2. List of rates( Schedules of Rate)=>
Rates approved by government =>
One material rate fixation committee
in every district:
Chairman= CDO,
Members(LDO from DCC, One
Representative from
DCC,FNCCI
representatives,CAN
representative, Financial
Controller), and Member
Secretary = CDE
Note* : CDO= Chief District
Officer(1
st
Class Officer), LDO=
Local Development Officer(
2
nd
Class Officer), CDE= Chief
District Engineer (2
nd
Class
Officer), DCC= District
Coordination Committee,
CAN= Contractors Association
of Nepal
*Q. The chairman of material rate fixation
committee in district is:
a.CDO
b. LDO
c. NEA Chairman
d. SP
*Q. Who among the following is not the
member of District Material rate fixation
committee?
a. FNCCI representative
b. District Financial Controller
c. Nepal Engineers Association Member
d. CDO
3. Specification: General specification=>
it gives general idea of the work,
Detail Specification=> it gives detail
idea of work.
*Q. Which among the following is the legal
document used for contract?
a. General Specification
b. Detail Specification
c. Rate of Schedules
d. Fully Dimensioned drawing
*Q. Which among the following is the legal
document used for contract?
a. Specification
b. Schedules rate
c. Construction schedules
d. Estimate of cost
4. Updated modes of
measurement(Deduction/Addition)=
> Standard mothod of
measurement:NS-389-254, IS-1200-
1965
5. Standard Circulars:( Taxes,
Insurance)=> These Policies changes
from time to time
Principles of unit of measurement: It mainly
depends upon shape, size, nature of work,
i.e.
i. Mass, voluminous, thick work =>
m
3
(eg. E/W, B/W)
ii. Shallow, Surface, thin work =>
m
2
(eg. Plastering, Painting)
iii. Long and thin work => running
meter (r.m. or m), eg. pipe work,
lighting conductor
iv. Piece Work=> numbers(nos.) , eg.
wall fan fitting, tube light bulb
fitting etc.
Note: Surface /Shallow excavation means:
<30cm depth & length >1.5m excavation
(PSC=Er./S-Er./Asst.S-Er)