Lawrence Livermore National Laboratory
Electric Shock Incident from Transformer Test
on January 2008
Sherman Chao, Facility Representative
at Livermore Site Office
Performance Measures x.x, x.x, and x.x
2
Option:UCRL# Option:Directorate/Department Additional Information
S&T Principal Directorate—Engineering
Summary of Events
1.New Transformerswere installed to replace old ones.
2.2 groups of Electricians workingon testing the sameTransformer
Circuit
1st group -“Megger” insulation teston Transformer
2nd group -continuity teston Transformer’s junction box at a
different floor.
3.2nd group electrician received a shockfrom Meggering by 1st
group via neutral wire.
4.LLNL Conducted Investigation with Fac Rep as
observer/participant
3
Option:UCRL# Option:Directorate/Department Additional Information
S&T Principal Directorate—Engineering
Electrician 1 activities
•Testing insulationon the new transformer on 1st floor.
•Using Hi DC voltage, Low current Instrument
Megger @ 1kV DC @ 1mA (2mA max.)
Note: GFI’s are set at 4 to 6mA AC.
•Presumed no else was workingon the system.
•Isolated the transformerby opening Circuit breakers but
not neutral
•Primary Power LOTO’d
4
Option:UCRL# Option:Directorate/Department Additional Information
S&T Principal Directorate—Engineering
Transformer Insulation Testing
To basement
switchgear
Transforme
r
Intended Current Path
Insulation
Unintended Current Path
1
5
Option:UCRL# Option:Directorate/Department Additional Information
S&T Principal Directorate—Engineering
Transformer and Name Tag
1500/2000 KVA 3 Phase
13,800 v to 480/277v
Transformer
6
Option:UCRL# Option:Directorate/Department Additional Information
S&T Principal Directorate—Engineering
Shock Source -Megger Instrument
To Test
Transformer
Insulation
Resistance
7
Option:UCRL# Option:Directorate/Department Additional Information
S&T Principal Directorate—Engineering
Electrician 2
Performing Continuity Testing on same system
Received shock to Electrician-2 while labeling
transformer busin Junction box.
Shock Source-Megger insulation resistance tester @
1,000 v. & 1mA.
Injury very minor
8
Option:UCRL# Option:Directorate/Department Additional Information
S&T Principal Directorate—Engineering
Continuity Testing wires at Buss Tap Junction Box
Switch Gear
Circuit Breaker
Buss Tap
Junction Box Switch Gear
Circuit Breaker
A
B
C
N
A
B
C
N
B151 Rm B137
Downstairs
Jumper
C to N
Electrician 2
From
Transformer
Conduit
Continuity Tester
9
Option:UCRL# Option:Directorate/Department Additional Information
S&T Principal Directorate—Engineering
Buss Junction Box in Basement
Buss Junction
Box (closed)
Continuity Tester
10
Option:UCRL# Option:Directorate/Department Additional Information
S&T Principal Directorate—Engineering
Continuity Test and Shock Site
Junction Box
Site of the shock
Buss Bars
Buss Bars C
phase
11
Option:UCRL# Option:Directorate/Department Additional Information
S&T Principal Directorate—Engineering
Current Path that shocked Electrician-2
1
1
2
Unintended Current Path
12
Option:UCRL# Option:Directorate/Department Additional Information
S&T Principal Directorate—Engineering
Direct Cause
Operation of the Megger instrument, by
Electrician-1 testing the transformer insulation,
shocking Electrician-2 working on the same
distribution system.
13
Option:UCRL# Option:Directorate/Department Additional Information
S&T Principal Directorate—Engineering
Root Cause
Failure of LLNL management to implement adequate
systems, procedures and controls
•Subcontractor management’s daily supervision was
poor
14
Option:UCRL# Option:Directorate/Department Additional Information
S&T Principal Directorate—Engineering
Contributing Causes
1.Work being performed concurrently.
2.Lack of Communication
3.Performing insulation test without isolating the
transformer
4.Lack of hazard understanding.
5.Lack of design drawings.
15
Option:UCRL# Option:Directorate/Department Additional Information
S&T Principal Directorate—Engineering
Contributing Causes (continued)
6.Incorrect Presumption of Open Breakers
7.Lack of any effective Work Controls
8.Lack of responsible person
16
Option:UCRL# Option:Directorate/Department Additional Information
S&T Principal Directorate—Engineering
Judgments of Need
1.Need Work Controlsformultiple buildings and systems
2.Need to use project drawings
3.Need to formalize daily tailgate meetings
4.Need a policy and enforcement of multi-team work.
5.Need to establish a process, for Megger tests
6.Need trainingonthe Meggertest process
7.Need training on new Work Control Procedures
17
Option:UCRL# Option:Directorate/Department Additional Information
S&T Principal Directorate—Engineering
Other Comments
1.A lack of technical inquisitiveness
2.Circuit Isolation with no LOTO.
3.Slow in reporting
4.LLNL Rigorous Work Control Process
5.Electrical Severity Calculation
6.Lessons Learn Video
18
Option:UCRL# Option:Directorate/Department Additional Information
S&T Principal Directorate—Engineering
Questions?