For Rebar Testing Procedure


Slide Content

DEMONSTRATION
UNIVERSAL TESTING
MACHINE
MATEST COMPANY
MODEL : H001P103

POSITION :
UTTARA
CONSTRUCTION
YARD

CALIBRATION
CERTIFICATE
BY BUET

TURN ON POWER 5 SWITCH

TURN ON POWER 5 SWITCH

REMOTE CONTROL
MACHINE
(UP-DOWN)

REMOTE CONTROL (CLAMP)
OPEN –CLOSE
CONTROL
CLAMP

-INPUT REBAR AT UPPER CLAMP AND
CLOSE CLAMP.
-MOVING MACHINE FOR INPUT REBAR AT
LOWER CLAMP AND CLOSE CLAMP.

CLOSE CLAMP, MESUREMENT
INITIAL LENGTH AND
MARKING AT REBAR

TURN OFF CLAMP CONTROL AND
HYDRAULIC PUMP

CLICK FOR OPEN PROGRAM
PROGRAM : UTM I

(a)WINDOW PROGRAM
(b)GO TO FILE AND CLICK OPEN
(a) (b)

(a)SELECT TENSILE TEST
(b)INPUT SPECIMENS OF REBAR
(a) (b)

(a)CLICK START FOR RUN
MACHINE
(b)PROCESS IN TENSILE TESTING
(a) (b)

SAMPLE IS FAILURE
FAILURE

REMOVE REBAR FROM
UPPER-LOWER CLAMP

MESUREMENT FINAL LENGTH AND
INPUT INITIAL-FINAL LENGTH IN
PROGRAM

CLICK CHECK MARK AND SELECT
PRINT FOR SAVE PRINTOUT

FINDING
FOLDER
FOR SAVE
PRINTOUT

PRINTOUT:
REBAR
RESULT
Tags