STUDY, DESIGN & DEVELOPMENT OF AUTOMATIC WET TISSUE PAPER PACKING MACHINE. Final year engineering project ppt.


Slide Content

PES’S MODERN COLLEGE OF ENGINEERING DEPARTMENT OF MECHANICAL ENGINEERING FINAL YEAR PROJECT GROUP 12 PROJECT PROPOSED BY : Akshay shinde 43289 Sanjeev Sutar 43290 Yogesh Vagre 43292

INDEX SR.NO TOPIC 1 PROPOSED TITLE & SPONSORING COMPANY 2 LITERATURE SURVEY 3 NEED OF THE PROJECT 4 PROBLEM DEFINITION 5 OBJECTIVE 6 SCOPE OF THE PROJECT 7 WORKING 8 SCHEDULE FOR COMPLETION 9 Conclusion

PROPOSED TITLE: STUDY, DESIGN & DEVELOPMENT OF AUTOMATIC WET TISSUE PAPER PACKING MACHIN SPONSORING COMPANY: JKC Automobile Engineering

LITERATURE SURVEY : Industrial Survey :- Research Papers :-

PROBLEM DEFINITION: Currently in many small packaging company packing of wet tissue paper is done by semi automatic machines. Our aim is to design a machine that will automated tissue paper packaging process in order to increase efficiency of their operation.

OBJECTIVE Increase the production rate by atomization , maintaining production with minimum errors

SCOPE OF THIS PROJECT Our project is based on a Mechatronics system. The research shall entail study of: Mechanical Components such as S hafts and Bearings. Electronic Components such as Sensors & Microcontroller. The Study of the following subjects covered for the completion of the project Mechatronics Design of Machine Elements Manufacturing Processes CAD/CAM and Automation Dynamics of Machinery

WORKING : Main structure adopts full servo control Opens the roll of raw material & tension control automatically Chemical sprinkler system Adopt double folding & double packaging system the packaging film punches & labelling automatically The stacking pieces & the position of packing film’s punching & labelling can be set on touch screen

SCHEDULE FOR COMPLETION Task Month of Completion Problem identification and requirement. August Problem modeling September System analysis and specifications August-September Design(CAD) September-October Virtual Testing(Software and analytical) October Module implementation and integration November-December-January System test and evaluation January-February Documentation and management February-March

CONCLUSION The concept borders on innovation and will bring Exemplary Change in the Test Facility in terms of: High Production rate Time efficient