Erection steps of ACW pumps1111111111.ppt

bharatfeb89 25 views 25 slides Jun 14, 2024
Slide 1
Slide 1 of 25
Slide 1
1
Slide 2
2
Slide 3
3
Slide 4
4
Slide 5
5
Slide 6
6
Slide 7
7
Slide 8
8
Slide 9
9
Slide 10
10
Slide 11
11
Slide 12
12
Slide 13
13
Slide 14
14
Slide 15
15
Slide 16
16
Slide 17
17
Slide 18
18
Slide 19
19
Slide 20
20
Slide 21
21
Slide 22
22
Slide 23
23
Slide 24
24
Slide 25
25

About This Presentation

1111


Slide Content

Presentation on erection of
CW & ACW pumps

Steps in erection of CW pump
Level the pump base on sole plate up to 0.05mm/mtr
accuracy by using spirit level.
Grout the assembly from pocket to top of sole plate
by GP-2 material.
Clean the contact surface of sole plate & pump base
by kerosene or thinner.
Inspect blue matching between contact surfaces of
sole plate & pump base up to 80% accuracy.
Inspect shafts(1-impeller shaft,3-Intermediates
shaft,1-Head shaft) run out up to 0.2mm accuracy
by using dial gauge.
Attach impeller with impeller shaft & tight the
impeller nut with lock washer.
Insert assembly into bell mouth.
Attach bowl on bell mouth with O ring and tight the
studs and nut.

Bell mouth
Bowl

Attach impeller shaft with split ring & muff coupling
to the first intermediate shaft.
Attach taper pipe with O ring to the assembly & tight
the studs and nut.
Attach second intermediate shaft to the previous
shaft with split ring & muff coupling.

Intermidiate shaft

Attach O ring,bearing spider,O ring &
column pipe to the previous assembly &
tight the nut bolts.
Attach next third intermediate
shaft(which is last intermediate
shaft)with split ring & muff coupling to
the previous shaft.

Coulmn pipe

Attach O ring,bearing spider,O
ring,discharge T to the previous
assembly & tight the nut bolts.

Discharge T

Attach fourth intermediate shaft with
split ring & muff coupling to the
previous shaft.
Attach O ring ,distance pipe to the
previous assembly & tight nut bolts.

Distance pipe

Insert gland housing & tight the bolts.
Insert asbestos gland rope in the cavity
between shaft & gland housing till
space remain 10mm from base of the
distance pipe.
Insert two piece plate in 10mm space.
Insert ring plate & tight the bolts.
Insert reflector plate.
Attach head shaft with split ring & muff
coupling.
Tight the reflector plate bellow muff
coupling.

Reflector plate
Intermidiate shaft bellow head shaft

Gland packingassembly

Holes for cooling water outlet from gland

Attach pump base to the previous assembly &
tight the nuts.
Attach thrust bearing on pump base & set the
tilted pad on runner plate.
Attach thrust collar guide,deflector,lock
washer,chuck nut & lock nut.
Measure remaining distance of shaft.
Lift whole assembly through head shaft &
measure distance called as lift of pump.
Set the whole assembly up to half of the lift
called as float of the pump,tight the lock nut.

Cooling pipe in thrust bearing

Insert the thrust bearing guide,cover
plate & tight nut bolts.

Thrust bearing guide

Thrust bearing cover

Thrust bearing housing

Attach motor stool to the previous
assembly.
Attach motor & couple it with head
shaft of pump up to accuracy of
0.2mm(axial & horizontal)by using dial
gauge.
Gap between these couplings should
not exceed 10mm.

Thrust bearing housing with base plate

Required tools & tackles
12/13 to 55/58 ring spanner/open end spanner.
6mm to 12mm Allen key’s
Screw driver 10"
Chissel 8"
Pipe wrench 18"
Adjustable spanner 12"
Wire rope –
2 Ton capacity & 1.5 mtr. length
4 Ton capacity & 2 mtr. Length
10 Ton capacity & 2 mtr. Length
15 Ton capacity & 3 mtr. Length
D Shukkle

Lubricants & cleaners
required for pump erection
Thinner-To clean the metallic contact surfaces.
Servo pride 40-For lubrication of muff coupling.
Servo pride 68-Use in thrust bearing.
Grease-Use in fitting of O rings & gland rope.
Asbesstos graphite gland rope of 22mm square.(3mtr
for one CW pump & 2 mtr for one ACW pump.
Emery stone.
Emery paper.