wadhwacommunisation0
43 views
18 slides
Jun 08, 2024
Slide 1 of 18
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
About This Presentation
electrical project
Size: 295.17 KB
Language: en
Added: Jun 08, 2024
Slides: 18 pages
Slide Content
Energy Audit-a small introduction
A presentation by
Pune Power Development Pvt. Ltd.
PPDPL
What is an Energy Audit ?
Energyauditisthefirststeptoward
systematiceffortsforconservationof
energy.Itinvolvescollectionandanalysisof
energyrelateddataonregularbasisandina
methodologicalmanner.
PPDPL
The Role of an Energy Audit
Anenergyauditidentifieswhichareasinyour
establishmentunnecessarilyconsume toomuch
energy,whereenergyisbeingconsumedandassesses
energysavingopportunities,whichisthemostcost-
effectivetoimprove,soyougettosavemoneywhereit
countsthemost.
Inthefactory,doinganenergyauditincreases
awarenessofenergyissuesamongplantpersonnel.An
energyauditineffectgaugestheenergyefficiencyof
yourplantagainst“bestpractices”.Whenusedasa
“baseline”fortrackingyearlyprogressagainsttargets,
anenergyauditbecomesthebestfirststeptowards
savingmoneyintheproductionplant.
PPDPL
Preliminary energy audit
• Establish energy consumption in the organization
• Estimate the scope for saving
• Identify the most likely (and the easiest areas for
attention
• Identify immediate (especially no-/low-cost)
improvements/ savings
• Set a 'reference point‘
• Identify areas for more detailed study/measurement
• Preliminary energy audit uses existing, or easily
obtained data.
PPDPL
Detailed Energy Audit
Thedetailedauditgoesbeyondquantitative
estimatesofcostsandsavings.Itincludes
engineeringrecommendations andwell-defined
project,givingduepriorities.Approximately95%of
allenergyisaccountedforduringthedetailedaudit.
Thedetailedenergyauditisconductedafterthe
preliminary energy audit. Sophisticated
instrumentationincludingflowmeter,fluegas
analyzer,scannersandotheradvancedinstruments
areusedtocomputeenergyefficiency.
PPDPL
Inputs and Outputs of Energy audit
PPDPL
Contents of an Audit
Anenergyauditassessestheeffectivenessof
managementstructureforcontrollingenergyuse
andimplementingchanges.Theenergyauditreport
establishestheneedsforplantmeteringand
monitoring,enablingtheplantmanager to
institutionalizethepracticeandhence,savemoney
fortheyearstocome.Theenergyauditactionplan
liststhestepsandsetsthepreliminarybudgetfor
theenergymanagementprogram.
PPDPL
Steps for Energy Management and Energy audit….
•Analysis of energy use
•Identification of energy projects
•Cost benefit analysis
•Action plan to set implementation priority
1. Analysis of energy use
Identifyingwhereenergyisusedisusefulbecauseit
identifieswhichareastheauditshouldfocusonand
raisesawarenessofenergyuseandcost.
Analysisofenergyuseinthereviewofmanagement
structuresandproceduresforcontrollingenergyuse.
Thisisagoodsourcedataforallocatingenergyuse.
Theplantmanagercanalsolistallequipmentusedand
thecorrespondingoperatinghours.Withthis
information,onecancreatespreadsheetinformation
andgeneratechartsusefulforanalysis.
PPDPL
1. Analysis of energy use
ImportantpointstobeconsideredwhencollectingSiteLoadData:
•Operatinghours-Thiscanbegatheredfromplantpersonnel.Itis
importanttoensuretheaccuracyofthisdatabecausemuchofthe
potentialforenergysavingsliesoncorrectestimationofthe
equipment’soperatinghours.
•Dutycycle-Machinessuchaslargeelectricmotorshavevarying
loadsandhence,differentpowerrequirements.
•Actualpowerconsumed-Forelectricpowerusers,thisisbasedon
either3-phasecurrent/voltagereadingsorpoweranalyzer
measurements(e.g.,directkWwhichincorporatespowerfactor).
Forfuelusers,tankreadingsofmonthlyconsumptionestimates
andflowmeterswithtotalizationcanbesourcesofmeasurementof
air,water,steam,oiletc..
PPDPL
2. Identification of energy projects
•Opportunitiesforenergysavingscanrangefromthe
simplest,suchaslightingretrofits,tothemost
complexsuchastheinstallationofacogeneration
plant.Theimportantthingtorememberistofocus
onmajorenergyusersandareas.Alwaysapplythe
80/20rule,focusonopportunitiesthatprovide80%
ofthesavingbutrequire20%input.Afterthe
preliminaryidentificationofopportunities,spend
moretimeonthosewhichhaveshorterpayback
periods.
PPDPL
4. Action plan to set implementation priority
•Afterpassingthecostbenefittest,anactionplan
shouldbedevelopedtoensurethattheopportunities
identifiedareimplemented.Theactionplanshould
includeallthemajorstepsforimplementingthe
opportunityaswellasthepeopleresponsible.
PPDPL
And finally, …
Thisprogramwillbesuccessfulwhenthetop
managementsoftheorganizationunderstand
thatenergyauditproducesthehighestprofitsin
theorganizationataminimumcost.
PPDPL