVE
BARON
Cost estimate of Oil & gas facilities
© 2013 – Hervé Baron
Main features:
• Different level of Cost estimate accuracy
–Feasibility study +/-30% accuracy
–Final Investment Decision (FID) +/-10%
Which of the methods we have seen would you use for
each case?

HERVE
BARON
Cost estimate of Oil & gas facilities
© 2013 – Hervé Baron
Main concepts:
• Different level of Cost estimate accuracy
• Factored / Detailed
• Qty estimate: allowances for design development
• Rates:
–In-house historical data –similar Plant
–Cost estimate: Contingencies for cost escalation
–Inquiries + provisions for cost adders (supplies),
additional works/re-works (construction)
• Direct costs / Indirect costs

HERVE
BARON
Cost estimate of Oil & gas facilities
© 2013 – Hervé Baron
Historical evolution:
+ Increased instrumentation & control costs
-Engineering low cost centers
-Low cost sourcing –20% cheaper
-Increase in productivity (3D model)
+ Additional requirements: safety, environment

HERVE
BARON
Cost estimate of Oil & gas facilities
© 2013 – Hervé Baron
http://www.toblog.fr/en/baron.html
You enjoyed this presentation?
Share my experience on other topics:
HEngineering
HContract Management
HProject Control
Attend my
classroom training
List and schedule of coming sessions at: