RAMANUJAN IT CITY
• TRIL Infopark is a SPV created to execute the Ramanujan IT SEZ project
• This SPV is a joint venture between TRIL , Indian Hotels Company Limited (IHCL) and
Tamil Nadu Industrial Development Corporation.
• Ramanujan IT City is a humble tribute to the
legendary mathematician Srinivasa Ramanujan
who hailed from Tamil Nadu, South India.
Strategic location
Chronology of events
•Environmental clearance obtained –08/04/2009
•Application for proposed Amendment –27/11/2013
•Letter from SEIAA seeking clarifications
*
–04/08/2014
•Clarifications provided by TRIL
**
–22/08/2014
•Green tribunal order obtained –13/01/2015
•Presentation to SEIAA -13/05/2016
Initial Submission –2008
EC Clearance Obtained
Processing zone
(Phase – I)
Non –Processing
Zone (Phase – II)
IT Park
ResidentialRetail Hotel
Zone Description Built up area
Phase
– 1
Processing Zone – IIn sq.ft
IT PARK(
Basement 1 + Basement 2 + Stilt
) + 13 Floors 44,14,820
Phase
– 2
Non Processing Zone
Hotel Basement 1 + Basement 2 + Basement 3 + Ground + 13 Floors
14,75,936 Residential Ground + 13 Floors
Retail Basement 1 + Ground + 3 Floors
Total
58,90,756
Initial vsAs-Built
(10.22 Hectares)
PhaseZone
As per initial EIA approval As Built
Description
Area
Approved
(in sq.ft)
Description
Area
As-Built (in
sq.ft)
1
Processing Zone – I
IT Park –
(Comprising of
Blocks A, B, C,
D & U)
(
Basement 1 + Basement 2
+ Stilt
)
+ 13 Floors
44,14,820
(Basement 1 + Basement 2 +
Basement 3 + Ground + Stilt
)
+ 13 Floors
50,28,644
2
Non Processing Zone
Hotel
Basement 1 + Basement 2
+ Basement 3 + Ground +
13 Floors
14,75,936
Not Constructed0
Residential
Ground + 13 FloorsNot Constructed0
Retail
Basement 1 + Ground + 3
Floors
Not Constructed0
Total 58,90,75650,28,644
Proposed Development -
Seeking Amendment
Tidel Park
Metro
Station
Processing zone
(Phase – I)
Processing zone
(Phase – II)
Non –Processing
Zone
(Phase-II)
IT Park
IT Park
Utility
Block
Block D
(Littlewood
Tower)
Block A
(Neville
Tower)
Block B
(Carr Tower)
Block C
(Hardy Tower)
Block E
(Infinty
Tower)
Block F
(Cambridge
Tower)
Ser. Apt &
Convention
Center
ZoneDescription Built up Area
Phase
–I
Processing Zone - I
IT Park comprising of Blocks A, B, C, D & U
(Basement 1 + Basement 2 + Basement 3 +
Ground + Stilt)
+ 13 Floors
4,67,172
Phase
–II
Processing Zone – II
IT Park comprising of Blocks E & F
(Basement 1 + Basement 2 + Basement 3 +
Ground + Stilt)
+ 13 Floors
1,74,348
Non Processing Zone
Service Apartment & Convention Centre 4 Basements + Ground + 12 Floors 24,240
Total 6,65,760
Serviced Apartments,
Convention Center
(Non-processing Zone)
IT Park
(Processing Zone)
Proposed Development
S.No SEIAA Observations TRIL Response
Fundamental Observation :
i In the EC issued, Basement 3 not included but
constructed at site.
We have obtained approval for parking of
6,247 cars and 12,131 two wheeler parking as
well as 25 bus parking within campus, for
which we have obtained EC for basement 1 and
2, Stilt level and the remaining as surface
parking.
During construction, we have provided one
more additional basement and stilt level for
parking, to avoid heat island effect due to open
parking planned earlier.
ii EC was issued for only 1 – IT block, but 4 IT
blocks constructed.
We wish to clarify that it is an IT Park
comprising of the blocks A,B,C,&D as per our
initial application and presentation to the
committee
iii EC was issued only to have Retail shop with
Basement -1, G.F and 3 floors, where as 13
floors are constructed.
Non-Processing Zone consisting of Hotel, Retail
and Residential has not yet been constructed.
Besides our revised amendment application dt
27.11.13 was made for amendment of product
mix from Retail /Residential to office towers.
Observations as per SEIAA
dt.04/08/2014 & TRIL Response
S.No SEIAA Observations TRIL Response
Env. Clearance Observation :
i Change in product – Mix is noted in construction
carried out. EC was issued for Hotel, Residential
complex and retail shop. But now as per the
construction carried out, It is found changed to
IT blocks of 4 – Nos, Blocks C & U were not
included, but already constructed.
IT Park (Comprising of Blocks A,B,C,D&U)
Constructed in Phase – I, Non processing zone
comprising Hotel, Residential & Retail not
constructed.
Proposal seeking amendment to include Block
E&F and Service apartment/Convention centre
has been submitted.
ii In EC issued Blocks A,B,C,D were not included
but already constructed.
We wish to clarify that it is an IT Park
comprising of the blocks A,B,C,&D as per our
initial application and presentation to the
committee
Observations as per SEIAA
dt.04/08/2014 & TRIL Response
Utilities -Water & Power
requirement
As per initial EIA approval Description Raw Water Quantity Power Requirement
Approved Total project1300KLD 30 MVA Current proposal Description Raw Water Quantity Power Requirement
Phase –1 IT Park -Block A, B, C, D & U 728.5 KLD19.2 MVA
Phase –2
IT Park -Block E & F 351.08.1
Service Apartment & Convention
Centre
161.52.7
Total (Phase -1 + Phase –2)1241 KLD30 MVA
Total fresh water demand
(1010 KLD)
Water treatment plant
(950 KL)
Flow to DG scrubber (50 KLD)
Bldg Maintenance (10 KLD)
Sewage treatment plant
(Capacity -1400 KLD)
Water available from STP @
95% recovery (1330 KLD)
Domestic purpose @ 45 LPCD
(1410KL)
Green belt
(115 KLD)
AC Cooling tower make
up (700 KLD)
from STP
(460 KLD)
To STP
(1400 KLD)
5% transmission
loss (55 KLD)
Water from CMWSSB
Treatment process
Total Consumption =
2,285 KLD
44% of Total Requirement
56% of Recycled
Energy Conservation Measures Water Recycling & Reuse
Parking requirement:
As per CMDA
requirement
As provided
Description
Car
Parking
2 Wheelers
Car
Parking
2 Wheelers
Phase
–1
IT Park -Block A, B, C, D & U 3,968 7,936 3,968 8,000
Phase
–2
IT Park -Block E & F 1,440 2,880 1,446 2,914
Service Apartment &
Convention Centre
96 360 96 366
Total (in Nos) 5,504 11,176 5,510 11,280
As per EC Approval 6,247 12,131
•EC Approval obtained for 6247 cars, 12131 Two wheel ers & 25 Buses •Parking Nos provided as per CMDA Norms and well wit hin the
approved limit
TRIL’s Commitment to the
Environment
Green Initiatives at RITC
campus
•Phase –I : IGBC (LEED) –Goldlevel certified
•Phase –II : LEED Goldlevel certification in progress
•First developer to obtain EnMS50001 Certification (Energy Management
System)
•Zero discharge –MBR based STP; Treated water used for cooling towe r
make up, landscape & flushing.
•480 KW Solar power plant installed at Phase –I terrace.
•Landscaped podium to avoid Heat island effect.
•Quality Lab for testing of water / air regularly.
•Solid waste Management –Organic waste composter unit –installed &
operational.
LEED Certification
Certifications –IMS
First developer in Chennai to obtain IMS certificat ion
•Integrated Management System with
ISO 9001:Quality Management Systems,
ISO 14001:Environment Management
Systems and OHSAS 18001
•Initially Certified for IMS in 2011 and
Recertified in 2014
Certifications –ENMS
•Certified for ISO 50001: Energy
Management Systems in March 2012 and
recertified in 2015
•Certified by BUREAU VERITAS Certification
First developer in Country to obtain EnMS 50001 cer tification
Awards / Certifications
Ramanujan IT City has been awarded
as the Best Commercial Property in
Chennai.
Ramanujan IT City has been awarded
and certified as “Gold Rated Green
Building” atCII GreenBuilding Congress
heldatChennai,October-2013.
RamanujanIT City has been Awarded
and Certified as Environment Friendly
Project of the Year in CMO Asia Real
Estate Excellence Awards 2014,
Singapore
Award for highest investor among
Private SEZ during 2012-13 receivedon
31
st
October2015.
Awards / Certifications
VALUE ADDITIONS AT SITE
Organic Waste Converter (OWC)
“ The Organic Waste is converted into homogenized
odour free output within 20 minutes through Bio
Mechanical Process and is converted into COMPOST
within two weeks which can be used in gardens and
landscape applications. With this system we are
effectively disposing food waste scientifically there
by reducing landfill burden to that extent. We are
collecting the food waste from our Food court and all
our tenants cafeteria. The waste segregation is
initiated at primary collection stage itself to use the
waste effectively. As an average we generate 100 to
150 kg per day from our waste. We have a separate
trainedteam inrollto take uptheservicedaily”
Organic Waste Converter -
Process Flow Chart
OWC -Work process
OWC -Curing System
OWC
Manure applied for
landscape
Roof Top Solar PV System
Location
Area (Free
Space)
Capacity
No. of PV
Module
No. of Invertors
Block - A (Neville Tower) 20,650 Sq.ft 162 KW 648 Nos 9 Nos
Block - B (Carr Tower) 10,300 Sq.ft 120 KW 480 Nos 7 Nos
Block - C (Hardy Tower) 10,300 Sq.ft 108 KW 432 Nos 4 Nos
Block - D (Littlewood Tower)4,300 Sq.ft 90 KW 360 Nos 4 Nos
Block - E (Infinity Tower)2,500 Sq.ft 38.4 KW 120 Nos 1 No
Block - F (Cambridge Tower)4,200 Sq.ft 65 KW 200 Nos 1 No
Total 583.4 KW
Total expected generation per month 80,000 Kwh
Solar Power
Solar Panels have been installed in all 4
Blocks constructed in Phase –I to generate
480 KW power to cater to all common area
lighting needs.
Roof Top Solar Panel Installed
Wealth Out of Waste (WOW)
Program
Dust bin to Segregate the different waste
to ease the waste for recycling.
R
Paper
R
Metal
R
Plastic
R
This has been placed at various
places in the park including podium
area
R
Also E Waste Dust bin has been
placed at various places in the park
includingpodiumarea
Flood and natural disaster management /
Earth Quake Resistance
1. Ramanujan IT City has been designed in accordance to the standard codes IS 456
and IS 875for structure and other imposed loads.
2. For Seismic structural stability it has been desi gned in accordance to the code
IS 1893:2002for Zone –IIIcriteria.
3. The Chennai Disaster resilience report classifies our site in Zone X, Wherein, the
overall resilience is slightly above average.
4. The Flood risk areas in this Zone is Velacherywhi ch is 5 Kmsfrom the site and
Adyarwhich is 3 kmsaway.
5. The site is also located at 2.25 Kmsfrom the Coastal Regulatory Zone (CRZ)
6. The approach road –OMR is at a height of +4.1 mabove MSL (Main sea level). The
internal roads are at +5.0 mabove MSL (0.9 m above road level)and the ground
level is at +5.52m(1.4 above road) hence suitable precautions have be en taken
while designing this campus to mitigate floods. The site is also equipped with
suitable storm water drains on the periphery.
7. The habitable area starts with the Amenity level which is at +11.82 m above MSL
(7.7 m above road level)hence more safety for the occupants.
Site Photographs during
Monsoons
Entry Gate & Internal Roads during heavy
rains in Dec’ 2015:
•No water stagnation inside the site.
•All Terrace & Surface water run offs
were managed by collection & proper
drain network.
PROJECT DETAILS
Green belt area
Landscaping / Plantations -
External Views
TRANSPLANTED
TREES IN OSR
Landscaping / Plantations -
External Views
Landscaping / Plantations –
Podium Views
Unique Podium Concept
@ Ramanujan IT City
Landscape Features
nLandscape has played a major part in reducing
the Heat Island effect in the campus
nMajor portion of the podium area is covered
with greenery thereby reducing the heat
transmission to the lower floors and glare on to
the façade
nIn the Ground floor too care has been taken to
reduce the glare with extensive vertical
landscaped compound wall and planters along
the entire stretch
nThe top soil had been preserved at site during
excavation and same has been used for
landscape in site
nCare has been taken in choosing native species
of plants thereby reducing the water
requirement and survival of same.
Landscape Features
nRecycled water from STP is used for
landscape water requirement
nSprinklers have been installed to minimize
wastage of water
nRecycling of water in water bodies has also
helped in reducing the water consumption
in landscape
nMore than 90 % of the cars are located
undercoverinbasements.
nCare has been taken in choosing trees in
Ground level to seeto it the sametakes not
more than 5 years to grow full height and
give adequate cover to the open car parks
located in the external areas, thereby
reducingtheHeatIslandeffect.
Parking
-5 Levels of ample car parking –Reduces heat island effect as a result of covered car park
-Epoxy flooring to reduce wear and tear
•Rain water harvesting percolation pit with over flo w connection to the system with
micro filter.
•STP has been designed to handle 100% waste water fr om the campus.
•Water efficient flush & flow fixtures have been ado pted.
•Water recycling using treated water for the Toilet flush, landscape balance for the
cooling tower make up ,drift and evaporation losses (sewage recycled to the extent of
95 % )
•Variable speed secondary / tertiary pumps which ens ure that chilled water is supplied
according to demand.
ENERGY CONSERVATION MEASURES –Water Recycling
STP –Membrane Bio-reactor
S
e
w
a
g
e
f
r
o
m
u
s
e
r
p
o
in
t
W
C
a
n
d
u
r
in
a
ls
Coarse screen chamber O
il a
n
d
g
r
e
a
s
e
c
h
a
m
b
e
r
Collection / Equalization tank
Fine screen chamber
A
n
o
x
ic
t
a
n
k
Bio-Aeration tank
MBR tank UV lights
Hypo dosing
Treated water tank
To all blocks WC’s and urinals
Bio sludge to gardening
L
iq
u
id
t
o
c
o
lle
c
t
io
n
p
it
Decanter
Sludge holding tank
Softener
Softened water tank
C
o
o
lin
g
t
o
w
e
r
m
a
k
e
u
p
t
a
n
k
WASTE WATER TREATMENT
Equipment
Skid
Membrane
Tanks
Bio Reactor
Aerobic
Zone
Use of Membrane Bio Reactor (MBR) Technology Sewage treatment plant
has helped recycle 56 % of the total water requirem ent in the campus
Coarse Screen Chamber
Fine Screen Chamber
MBR Based Sewage Treatment Plant
Collection / Equalization Tank
Anoxic Tank with Mixer
Bio Aeration Tank MBR Tank
MBR Based Sewage Treatment Plant
MBR Modules & Air Line (Top View)
MBR Permeate Transfer Pumps
UV System
Centrifuge
MBR Based Sewage Treatment Plant
•RamanujanIT City building design was done @ LEED-
GOLD Rated level in the following areas
•Energy
vBUILDING ENVELOPE
vHVAC
vELECTRICAL
•Indoor Air Quality
•Waste Recycle
•Exercising the operation with EnMS 50001 Certificat e
Ramanujan IT City –Design Phase
•Hollow block for wall construction
•Energy efficient Façade design with composite ACP c ladding (U-
Value –0.14 Btu/hrft
2
°F)
•Covered Parking
•Window Wall ratio of 30%
•Over deck XPS Insulation
•Double Glazed Unitisedglazing (U-Value –0.32 Btu/hr ft
2
°F)
•Punch windows on East & West Direction to control H eat radiation
•Strip glazing on North & South for Efficient Day li ghting
•CentralisedServices in Utility block
•Three basement & two stilt covered parking for the vehicles.
•Providing separate smoking provision away from buil ding,
maintaining building as nonsmoking zone
ENERGY CONSERVATION
MEASURES -Architectural
Façade Design
Punched windows on the East and West To
control heat radiation
Glazing on the North and South to
allow maximum day light
N
Cooling tower selection for minimum drift and noise level
N
VFD for motor speed control.
N
Heat recovery wheels for pre cooling fresh air by u sing the waste exhaust air
from toilet etc., This ensures energy conservation in green buildings despite
of higher fresh air intake (i.e., In green building s 30% more fresh air needs to
be supplied in all breathing zones to meet increase d ventilation credit)
•Motorized damper for the fresh air to operate based on CO2 sensor.
•High COP (Low IKW / TR) Water chilling machines.
•CFC & HCFC free system used in all HVAC & fire supp ression.
•CO sensors for the basement ventilation fans.
ENERGY CONSERVATION MEASURES –HVAC
Indoor Air Quality
MIntent
UPrevent Indoor Air Quality problems
UEnhance indoor air quality
AComfort
AWell-being of the occupants
Good IAQ can enhance
Occupant productivity
by 5-15%
Area cfm per person cfm per sq.ft
Office space 5 + 0.06
RITC –CFM 30 % more than ASHRAE standards
Indoor Air Monitoring
MCO2 Monitoring
UAll densely occupied spaces
UCO2 locations between 3’ and 6’ above the floor
MNon-densely occupied spaces
MA direct outdoor air-flow measurement
MMinimum air flow should be as per AHRAE 62.1-2004
MIncrease air ventilation rates to all occupied spac es by at least 30%
above the minimum rate required by ASHRAE 62.1 201 0
RECOMMENDED
CO2 LEVEL BY
ASHRAE 1000PPM
Space Environment
MERV Filters
MMERV – Minimum Efficiency Reporting Value
UA number from 1 to 16 – relative to an air filter’s
efficiency.
UThe higher the MERV, the more efficient the air
filters is in capturing particles.
MERV Filter
MIntent
UThermal comfort to be met throughout the year
MBoth temperature & humidity to be met
MRH control necessary
MThermally comfortable environment
UComply with ASHRAE standards 55-2004, including humidity control
Thermal Comfort
Room
Temperature
Range (°C)
Optimum
temp. (°C)
Winter 20 – 23.33 21.67
Summer 22.78 – 26.11 24.44
Water-cooled centrifugal Chillers With series counter-flow arrangement
In spite of higher capital costs, water cooled
chillers were used due to the reduced
operational cost.
100% Recycled water used for Cooling tower
make up.
Energy Conservation Measures
MAir-conditioning
UProvided Water Cooled Chiller with higher COP
UWater cooled chiller - energy consumption less than Air
cooled Chiller
URecycled water to Cooling Tower
UEnergy efficient motors
Operating Cost Intial Inv. Maintainenance / Consumables
89%
10% 1%
AC LIFE
CYCLE
COST
0.65 KW/TR
1.3 KW/TR
POWER CONSUMPTION
Energy Conservation Measures
-Electrical
•Energyefficientfluorescenttubelights(T-5)shallbeuse d.
•All fluorescent light fixtures are specified to incorporat e electronic chokes
which have less watt-loss compared to electro-magnetic cho kes and result in
superioroperating power factor.This indirectlysavesene rgy.Electronic chokes
alsoimproveslifeofthefluorescentlamps.
•Energy efficient fluorescent lamps & CFL lamps which give ap prox. 30% more
light output for the same watts consumed and therefore requi re less nos. of
fixturesandcorrespondinglowerpointwiringcosts.
•An APFC relay based on contactor switching is proposed to eff ect the power
factorcorrection/improvement.
Energy Efficient Fittings Used
LED
CFL
T5
VFD
We request the committee to approve our
amendment application and accord necessary
environmental clearance.
Thank you..
Summary