SlidePub
Home
Categories
Login
Register
Home
General
EPC Project Execution projects manufacturing
EPC Project Execution projects manufacturing
trinathkandavalli301
55 views
184 slides
Sep 27, 2024
Slide
1
of 196
Previous
Next
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
37
38
39
40
41
42
43
44
45
46
47
48
49
50
51
52
53
54
55
56
57
58
59
60
61
62
63
64
65
66
67
68
69
70
71
72
73
74
75
76
77
78
79
80
81
82
83
84
85
86
87
88
89
90
91
92
93
94
95
96
97
98
99
100
101
102
103
104
105
106
107
108
109
110
111
112
113
114
115
116
117
118
119
120
121
122
123
124
125
126
127
128
129
130
131
132
133
134
135
136
137
138
139
140
141
142
143
144
145
146
147
148
149
150
151
152
153
154
155
156
157
158
159
160
161
162
163
164
165
166
167
168
169
170
171
172
173
174
175
176
177
178
179
180
181
182
183
184
185
186
187
188
189
190
191
192
193
194
195
196
About This Presentation
Epc
Size:
16.72 MB
Language:
en
Added:
Sep 27, 2024
Slides:
184 pages
Slide Content
Slide 1
HERVE
BARON
© 2013 – Hervé Baron
The execution of a Complex Project…
A guided tour
HERVE
BARON
Slide 2
HERVE
BARON
© 2013 – Hervé Baron
The actors
The
COMPANY
Client
The EPC
Contractor
The suppliers
The sub-contractors
Slide 3
HERVE
BARON
© 2013 – Hervé Baron
Conceptual evaluation
+ Pre-Project
By COMPANY
Basic Engineering
By ENGINEERING
Project Execution
by EPC CONTRACTOR
Sanction
Sanction
The phases
Slide 4
HERVE
BARON
© 2013 – Hervé Baron
Design
Procurement
Manufacturing
Shipping
Installation
Construction
& erection
Inspection &
tests
Hand-over
Slide 5
HERVE
BARON
© 2013 – Hervé Baron
The multiple sides of a Project
Human Resources Management
Project Control
PROJECT
Slide 6
HERVE
BARON
© 2013 – Hervé Baron
Engineering Sub-Contractor
(India)
Detail Engineering (part)
Shipyard (Korea)
Hull Engineering & Fabrication
Shipyards (Singapore &
Malaysia)
Topsides Fabrication & Integration
Home office (Paris)
•Project management
•Detail Engineering (part)
•Procurement
Satellite office
Detail Engineering (part)
Fabrication yard (Nigeria):
Fabrication (part)
Offshore (Nigeria):
Installation, commissioning, start-up
The multiple sites of a Project
Slide 7
HERVE
BARON
© 2013 – Hervé Baron
Project
Engineering
Procurement
Construction
Slide 8
HERVE
BARON
© 2013 – Hervé Baron
Project
Engineering
Procurement
Construction
Slide 9
HERVE
BARON
© 2013 – Hervé Baron
Process facilities: Feedstock and products flow
Feedstock composition
Battery limit conditions
Equipment Spare
Performance:
Products specifications
Energy efficiency, emissions
Utilities:
Electric power supply
Other utilities
Systems:
Process control
Fire/gas alarm
Public address, LAN, PABX
Infrastructure: Administrative and technical
buildings
Control room
Access road
Site fencing, gates, check point
Design criteria:
% of over design
Environment data:
Min/max temperature
Rain/snow fall
Wind
Geological conditions
Applicable codes and standards:
International standards
Local rules
0
5
10
15
20
25
30
35
40
45
50
-85
-80
-75
-70
-65
-60
-55
Pressure (bar)
The facilities design basis
Slide 10
HERVE
BARON
© 2013 – Hervé Baron
Engineering
Documents for Purchase: bill of quantity & specification Documents for Construction: Construction drawings &
specifications
Design basis: - Functional
requirements
- Client
specifications
- Design codes
Engineering
in the Project
Slide 11
HERVE
BARON
© 2013 – Hervé Baron
Project
Engineering
Instruments&
Control
Layout
& Piping
Process
Electrical
Equipment
Civil
Safety
Procurement
Construction
Slide 12
HERVE
BARON
© 2013 – Hervé Baron
Project
Engineering
Instruments&
Control
Layout
& Piping
Process
Electrical
Equipment
Civil
Safety
Procurement
Construction
Slide 13
HERVE
BARON
© 2013 – Hervé Baron
Process simulations
Slide 14
HERVE
BARON
© 2013 – Hervé Baron
Heat & Material
balance
Thermodynamic
calculations Process Flow
Diagram (PFD)
Slide 15
HERVE
BARON
© 2013 – Hervé Baron
Equipment list
Slide 16
HERVE
BARON
© 2013 – Hervé Baron
Equipment
duty
Slide 17
HERVE
BARON
© 2013 – Hervé Baron
Process data sheet
Slide 18
HERVE
BARON
© 2013 – Hervé Baron
Process Flow Diagram (PFD)
Slide 19
HERVE
BARON
© 2013 – Hervé Baron
Piping & Instrumentation Diagram (P&ID)
Slide 20
HERVE
BARON
© 2013 – Hervé Baron
Piping &
Instrumentation
Diagram (P&ID)
Slide 21
HERVE
BARON
© 2013 – Hervé Baron
Process control
Slide 22
HERVE
BARON
© 2013 – Hervé Baron
Emergency shut down
Slide 23
HERVE
BARON
© 2013 – Hervé Baron
Emergency relief
Slide 24
HERVE
BARON
© 2013 – Hervé Baron
Operating manual
Slide 25
HERVE
BARON
© 2013 – Hervé Baron
Project
Engineering
Instruments&
Control
Layout
& Piping
Process
Electrical
Equipment
Civil
Safety
Procurement
Construction
Slide 26
HERVE
BARON
© 2013 – Hervé Baron
Rotating machinery
Slide 27
HERVE
BARON
© 2013 – Hervé Baron
Pressure vessels
Slide 28
HERVE
BARON
© 2013 – Hervé Baron
Heat exchangers
Slide 29
HERVE
BARON
© 2013 – Hervé Baron
Packages,
Fired Equipment
Slide 30
HERVE
BARON
© 2013 – Hervé Baron
Process data
sheet
Mechanical
data sheet
Slide 31
HERVE
BARON
© 2013 – Hervé Baron
Material Requisition
Slide 32
HERVE
BARON
© 2013 – Hervé Baron
Slide 33
HERVE
BARON
© 2013 – Hervé Baron
Project
Engineering
Instruments&
Control
Layout
& Piping
Process
Electrical
Equipment
Civil
Safety
Procurement
Construction
Slide 34
HERVE
BARON
© 2013 – Hervé Baron
Slide 35
HERVE
BARON
© 2013 – Hervé Baron
Fire fighting
Slide 36
HERVE
BARON
© 2013 – Hervé Baron
Passive fire protection
Slide 37
HERVE
BARON
© 2013 – Hervé Baron
Fire & Gas detection layout
Slide 38
HERVE
BARON
© 2013 – Hervé Baron
Environmental Impact Assessment
Slide 39
HERVE
BARON
© 2013 – Hervé Baron
Project
Engineering
Instruments&
Control
Layout
& Piping
Process
Electrical
Equipment
Civil
Safety
Procurement
Construction
Slide 40
HERVE
BARON
© 2013 – Hervé Baron
Slide 41
HERVE
BARON
© 2013 – Hervé Baron
Slide 42
HERVE
BARON
© 2013 – Hervé Baron
Slide 43
HERVE
BARON
© 2013 – Hervé Baron
Slide 44
HERVE
BARON
© 2013 – Hervé Baron
Equipment supporting
structures
Slide 45
HERVE
BARON
© 2013 – Hervé Baron
Piping supporting
structures (pipe-racks)
Slide 46
HERVE
BARON
© 2013 – Hervé Baron
Structural design
Slide 47
HERVE
BARON
© 2013 – Hervé Baron
Slide 48
HERVE
BARON
© 2013 – Hervé Baron
Structural
drawings
Slide 49
HERVE
BARON
© 2013 – Hervé Baron
Slide 50
HERVE
BARON
© 2013 – Hervé Baron
Architectural drawings
Equipment layout
drawing
Slide 51
HERVE
BARON
© 2013 – Hervé Baron
Slide 52
HERVE
BARON
© 2013 – Hervé Baron
Project
Engineering
Instruments&
Control
Layout
& Piping
Process
Electrical
Equipment
Civil
Safety
Procurement
Construction
Slide 53
HERVE
BARON
© 2013 – Hervé Baron
Slide 54
HERVE
BARON
© 2013 – Hervé Baron
Layout/
principles
Slide 55
HERVE
BARON
© 2013 – Hervé Baron
Layout/consideration for all networks
Slide 56
HERVE
BARON
© 2013 – Hervé Baron
General Plot Plan
Slide 57
HERVE
BARON
© 2013 – Hervé Baron
Piping Layout
drawing
Slide 58
HERVE
BARON
© 2013 – Hervé Baron
3D modelling
Slide 59
HERVE
BARON
© 2013 – Hervé Baron
3D model review
3D model clash check
Slide 60
HERVE
BARON
© 2013 – Hervé Baron
Slide 61
HERVE
BARON
© 2013 – Hervé Baron
Piping Design
ANSI B31.8 (for gas pipelines and
compressor stations)
Slide 62
HERVE
BARON
© 2013 – Hervé Baron
Piping Design
ANSI B31.8 (for gas pipelines and
compressor stations)
Slide 63
HERVE
BARON
© 2013 – Hervé Baron
Thickness (mm) Number of passes
Slide 64
HERVE
BARON
© 2013 – Hervé Baron
Slide 65
HERVE
BARON
© 2013 – Hervé Baron
Slide 66
HERVE
BARON
© 2013 – Hervé Baron
Slide 67
HERVE
BARON
© 2013 – Hervé Baron
Slide 68
HERVE
BARON
© 2013 – Hervé Baron
Isometric drawing
Slide 69
HERVE
BARON
© 2013 – Hervé Baron
Piping Pre-fabrication
Slide 70
HERVE
BARON
© 2013 – Hervé Baron
Piping General
Arrangement drawing
Slide 71
HERVE
BARON
© 2013 – Hervé Baron
Slide 72
HERVE
BARON
© 2013 – Hervé Baron
Standard Pipe Support
drawings
Slide 73
HERVE
BARON
© 2013 – Hervé Baron
Slide 74
HERVE
BARON
© 2013 – Hervé Baron
Material Selection
Slide 75
HERVE
BARON
© 2013 – Hervé Baron
Material Specification
Slide 76
HERVE
BARON
© 2013 – Hervé Baron
Material Specification
Slide 77
HERVE
BARON
© 2013 – Hervé Baron
Project
Engineering
Instruments&
Control
Layout
& Piping
Process
Electrical
Equipment
Civil
Safety
Procurement
Construction
Slide 78
HERVE
BARON
© 2013 – Hervé Baron
Slide 79
HERVE
BARON
© 2013 – Hervé Baron
Instrument data sheet
Slide 80
HERVE
BARON
© 2013 – Hervé Baron
Process Control System
Slide 81
HERVE
BARON
© 2013 – Hervé Baron
System architecture
drawing
Slide 82
HERVE
BARON
© 2013 – Hervé Baron
Mechanical Equipment Control
Slide 83
HERVE
BARON
© 2013 – Hervé Baron
PT
JB
Process
line
Marshalling
cabinet
Controller
cabinet
Instrument room Control room
VDU
CPU
LAN
Secondary cable
Multi cable
The instrumentation hardware
Slide 84
HERVE
BARON
© 2013 – Hervé Baron
Building detail drawing/
Telecom and PAGA layout
Slide 85
HERVE
BARON
© 2013 – Hervé Baron
Cable routing drawings
Cable list
Slide 86
HERVE
BARON
© 2013 – Hervé Baron
Cable routing inside
technical room
Slide 87
HERVE
BARON
© 2013 – Hervé Baron
Project
Engineering
Instruments&
Control
Layout
& Piping
Process
Electrical
Equipment
Civil
Safety
Procurement
Construction
Slide 88
HERVE
BARON
© 2013 – Hervé Baron
Electrical consumer list
Slide 89
HERVE
BARON
© 2013 – Hervé Baron
Electrical Load
Summary
Slide 90
HERVE
BARON
© 2013 – Hervé Baron
Slide 91
HERVE
BARON
© 2013 – Hervé Baron
General One
Line Diagram
Slide 92
HERVE
BARON
© 2013 – Hervé Baron
Generators
Switchgear
Transformer
Single line diagram
Slide 93
HERVE
BARON
© 2013 – Hervé Baron
Electrical equipment layout
Slide 94
HERVE
BARON
© 2013 – Hervé Baron
Electrical
Control System
Slide 95
HERVE
BARON
© 2013 – Hervé Baron
Process design
PFDs
H&M balance
Slide 96
HERVE
BARON
© 2013 – Hervé Baron
Process design
PFDs
H&M balance
Rotating
Pressure vessels
Fired equipment
Heat exchangers
Packages etc.
Process
data sheet
Equipment specification
Slide 97
HERVE
BARON
© 2013 – Hervé Baron
Process design
PFDs
H&M balance
P&IDs
Slide 98
HERVE
BARON
© 2013 – Hervé Baron
Process design
PFDs
H&M balance
Rotating
Pressure vessels
Fired equipment
Heat exchangers
Packages etc.
P&IDs
Piping
Instrumentation
Layout
Civil
Electrical
Process
data sheet
Equipment specification
Vendor
drawings
Slide 99
HERVE
BARON
© 2013 – Hervé Baron
Process design
PFDs
H&M balance
Rotating
Pressure vessels
Fired equipment
Heat exchangers
Packages etc.
P&IDs
Piping
Instrumentation
Layout
Civil
Electrical
Process
data sheet
Equipment specification
Vendor
drawings
Slide 100
HERVE
BARON
© 2013 – Hervé Baron
Vendor
Instrumentation &
Control
Electrical
Layout
Civil
Piping
Process
Slide 101
HERVE
BARON
© 2013 – Hervé Baron
What
Engineering
designed
What the
Vendor
supplied
Slide 102
HERVE
BARON
© 2013 – Hervé Baron
Field Engineering
Slide 103
HERVE
BARON
© 2013 – Hervé Baron
A unique synthesis for the busy Project professional 200 pages, 250 illustrations
Interested and wanting to know more on Engineering?
Slide 104
HERVE
BARON
© 2013 – Hervé Baron
Project
Engineering
Procurement
Construction
Slide 105
HERVE
BARON
© 2013 – Hervé Baron
Procurement
Slide 106
HERVE
BARON
© 2013 – Hervé Baron
Inquiry (Call for Tender)
Short listing
Bid analysis
Clarifications
Negotiations
Purchase Order
Expediting
Inspection
Delivery
Warranty Period
Procurement / Steps
Slide 107
HERVE
BARON
© 2013 – Hervé Baron
Procurement / Supplier selection criteria
Technical Compliance
Price
Qualification of supplier
Schedule
Load of workshop
References
References with final Client
Financial situation
Annual turn-over
Internal feed-back
Slide 108
HERVE
BARON
© 2013 – Hervé Baron
Procurement
Slide 109
HERVE
BARON
© 2013 – Hervé Baron
Expediting
Slide 110
HERVE
BARON
© 2013 – Hervé Baron
Expediting
Slide 111
HERVE
BARON
© 2013 – Hervé Baron
Inspection
Slide 112
HERVE
BARON
© 2013 – Hervé Baron
Inspection
Slide 113
HERVE
BARON
© 2013 – Hervé Baron
Shipping
Slide 114
HERVE
BARON
© 2013 – Hervé Baron
Shipping
Slide 115
HERVE
BARON
© 2013 – Hervé Baron
Shipping
Slide 116
HERVE
BARON
© 2013 – Hervé Baron
Project
Engineering
Procurement
Construction
Slide 117
HERVE
BARON
© 2013 – Hervé Baron
Earthworks
Slide 118
HERVE
BARON
© 2013 – Hervé Baron
Pipeline
Slide 119
HERVE
BARON
© 2013 – Hervé Baron
Pipeline
Slide 120
HERVE
BARON
© 2013 – Hervé Baron
Roads
Slide 121
HERVE
BARON
© 2013 – Hervé Baron
Buildings
Slide 122
HERVE
BARON
© 2013 – Hervé Baron
Admixtures
Sand
Aggregate
Cement
Civil Works
Slide 123
HERVE
BARON
© 2013 – Hervé Baron
Civil Works
Slide 124
HERVE
BARON
© 2013 – Hervé Baron
Civil Works
Slide 125
HERVE
BARON
© 2013 – Hervé Baron
Civil Works
Slide 126
HERVE
BARON
© 2013 – Hervé Baron
Civil Works
Slide 127
HERVE
BARON
© 2013 – Hervé Baron
Civil Works
Slide 128
HERVE
BARON
© 2013 – Hervé Baron
Pre-fabrication
Slide 129
HERVE
BARON
© 2013 – Hervé Baron
Erection
Slide 130
HERVE
BARON
© 2013 – Hervé Baron
Underground networks
Slide 131
HERVE
BARON
© 2013 – Hervé Baron
Plant erection
Slide 132
HERVE
BARON
© 2013 – Hervé Baron
Steel structure erection
Slide 133
HERVE
BARON
© 2013 – Hervé Baron
Equipment installation
Slide 134
HERVE
BARON
© 2013 – Hervé Baron
Equipment installation
Slide 135
HERVE
BARON
© 2013 – Hervé Baron
Piping Pre-fabrication
Slide 136
HERVE
BARON
© 2013 – Hervé Baron
Piping erection
Slide 137
HERVE
BARON
© 2013 – Hervé Baron
Piping erection
Slide 138
HERVE
BARON
© 2013 – Hervé Baron
Field Instrumentation Installation
Slide 139
HERVE
BARON
© 2013 – Hervé Baron
Electrical equipment connection
Slide 140
HERVE
BARON
© 2013 – Hervé Baron
Cable pulling
Slide 141
HERVE
BARON
© 2013 – Hervé Baron
Arrangement of Technical rooms
Slide 142
HERVE
BARON
© 2013 – Hervé Baron
Cable connections
Slide 143
HERVE
BARON
© 2013 – Hervé Baron
Other Systems Field Equipment Installation
Slide 144
HERVE
BARON
© 2013 – Hervé Baron
Control room consoles installation
Slide 145
HERVE
BARON
© 2013 – Hervé Baron
Testing
Slide 146
HERVE
BARON
© 2013 – Hervé Baron
Sub-System
Junction
Box
Instrument
Loop
Instrument
Cable
Mech Equip
Document Folder
Handover System
Elect Equip Circuit
Instrument
Tag
Commissioning
Slide 147
HERVE
BARON
© 2013 – Hervé Baron
The multiple sides of a Project
Human Resources Management
Project Control
PROJECT
Slide 148
HERVE
BARON
© 2013 – Hervé Baron
Project Organisation
Project
Manager
Engineering
Manager
Project
Engineers
Discipline
Engineers
Process
Civil
Instrumentation
Electrical
Equipment
Procurement
Manager
Purchasers
Expediters
Inspectors
Site Manager Construction
Manager
Construction
Superintendent
Construction
supervisor
Construction
superintendent
Construction
supervisor
Project Control
Manager
Contract
Manager
Scheduling
Manager
Cost Control
Slide 149
HERVE
BARON
© 2013 – Hervé Baron
Project procedures
Slide 150
HERVE
BARON
© 2013 – Hervé Baron
Project temporary facilities
Slide 151
HERVE
BARON
© 2013 – Hervé Baron
Project temporary facilities
Slide 152
HERVE
BARON
© 2013 – Hervé Baron
Project temporary facilities
Slide 153
HERVE
BARON
© 2013 – Hervé Baron
Project temporary facilities
Slide 154
HERVE
BARON
© 2013 – Hervé Baron
Project temporary facilities
Slide 155
HERVE
BARON
© 2013 – Hervé Baron
Construction Procedures
Slide 156
HERVE
BARON
© 2013 – Hervé Baron
Slide 157
HERVE
BARON
© 2013 – Hervé Baron
Quality Control
Slide 158
HERVE
BARON
© 2013 – Hervé Baron
Slump
Sampling
Temperature
Quality Control
Slide 159
HERVE
BARON
© 2013 – Hervé Baron
Quality Control
Slide 160
HERVE
BARON
© 2013 – Hervé Baron
Cost Control
Slide 161
HERVE
BARON
© 2013 – Hervé Baron
Insurance
Slide 162
HERVE
BARON
© 2013 – Hervé Baron
Contracts
P.O.
Sub
P.O.
P.O.
Main Contract
Purchase
Orders
Sub-Contracts
EPC
Sub
Slide 163
HERVE
BARON
© 2013 – Hervé Baron
Contracts
Main Contract
EPC
Terms and
Conditions
Price
Schedule
Performance
guarantees
Technical
basis
Specifications,
codes & stds
Slide 164
HERVE
BARON
© 2013 – Hervé Baron
Contracts
E
Slide 165
HERVE
BARON
© 2013 – Hervé Baron
Contracts
E P
Slide 166
HERVE
BARON
© 2013 – Hervé Baron
Contracts
E P C
Slide 167
HERVE
BARON
© 2013 – Hervé Baron
Contracts
∑ + x%
Slide 168
HERVE
BARON
© 2013 – Hervé Baron
Construction contracts
Civil
Slide 169
HERVE
BARON
© 2013 – Hervé Baron
Construction contracts Mechanical
Slide 170
HERVE
BARON
© 2013 – Hervé Baron
Construction contracts
E&I
Slide 171
HERVE
BARON
© 2013 – Hervé Baron
Construction contracts General
Contractor
Slide 172
HERVE
BARON
© 2013 – Hervé Baron
Contracts
Terms and Conditions
Main Contract
EPC
Obligationsofthe2parties
Limitofliability
Penaltiesincaseofbadperformance
Conflictresolution
Slide 173
HERVE
BARON
© 2013 – Hervé Baron
Quality Assurance (QA)
Slide 174
HERVE
BARON
© 2013 – Hervé Baron
Quality Assurance (QA)
Slide 175
HERVE
BARON
© 2013 – Hervé Baron
Quality Assurance (QA)
Email vsTechnical Query
Email
Slide 176
HERVE
BARON
© 2013 – Hervé Baron
Quality Assurance (QA)
Unformal/Unrecoverable!
Formal/Recoverable!
Email
Email vsTechnical Query
Slide 177
HERVE
BARON
© 2013 – Hervé Baron
Quality Assurance (QA)
Unformal/Unrecoverable!
Formal/Recoverable!
Email
Email vsTechnical Query Think of somebody trying to find out
what was CPY decision in 3 years time...
Slide 178
HERVE
BARON
© 2013 – Hervé Baron
Quality Assurance (QA)
Slide 179
HERVE
BARON
© 2013 – Hervé Baron
Discipline code
A Instrumentation & Control
C Civil engineering
E Electrical
G Project general documents
J Mechanical
K Safety
M Piping & Layout
P Processes
S Steel Structures
V Vessels Heat exchangers
W Materials Welding
Document code
1 Installation drawings
2 Detail drawings
3 Diagrams
4 Lists Bill of Quantities
5 Isometrics
6 Calculation notes
7 Specifications
8 Data sheets
9 Requisitions
Document Control
Slide 180
HERVE
BARON
© 2013 – Hervé Baron
Document Control
Slide 181
HERVE
BARON
© 2013 – Hervé Baron
Document Control
Engineering
Documents
submitted
to client
Client
Approval/
Comments
Vendors
Documents
submissionComments
Slide 182
HERVE
BARON
© 2013 – Hervé Baron
Intranet /
Internet
Intranet /
Internet
Breakdown
structures
Projects
Interfaces
Reports
Satellite
Engineering
Center
Center 1 Sr.
Mgmt
Center 2 Sr.
Mgmt
Construction
Site
Electronic Document
Management System
Engineering
documents
Vendor
documents
Correspondence
etc.
Electronic Document Management System
Slide 183
HERVE
BARON
© 2013 – Hervé Baron
Interface Management
Slide 184
HERVE
BARON
© 2013 – Hervé Baron
7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 3334 35 36
PLANT START-UP
PIPING PRE-FABRICATION & INSTALLATIONX X X X X X X X X X
PIPING MATERIAL & DRAWINGS AT SITE
PIPING MATERIAL MANUFACTURING & SHIPPINGX X X X X X
PURCHASE OF PIPING MATERIAL
TECHNICAL & COMMERCIAL CLARIFICATIONS X X
CALL FOR TENDER FOR PIPING MATERIAL
PREPARE PIPING MATERIAL TAKE-OFF X
PIPING ROUTING STUDIESX X X
PIPING & INSTRUMENTATION DIAGRAMS (PIDs)
PROJECT SCHEDULE
MONTH
1
1
2
3
3
4
5
2
4
55
Scheduling
Slide 185
HERVE
BARON
© 2013 – Hervé Baron
Scheduling
Slide 186
HERVE
BARON
© 2013 – Hervé Baron
Progress Monitoring
How would you measure
progress?
Slide 187
HERVE
BARON
© 2013 – Hervé Baron
Progress Monitoring
Slide 188
HERVE
BARON
© 2013 – Hervé Baron
Progress Monitoring
Slide 189
HERVE
BARON
© 2013 – Hervé Baron
Progress Monitoring
Slide 190
HERVE
BARON
© 2013 – Hervé Baron
15 years ago: 2D
Today: 3D
Tomorrow:
3D & data
IT
Slide 191
HERVE
BARON
© 2013 – Hervé Baron
IT
Slide 192
HERVE
BARON
© 2013 – Hervé Baron
Safety
Slide 193
HERVE
BARON
© 2013 – Hervé Baron
Safety
Guard Rail System with Toe
Boards
Cross Bracing
Planking
Runner
Bearer
Longitudinal Brace
Post
Sill
Slide 194
HERVE
BARON
© 2013 – Hervé Baron
Safety
Slide 195
HERVE
BARON
© 2013 – Hervé Baron
Human resources / career path
3-5 yrs 5 yrs
Graduate Engineer, 25 years old
5-7 yrs
40-45 yrs old
Project Manager
Engineering Manager/
Deputy Project Manager
Project Engineer
Process Engineer
Note:the career pattern shown here is a very fast track one to the P M position... One would enjoy oneself just as well taking more time!
Slide 196
HERVE
BARON
© 2013 – Hervé Baron
Beyond this presentation
http://www.toblog.fr/en/baron.html HShare my
new developments
HFind my other
on-line
and
classroom training
Tags
Categories
General
Download
Download Slideshow
Get the original presentation file
Quick Actions
Embed
Share
Save
Print
Full
Report
Statistics
Views
55
Slides
184
Age
429 days
Related Slideshows
22
Pray For The Peace Of Jerusalem and You Will Prosper
RodolfoMoralesMarcuc
30 views
26
Don_t_Waste_Your_Life_God.....powerpoint
chalobrido8
32 views
31
VILLASUR_FACTORS_TO_CONSIDER_IN_PLATING_SALAD_10-13.pdf
JaiJai148317
30 views
14
Fertility awareness methods for women in the society
Isaiah47
28 views
35
Chapter 5 Arithmetic Functions Computer Organisation and Architecture
RitikSharma297999
26 views
5
syakira bhasa inggris (1) (1).pptx.......
ourcommunity56
28 views
View More in This Category
Embed Slideshow
Dimensions
Width (px)
Height (px)
Start Page
Which slide to start from (1-184)
Options
Auto-play slides
Show controls
Embed Code
Copy Code
Share Slideshow
Share on Social Media
Share on Facebook
Share on Twitter
Share on LinkedIn
Share via Email
Or copy link
Copy
Report Content
Reason for reporting
*
Select a reason...
Inappropriate content
Copyright violation
Spam or misleading
Offensive or hateful
Privacy violation
Other
Slide number
Leave blank if it applies to the entire slideshow
Additional details
*
Help us understand the problem better