https://www.amazon.in/Decibel-Meter-Risepro-Digital-Sound/dp/B01EZZ8B5Q/ref=pd_day0fbt_img_sccl_2/260-5341804-1606734?pd_rd_w=6FYAx&content-id=amzn1.sym.9fcd4617-323e-42b7-9728-3395e1b2fea0&pf_rd_p=9fcd4617-323e-42b7-9728-3395e1b2fea0&pf_rd_r=ECZE7D2P613PV6WJ082Y&pd_rd_wg=Ib1bc&pd_rd_r=6c8faeb5-25cd-4dca-9f33-006f990aceae&pd_rd_i=B01EZZ8B5Q&psc=1 > Ambient monitoring must be done according to the state pollution board norms i.e. parameters & frequency > Ambient Noise monitoring to be done at all side of the plant near boundary wall > Ambient noise must be monitored through external NABL approved agency. > Ambient Noise must be within the prescribed limit - Day time 75 dB & Night time 70 dB > Physical original report must be available with unit Measurable - Audit compliance Requirements for the audit points
https://www.amazon.in/InkbirdPlus-CO2-Monitor-Formaldehyde-Temperature/dp/B098TFLB11/ref=sr_1_4_sspa?keywords=Air+monitor&qid=1690959446&sr=8-4-spons&sp_csd=d2lkZ2V0TmFtZT1zcF9hdGY&psc=1 > Ambient Air Quality monitoring at four side of plant near boundary wall by external NABL approved lab. All test parameters to be checked as per air emission standard > ETP & STP inlet & outlet water testing to be done as per standard. > Physical report of the testing must be available with unit Measurable - Audit compliance Requirements for the audit points
We have need Create. Hazardous Waste area. > All hazardous waste to be stored properly at safe place. Away from, Drain, Pit, soil contamination, sewage line, Protected from entry of rain water & unauthorized entry. > Hazardous waste should have felicity of non leakage flooring, covered with walls & roof, proper ventilation, & waste to be stored in proper packing (Sludge in HDPE bag, Oil in closed drums, empty container without liquid etc. Measurable - Audit compliance Requirements for the audit points
Health Check up not done We have need checkup > All People working in hazardous operations must have to go annual health check up & Health check up record of individual must be available in unit. > Hazardous operations like - Peoples Handling chemicals, working in High noise (Granulator operation, DG operation, ultrasonic welding , Vibration welding. Forklift operator, Working in dusty atmosphere Measurable - Audit compliance Requirements for the audit points
No first aid items available in first aid box > For first 150 manpower 1 first aid box is required after that 1 first aid box for every 50 manpower. > First aid box to be provided in such a planning that all area to be covered. > For every first aid box 3 trained first aider to be available > With First aid box list of first aid items to be provided. > No Any medicine to be kept in First aid box, only first aid items to be available > List of authorized first aider to be display with first aid box > First aid box to be displayed with sig board > Locations of first aid box to be displayed at common notice board > First aid box to be checked on weekly basis > No schedule H drugs to be available of provided to anyone. We have provide First Aid kit Measurable - Audit compliance Requirements for the audit points
Testing of air pressure vessel not done > All Pressure vessel having accumulation of pneumatic air more than 500 ml & more than 1 bar pressure that will be consider as pressure vessel. > Every pressure vessel must be tested through external competent person & test report must be available in unit > Hydraulic testing of all pressure vessel must be carried out by external competent person at frequency of every 4 year. > ultrasonic testing of all pressure vessel must be carried out by external competent person at frequency of every 2 year. > External physical checking & inspection of all pressure vessel must be carried out by external competent person at frequency of every six month. > Test report of all individual pressure vessel must be available in unit as per state factory rules format > All Pressure vessel must have identity serial no, Capacity, Year of mfg. Testing done on & testing due on marked on the every vessel. Measurable - Audit compliance Requirements for the audit points
Earthing checking not done > All Electrical or hazardous process connected earth pit must be Checked & tested Annually by external competent agency. > Earthing value should not be more than 3 ohms of individual Earthing pit. > Report of all individual Earthing points must be available in unit on competent agency report format > Each individual earth pit must be identified with serial no, Earthing test done on & due on & earth resistance value. > All Earth pit must be properly covered & prevented from the entry of soil & other materials. https://www.amazon.in/Metravi-AC-6-Electrical-Line-Tester/dp/B07SR21Z26 Measurable - Audit compliance Requirements for the audit points
There is no on site emergency plan available in unit > On site emergency plan (signed by unit head) must be available in all units. > On Site emergency plan must be circulated to all departments & all key personnel within the unit. > Emergency plan must be displayed at security office (Emergency control center) > All Emergency team members must be aware about on site emergency plan. > If any changes in the on site emergency plant then the plan must be revised accordingly. Measurable - Audit compliance Requirements for the audit points
Fire NOC not available for building > Unit must have a valid fire NOC/ license issued by local administration / Fire department. > All conditions of the fire NOC/ license must be maintained without any violation. > In case renewal required than renewal application must be submitted at least 60 day prior to expiry of existing NOC Measurable - Audit compliance Requirements for the audit points
Scissor lift bottom side edge of the scissor lift is not protected with sensor or fencing > All the scissor lift which have the open / unguarded edge must be protected with any electronic safety device which can stop immediately incase any obstructions at edge points. > Non operated side of scissor lift / dock leveler must be guarded properly to avoid any un-authorized entry . > All the safety device installed to scissor lift / dock leveler must be checked by user on daily basis & preventive maintenance also to be done by maintenance or engineering team. Record of the Preventive maintenance & checking must be recorded in hard copy. Light Curtains Part no-83774 Comp-Banner HSN No-90319000 Measurable - Audit compliance Requirements for the audit points
https://www.amazon.in/ABB-2CSR275080R2104-Vashi-Rcbo-2Csr275080R2104/dp/B0B2LXNKSH/ref=sr_1_5?crid=12CI397Q0DO2G&keywords=rccb+16+abb&qid=1690967220&sprefix=rccb16+abb%2Caps%2C192&sr=8-5 > All electric circuit must have supply through RCCB > RCCB/ELCB installed should have tripping mechanism rating of 30 mA > RCCB installed functionality to be checked at regular interval and record available Measurable - Audit compliance Requirements for the audit points
https://www.amazon.in/Plantex-Legend-Aluminium-Folding-Ladder/dp/B0B63ZCBTQ/ref=sr_1_25?crid=1993NQ0E0GG8X&keywords=Ladder%2B4%2Bfit&qid=1690967351&sprefix=ladder%2B4%2Bfit%2Caps%2C236&sr=8-25&th=1 > Only Non -conductive material ladder is available for electrical work > Ladder should be free from any physical damages > Ladder base must be available with rubber base as insulation > Ladder base must be balanced in equal surface > In case of extension ladder ,all locks are in working condition > SWL of the ladder must be displayed on the ladder Measurable - Audit compliance Requirements for the audit points
https://www.amazon.in/Epson-Labelworks-Label-Printer-Black/dp/B005J7Y6GS/ref=sr_1_5?crid=3AXLB7ZL3MOE2&keywords=label+printer+epson&qid=1690967491&sprefix=label+printer+epson%2Caps%2C204&sr=8-5 > Is each switch & Circuit breaker legibly marked to indicate its purpose & use & supply connected to Measurable - Audit compliance Requirements for the audit points
https://www.flir.in/products/t865/?veratical=condition%20monitoring&segment=solutions > Is annual plan available for thermal scanning > Is report available along with analysis report > Is the abnormality found during scanning rectified and corrective action taken record available > Is all electrical wiring and equipment are maintained as per thermal scanning standard and frequency defined Measurable - Audit compliance Requirements for the audit points
There is No Fire water tank, There is no Fire fighting Pumps. There is no Fire Hydrant & Hose reels. There is no Fire detection system & fire alarm There is no Sprinkler system installed in unit > Fire protection & detection system must be installed according to the risk in all area. > Fire protection & detection system must be according to NBC 2016 > Fire Detectors, MCP, Fire sprinkler, hose reel, hydrant system must be installed as per requirement Measurable - Audit compliance Requirements for the audit points
https://www.amazon.ca/CGOLDENWALL-Stainless-Wall-Mounted-Emergency-Eyewash/dp/B07FCFXDQQ > Chemical handling area must be provided with eye washer. > Eye washer must be provided within 5 mtrs of working area. > Eye washer must be properly cap & water must be replaced on daily basis. > All Eye washer must checked on daily basis & record to be maintained Measurable - Audit compliance Requirements for the audit points