Fishpond and It’s Compartments T.L.E 8- AQUACULTURE
Fishpond - is an artificial body of water surrounded by dikes and with accessories such as gates, pipes and canals to facilitate water supply management. T.L.E 8- AQUACULTURE
T.L.E 8- AQUACULTURE
Layout - is the plan or design of something laid out. T.L.E 8- AQUACULTURE
Different Compartment Units of Fishpond T.L.E 8- AQUACULTURE NP - Nursery Pond MD - Main Dike TP - Transition Pond SD - Secondary Dike RP - Rearing Pond TD - Tertiary Dike HP - Head Pond MG -Main Gate BP - Breeding Pond SG - Secondary Gate CP - Catching Pond TG - Tertiary Gate WSC - Water Supply Canal
1. Nursery Pond (NP) - is the smallest and the cleanest compartment where fish are reared from fry up to pre-fingerling size. 2.Transition Pond (TP) - is a compartment where fish are reared from pre-fingerling size to post fingerling size before stocking them into other larger compartments. T.L.E 8- AQUACULTURE
3. Rearing pond (RP) - is the larger compartments of a fishpond where fishes are reared from post fingerlings up to marketable size. 4. Breeding Pond (BP) - is a compartment where breeder are confined and are used purposely for the production of fry. T.L.E 8- AQUACULTURE
5. Catching Pond (CP) - is an area that serves as catchment basin for fish harvest. 6. Head Pond (HP) - is used for storing reserve water. 7. Water Supply Canal (WSC)- is used for supplying water to the different compartments T.L.E 8- AQUACULTURE
T.L.E 8- AQUACULTURE
Kinds of Dikes 1. Main dike - is the largest of all dikes that surrounds the whole fishpond project. T.L.E 8- AQUACULTURE
Kinds of Dikes 2. Secondary dike - subdivides the pond system into several compartments with or without basal foundation and puddle trench. T.L.E 8- AQUACULTURE
Kinds of Dikes 3. Tertiary dike - is the dike that surrounds the smallest compartment. T.L.E 8- AQUACULTURE