Electrical Installation and Maintenance 12-Quarter 1-Week 7.docx

RyanFCaete 226 views 3 slides Aug 01, 2024
Slide 1
Slide 1 of 3
Slide 1
1
Slide 2
2
Slide 3
3

About This Presentation

EIM


Slide Content

DAILY
LESSON LOG
School A.O. FLOIRENDO NATIONAL HIGH SCHOOL Grade Level 12
Teacher RYAN F. CAÑETE Learning Area EIM NCII
Teaching Dates
and Time
October 9, 10 & 12, 2023

Quarter/Week 7

DATE:
October 9, 2023 October 10, 2023 October 12, 2023
Session 1 Session 2 Session 3
I. OBJECTIVES
A. Content Standards The learner demonstrates an understanding of the principles in performing roughing-in activities.
B. Performance Standards The learner independently performs roughing-in activities based on the Philippine Electrical Code (PEC) and National Electrical Code
(NEC).
C. Learning Competencies/
Objectives
1.Discuss the Safety procedure in installing
wire ways and cable trays
2.Perform the proper Safety procedure in
installing wire ways and cable trays
3.Value the importance of following proper
Safety procedure in installing wire ways and
cable trays
II. CONTENT Safety procedure in installing wire ways and
cable trays
III. LEARNING RESOURCES
A. References Curriculum guide, and Philippine Electrical Code
1. Teacher’s Guide pages CG, Page 14
2. Learner’s Material pages Philippine Electrical Code, Article 3.0 - Wiring Methods
3. Textbook pages Electrical Lay-out and Estimate, Page 37
4. Additional Materials from
Learning Resource (LR)
portal
SLM, EIM NCII
B. Other Learning Sources

IV. PROCEDURES/
LEARNING DELIVERY MODE
(4 A’s of Learning)
Activity:
Instruction: (Safe to Touch) Make the learners
aware of potential hazards through this safe-to-
touch sorting activity. learners will place items
that are safe or unsafe to touch on the correct
side of a T-chart.
Analysis:
1.What are the risk and hazard during
installation of wire ways and cable trays?
2.How to prevent risk and hazard during
installation of wire ways and cable trays?
3.Why we need to follow proper safety
procedures in installing wire ways and cable
trays?
Abstraction:
1.Risk and Hazard in installing of
wire ways and cable trays
2.Cautions and preventions in
installing of wire ways and
cable trays
3.safety procedures in installing
wire ways and cable trays
Application:
Instruction: The learners will perform
safety preventions in installing wire
ways and cable trays
ASSESSMENT
(Format and Results)


Instruction: The teacher will assess
the student output with the use of a
testing procedure guidelines.
V. REMARKS




VI. REFLECTIONS

A. No. of Learners who earned
80% in the evaluation


B. No. of Learners who require
additional activities for
remediation who scored
below 80%



C. Did the remedial lessons
work? No. of learners who
have caught up with the
lesson

D. No. of learners who continue
to require remediation



E. Which of my teaching
strategies worked well? Why
did these work?







F. What difficulties did I
encounter which my principal
or supervisor can help me
solve?







G. What innovation or localized
materials did I use/discover





which I wish to share with other
teachers?

Prepared by: Checked and Reviewed: Approved:


RYAN F. CAÑETE MELCHORA O DUMBASE CHONALYN C. DOCTORA, EdD
Teacher II SHS Officer In-Charge Principal II
Tags