About This Presentation

Experienced Civil Engineer and Water Supply Expert with over 25 years of experience in project management, construction supervision, and quality control for multidisciplinary EPC projects in India and the Middle East. Proven leadership in managing water supply, sewerage, and infrastructure developme...


Slide Content

DETAILED CURRICULUM VITAE
1.NAME OF EXPERT :
2.SPECIALISATION/Applied For :
3.CATEGORY (GEN/OBC/SC/ST) :
4.FULL ADDRESS :
(including Phone, E-Mail, etc.)
5.DATE OF BIRTH :
6.NATIONALITY :
7.EDUCATION :
(Indicate college/university and other
specialized education of Expert, giving
names of institutions, degrees obtained and
dates of obtainment)
MEMBERSHIP OF PROFESSIONAL
ASSOCIATIONS
OTHER TRAINING
9.(Indicate significant training since degrees,:
under 7.- Education, were obtained)
8. :
Annexure-II
A L V I M U B A S H I R
J A M E E L
WATER SUPPLY EXPERT
G E N
F L A T N O 1 G U L B L D
T A J R E S I D E N C Y
J A L A N N A G A R
A U R A N G A B A D
M A H A R A S H T R A 4 3 1 0 0 5
2 8 0 6 1 9 7 6
I N D I A N
DIPLOMA IN CIVIL ENGINEERING FROM
GOVT POLYTECHNIC NANDED IN 1994
B E CIVIL FROM DR BAMU , AURANGANBAD MGMS COLLEGE NANDED IN 1998
SAUDI ENGINEERS COUNCEL KSA

10.COUNTRIES OF WORK EXPERIENCE :
11.LANGUAGES : Language Speak Read Write
(For each Language indicate proficiency:
Good,Fair, or Poor in Speaking, Reading And
Writing)
1.
2.
3.
From To Employer Position Held
12.EMPLOYMENT RECORD
(Starting with present position, list in reverse
order every employment held by Expert since
graduation, giving for each employment
(see format here below): dates of
employment, name of employing
organization, positions held.)
INDIA
KINDOM OF SAUDI AREBIA
HINDI
ENGLISH
MARATHI
YES
YES
YES
YES
YES
YES
YES
YES
YES
ARIL 2023
JUNE 2021
CONTNUE

MARCH 2023
OCT 2019 MAY 20121
APR 2015 SEP 2019
DES 2013 MAR 2015
APR 2011 NOW 2013
DES 2009 JULY 2011
NOV 2007 OCT 2009
FEB 2006 OCT 2007
NOV 2003 JAN 2006
JUNE 2001 OCT 2003
APR 1999 MAY 2001
SGS INDIA
THROUGH WORK FOCE LTD
TEAM LEADER
DB ENGINEERING INC LTD CHIEF UTILITY ENGINEER
HOUSE OF CONSULTING ENGINEERS
MANAGER CIVIL WATER DEPT
LOIUS BERGER WSP Utility Engineer - WATER / SEWAGE
NJS CONSULTING CONSULTANTS S
ENIOR CONSULTANT
DHV INDIA PVT LTD SENIOR CONSULTANT CIVIL
ALMARAI COMPANY
PROJECT ENGINEER
ROHM AND HASS INDIA PVT LTD SENIOR QC ENGINEER
P
HILLIPS CARBON BLACK LTD M ANAGER CONSTRUCTION
TRACTEBEL ENGINEERS AND CONSTRUCTORS ASSISTANT MANAGE
R CONST
AKER KVANER POWER GAS PRINCIPAL ENGINEERS
BOMABY DYING MFG CHEMTECX CONSTRUCTION ENGINEER

13.WORK UNDERTAKEN THAT BEST ILLUSTRATES CAPABILITY TO HANDLE THE POSITION
ASSIGNED
i) Name of Assignment or Project :
Year :
Location :
Client :
Main project
features :
Positions
held :
Activities performed :
Detailed Tasks Assigned
•Coordinate with the design team for timely deliverables,
overall project administration and contract management.
•Plan for the site, activity scheduling
•Designs for all elements (including working drawings)
•Estimates in consultation with the conservation
specialists and the archaeologist.
•Associated bidding documents, assist PIU/ PMU in
bidding procedures including invitation of bids, bid
evaluation, and awards of contract for all the project
components
•Assist PIU/PMU with overall management of works and in
the resolution of contractual issues and preparation of as-
built drawings for all components
•Head the multi-disciplinary team at site to coordinate civil
and MEP works design issues.
•Establish QA/QC Plans including development of
inspection and testing plan.
•Supervise the preparation of the client’s monthly const
progress report and the client contract status report
•Monitoring the daily progress of projects.
•Providing detailed updates to the project director and
other stake holders, under NDB assisted Program.
•Review and approvals of the submitted designs,
drawings, estimates, QAP and material approvals.
•Organizing reports, invoices, contracts and other financial
files for easy access.
•Payment’s preparation, analyze, submit and follow up.
•Reviewing and updating existing contracts.
•Review of EOT Proposals and variation Statements.
•Liaison with client and contractor regarding the contract
management and implementation of site works.
•Prepare documents for project review meetings with
contractor and employer.
TEAM LEADER
Client Name:Jal Shakti Vibhag, Govt. of Himachal PradeshMain Project Feature:Project Management and Construction Management of Activities under NDB Funded Water Supply Projects under (HPRWSP) and GoI funded JJM spread over 8 Districts in Himachal Pradesh in total 18 Contract Packages
A P R I L 2 0 2 3
M A N D I H I M A C H A L P R A D E S H
J A L S H A K T I V I B H A G

ii) Name of Assignment or Project:
Year :
Location :
Client :
Main project features :
Positions held :
Activities performed :
Sahnewal–Pilkhani Section Of EDFC Corridor P– 301
DB engineering
Position : Chief of Utility -Civil
DEDICATED FREIGHT CORRIDOR CORPORATION OF INDIA LIMITED ( DFCCIL)
Ambala Haryana INDIA
J U N E 2 0 2 1 - M A R C H 2 0 2 3
The construction of the Civil, Structure and Track. The work
includes construction and removal of any Temporary Works
and diversions of utility services both of IR and other
impacted authorities .
works Package Chainage Route Length from to 301
Km-187.500 Km - 360.200 181.900 (SL) Parallel Length
(SL) - 162.270 Km Detour Length (SL) — 12.790 Km ,
Details of Structures involved in contract
Activities Being Performed:
Prepared and executed civil and structural Project
Implementation, its scope including user requirement
collection, estimate demand for infrastructure
Ensured proper plans are prepared for all building
structures submitted by Contractor related to the
project.
Reviewing all statutory clearances obtained by the
Contractor for utilities and buildings Managing and
supervising the shifting / realignment of civil and
electrical utilities as per Charted Un-Charted Utilities.
Implemented methodology for construction being
used by contractors is in accordance with approved
systems and procedures
Ensured implementation of Project Management
Plan by day-to-day monitoring of quality and
progress of construction work
Implemented contract specification making sure
contractor to follow rules and regulations DFFCIL
Ensured that the work is executed by D&B
contractor in accordance with 'Good for Construction
drawing.
Reviewed vendor drawings for adequate civil Project
input
Supported technical procurement, actively involved
in the preparation of technical specification and BOQ
Interacted with construction and site personnel (e.g.,
construction manager, plant-manager, maintenance
engineers) to prepare construction strategy and
ensure that the project is constructed according to
plans

iii) Name of Assignment or Project:
Year :
Location :
Client :
Main project features :
Positions held :
Activities performed :
Project : Client : : Jeddah KSAProject:
[Oct 2019 to May 2021]
Construction of Four-Season Hotel Jeddah
MIDAD Real Estate.
Employer : Hamdan ConsultantsPosition
Water supply for Construction of Four Season Hotel
Jeddah for ( MIDAD )
Water supply project for a Construction of Multi storied structure by performing following responsibility
of Engineers representative such as Assisting and
monitoring the performance of the construction team of
Engineers, inspectors, surveyors, and materials teams
by Leading the construction supervision of a water
supply and sanitary works for a multi story building
Fulfilling project requirements by implementing proper
QA QC procedure for various forms of RCC in situ and
precast , Post Tensioned Activities Being Performed:
Approved and Deployed engineering documents like
Shop drawings construction specifications, plans, and
schedules.
Provided engineering information by answering
questions and requests by coordination with consultants
DSA and WME Advised management on needed
actions on critical issue of projects like de-watering
well closing and various Varian Orders Contributed to
team effort by accomplishing related results as needed.
Ensuring projects run smoothly and structures are
completed within budget and on time. Problem solving
on spot.
Manager-Civil

iv) Name of Assignment or Project:
Year :
Location :
Client :
Main project features :
Positions held :
Activities performed :
Activities Being Performed: Water supply scheme for
Industrial area of Jazan Phase 2
Laying of DI pipeline from Tap off from 10km point
from Main Distributory near Jazan Dam going to city
Construction of RCC chambers for the pipeline with
specification from Saudi Construction Code as per
design
Conducting all inspection during construction of
pipeline , excavation ,pipe joints , laying, backfilling ,
hydro-test, line markers , It aslo includes Construction
of Roads , involving all activities , sub-grade
preparation , WMM layers , BBM and Wearing
Caot`sConstruction of RCC manholes , their
finishing ,Connection with catch pits Road markings
Signage boards installations Construction of water
supply works to industrial city internal network from
GLS tank and supply of main line from dam distributary
to GLS tank
Identified Specific quality issues and proposed
appropriate solution to Contractors and got the issue
resolved. Coordinated with all concerned parties on all
construction (and design) issues through weekly
meetings and monitor Contractor’s performance.
Assess progress on site and report to be submitted to the
client. Coordinate (as necessary) all utility matters
between contractors and Client. Submittal review and
approval of shop drawings, material submittal.
[May 2017 to Sep 2019]
Construction of Water supply and sanitary works for Jizan Industrial City Phase II
Jizan Industrial City Phase II SAUDI AREBIA
Saudi Industrial Property Authority (MODON)Employer : Louis Berger
Construction of Jizan Industrial City Phase II for Saudi Industrial Property Authority (MODON) Supervision and coordination of the construction of various networks; Storm, Sewerage and Potable water network with Road works and Ponds
Utility Engineer - WATER / SEWAGE

v) Name of Assignment or Project :
Year :
Location :
Client :
Main project features :
Positions held :
Activities performed :
The project is
by Construction of Sewage
Pumping Station at Chuakaghat 140MLD,
Phulwariya7.6MLD, Saraiya3.7MLD
Construction ofSewerage Treatm
ent Plant 140
M
LDwas prepared based on UASB Technology
Monitored construction activities and analyz
ed
processes to ensure all work adhered to
established quality requirem
ents.
Managed quality assurance s
tandards and
ensured their c
ontinuous application across all
processes, recom
mending corrective actions
where necessary.
Ensured the availability of updated inspection,
c
ontrol, and test reports to facilitate approvals for
m
echanically completed plant systems.
Verified tes
ts, controls, and inspections
performed by contractors to maintain compliance
with project quality standards
.
Developed method statements for activities,
including risk
assessments, job safety
environmental analyses, and inspection test plans
with checklists based on project specifications.
Coordinated with the consultant's representatives
and site in-charge to conduct inspections and
address quality-related issues
effectively.
Consist of 5 packages involv
es construction
interceptor sewer , Rising mains, Pumping
s
tations and STP.
J
ICA (Japan International Cooperation Agency)-
Assisted Ganga Action Plan Project(Varanas
i) under
National Ganga River Basin A
uthority (NGRBA)
Sewerage Component i.e. construc
tion and
r
ehabilitation of sewerage facilities
Senior Consultant–QAQC Civil
(Dec 2013 – Mar
ch 2015)
Construction of Sewage Pumping Station at Chuakaghat140MLD,Phulwariya7.6MLD,Saraiya3.7
M
LD Construction ofSewerage Treatment Plant 140
MLDwas prepared based on UASB Technology

v) Name of Assignment or Project :
Year :
Location :
Client :
Main project features :
Positions held :
Activities performed :
Independently checked and verified contractor
designs against contractual agreements and client
specifications.
Coordination and Reporting:Prepared and
reviewed material take-off (MTO) reports.
10 MLD Sewage Treatment Plant,
Bodhgaya:Performed design calculations for
critical components such as sludge sump, pump
house, centrifuge house, secondary clarifier, and
the administration building.
DPR for Sewerage Treatment Plants in 59 Towns
of Patna District:Verified RCC designs of STPs for
the specified capacities, ensuring all components
adhered to geotechnical investigation reports.
Extracted and reviewed drawings, prepared
detailed structural steel and RCC designs, sectional
plans, and ensured the quality of ACAD designers'
outputs.
Maintained regular communication with assigned
project clients, ensuring alignment with project
objectives and addressing client requirements
effectively.
Patna DPR Review Cell for BUIDCO
DHV India Private Limited
Senior Consultant- Civil
(Aug2011–Nov 2013)
(Bihar Urban Development Corporation)
PATNA BIHAR

v
i)
Name of Assignment or Project :
Year :
Location :
Client :
Main project features :
Positions held :
Activities performed :
Inspected and certified all necessary site inspections
during various stages of construction activities as per
the approved Inspection and Test Plan (ITP).
Coordinated daily RFI (Request for Inspection)
schedule planning, completed site inspections,
addressed non-conformities, and raised NCRs (Non-
Conformance Reports) as required.
Monitored daily field construction operations to
ensure compliance with approved project design
drawings and quality plans.
Ensured adherence to quality assurance standards,
monitored their continuous application, and
recommended corrective actions to improve
processes.
Developed method statements for activities,
including risk assessments, job safety environmental
analyses, Inspection Test Plans, and checklists based
on project specifications.
Identified areas needing improvement, initiated
preventive actions, and provided early feedback to
the site team, addressing QA/QC issues, potential
delays, or interface challenges.
Potable Water Supply Scheme and ETP/STP Project
Alkharj KSA
Almarai Company
Project Engineer
(Dec 2009 –July 2011)

v
ii)
Name of Assignment or Project :
Year :
Location :
Client :
Main project features :
Positions held :
Activities performed :
Followed Project Quality Plan and Integrated
Management System (IMS) procedures to ensure
quality standards compliance.
Conducted joint inspections with the consultant at
the project site as per the Inspection and Test Plan
(ITP).
Performed incoming material inspections at the site
to verify conformance to project requirements.
Issued Site Observation Reports to document
findings and discrepancies.
Maintained records of concrete deliveries and
ensured that Inspection Requests (IR) were recorded
on a daily basis.
Witnessed Cube Tests and other third-party tests to
validate material quality and structural integrity.
Ensured adherence to the testing frequency outlined
in the approved ITP and project specifications.
Engaged in technical discussions with QA/QC
Engineers and Project Engineers to resolve any site-
related issues.
Vietnam Emulsion Project, Vietnam * Taloja
Emulsion Plant Extension Project *Mumbai Chennai
Emulsion Plant Extension Project, Chennai, India*
Technical Center, Mumbai
NOV 2007 OCT 2009
MUMBAI
ROHM AND HASS
SENIOR QA QC ENGINEER

v
iii)
Name of Assignment or Project :
Year :
Location :
Client :
Main project features :
Positions held :
Activities performed :
Managed the planning and execution of construction
for several super-specialty components of the
Carbon Black Plant.
Collaborated with architects for design finalization.
Conducted transparent tendering processes to
finalize contractors.
Prepared and finalized legal documentation for
contracts.
Supervised project implementation to ensure
completion within the agreed cost and timelines.
Carbon Black Plant and Power Plant Construction (Crown Project)
PhillipsCarbonBlackLimited,
( Feb 2006 – Oct 2007)
Mundra, Gujarat
ManagerConstruction

ix) Name of Assignment or Project :
Year :
Location :
Client :
Main project features :
Positions held :
Activities performed :
Executed work from the consultant's side, involving
the construction of Sectionalizing Valve Stations,
Dispatch and Receiving Stations.
Managed foundations for launcher, metering skids,
and other static equipment.
Supervised construction of RCC/Structural
components including columns, beams, slabs, and
pipe racks.
Oversaw the installation of cable trenches and
platforms for equipment.
Inspected and verified adherence to quality-related
procedures, ensuring activities complied with
approved method statements and Inspection Test
Plans (ITP).
Coordinated with the consultant’s representative
and site in charge to resolve quality issues and
managed the closure of Non-Compliance Reports
(NCR).
Reported to the QA/QC Manager and monitored all
activities related to the Quality Management System
(QMS).
Managed all QA/QC documentation, including
certificates, calibration records, test results,
inspection requests, non-compliance reports, site
instructions, and permanent material delivery
records.
Responsible for the timely closure of Non-
Conformance Reports (NCR) and Site Instructions.
Pipeline BJPL Project for GSPL and Pipeline
DUPL Project for GAIL
DUPL Project for GAIL
Tractebel Engineers And Constructors,Gujarat

( Nov 2003 – Jan 2006)
Asst Manager Construction

x
)
Name of Assignment or Project :
Year :
Location :
Client :
Main project features :
Positions held :
Activities performed :
Activities Being Performed:
Handled execution work from the consultant’s side
(AKPG), ensuring planning and coordination for
RCC and structural works.
Oversaw construction of trusses for Cell House,
external pipe racks, and various platform levels.
Checked the Bar Bending Schedules (BBS) and
reviewed RA bills as per approved drawings and
revisions.
Maintained quality control by adhering to the
approved QA plan, ensuring proper testing and pour
card documentation.
Managed the project to meet time-bound
completion by regularly updating progress reports.
Focused on meticulous planning and scheduling,
with expertise in Work & Cost Breakdown Structure
(WBS & CBS) analysis for multidisciplinary EPC
projects.
Diligent in breaking down tasks, analyzing
dependencies, and determining relationships to
create realistic schedules and identify the critical
path.
Conduct regular weekly analyses, proactively
forecasting critical tasks, and identifying potential
risks to mitigate them.
Construction of Gujarat Fluoro Chemicals Ltd at
Dahej, Gujarat
Dahej, Gujarat

Principal Engineer
( June 2001 – Oct 2003)
Gujarat Fluoro Chemicals Ltd
Aker kvaerner Power Gas

xi) Name of Assignment or Project :
Year :
Location :
Client :
Main project features :
Positions held :
Activities performed :
Activities Being Performed:
Preparation and Issuance of Reports: Responsible
for preparing and issuing daily, weekly, and
monthly reports detailing all inspection activities at
the site, ensuring clear communication of progress
and issues.
Control of Documents: Established and maintained
overall control of documents related to the Quality
Management System (QMS), ensuring compliance
with project standards and proper document
management.
Inspection of Site Activities: Conducted
inspections of all site activities to ensure adherence
to approved drawings, procedures, and
specifications, ensuring that construction and
installations meet required quality standards.
Development and Management of QMS:
Developed, implemented, and managed the Quality
Management System (QMS), including the Project
Quality Plan (PQP), Quality System Procedures
(QSP), Inspection and Test Plans (ITP), and
conducting regular quality audits to ensure
consistency and compliance.
Construction of PSF Project for Bombay Dyeing & Mfg. Co. Ltd.

Bombay Dyeing & Mfg. Co. Ltd.
Construction Engineer
( Apr 1999 – May 2001)
Responsible for overseeing the execution of work
from the consultant's side (Chemtex Global
Engineers Pvt. Ltd.).
Patalganga dist Raigad

xii) Name of Assignment or Project :
Year :
Location :
Client :
Main project features :
Positions held :
Activities performed :
Activities Being Performed:
Ensured the quality and workmanship of activities,
with expertise in civil, architectural, and structural
disciplines, working across multidisciplinary project
operations.
Developed method statements, including risk
assessments, Job Safety Environmental Analysis
(JSEA), and Inspection Test Plans (ITP) and
checklists, based on project specifications.
Conducted internal audits on-site as scheduled in the
Project Quality Plan (PQP).
Preparation and Issuance of Reports: Responsible for
preparing and issuing daily, weekly reports detailing
all inspection activities at the site, ensuring clear
communication of progress and issues.
Inspection of Site Activities: Conducted inspections
of all site activities to ensure adherence to approved
drawings, procedures, and specifications, ensuring
that construction and installations meet required
quality standards
Taken
a proactive approach to maintain realistic
project schedules by troubleshooting and revising
schedules when needed.
Construction of WTP60 MLD.
( Apr 1995 – March1999)
Environmental Department of Maharashtra Govt
Gondwana Engineers Nagpur
Junior Engineer
The project includes 60 MLD water treatment including Component i.e. aeration fountain, flash
mixture, clariflocculator,
Filtration galleries, and clear water sump. Consist
back flow wash out system .Project by environmental
department of state of Maharashtra.

14.Certification:
I, the undersigned, certify that to the best of
my knowledge and belief, this CV correctly
describes myself, my qualifications, and my
experience. I understand that any willful
:
misstatement described herein may lead to my
disqualification or dismissal, if engaged.
I, agree to work for WAPCOS and give my
consent for inclusion of my CV in various bids
under
submission.
:
(Signature of Candidate)
Date/Month/Year
Full name of Candidate
:
Note : Any other details/information, Experts may like to give, separate sheets may be used in case the space
provided is in sufficient.
/ /
Tags