STATUS OF RESERVOIRS OF MAJOR AND MEDIUM IRRIGATION PROJECTS AND KHARIFF ACTION PLAN 2023-24 S.No Name of the Project / MFD in Cusecs FRL / Capacity Present Water Level / Capacity Ayacut in acres Qunatum of water Required (TMC) Date of Water release Transplantation in Acres as on Dt.31.8.23 Balance ayacut to be transplanted Mts TMC Mts TMC Ayacut Created Ayacut Proposed for khariff 2023-24 1 2 3 4 5 6 7 8 9 10 11 12
S.No Name of the Project Quantum of water utilized in TMC as on Dt.31.08.23 Quantum of Water required for Drinking / Industries Quantum of water further required for this season as on Dt.31.08.23 Anticipated Inflow for balance period in TMC 13 14 15 16
Sl. No Name of the Project/MFD in Cusecs Khariff Action Plan in relation to availability of water Bottlenecks 17 18 Anticipated available water is sufficient to meet the requirements Short fall can be compensated by implementing : On and Off Method Diversion from other systems Supplementation by conjunctive use.