Cost Analysis of establishing Fuel Station
Size: 57.22 KB
Language: en
Added: Oct 14, 2025
Slides: 8 pages
Slide Content
Fuel Station Development: Civil & Structural Works Cost Analysis Stepping into sustainable business growth
Element Content Notes/Design Title Project Cost Analysis: Civil & Structural Works Use a clear, professional font. Subtitle Detailed Breakdown for a Small-to-Mid Sized Fuel Station (Bangladesh, 2025) Include a small icon of a fuel pump or construction. Key Takeaway Grand Total (Civil & Structural): ৳33 Lakh (≈ $30,000 USD) - Highlight this number prominently. Presenter [Your Name/Company Name] Date: [Current Date] Title & Overview
Element Content Notes/Design Title Total Investment Snapshot Use a bar chart or pie chart to visualize the allocation. Table Item Subtotal (BDT) Analysis Key Insight: Site Civil Works is the largest cost driver (36.4), primarily due to the Foundation and expensive Driveway/Pavement requirements. Grand Total & Segment Allocation
Element Content Notes/Design Title Deep Dive: Site Civil Works (৳12.0 lakh) Use a small icon for construction/roadwork. Key Components (with Cost) 1. Foundation for Tank & Dispensers: ৳4.0 lakh (33.3%) - Critical safety and stability element (RCC Base, Rebar). 2. Driveway & Pavement: ৳3.0 lakh (25.0%) - Requires durable RCC/Asphalt for heavy vehicle loads. 3. Boundary Wall / Fencing: ৳2.0 lakh (16.7%) - Essential for security and property demarcation. Highlight Foundation as the single biggest line item within this segment. Goal This component ensures Structural Integrity (foundations) and Operational Flow (driveways, drainage). Major Cost Component 1 – Site Civil Works
Element Content Notes/Design Title Deep Dive: Dispenser Canopy (৳10.0 lakh) Use a small icon for shelter/steel. Key Components (with Cost) 1. Steel Frame Structure: ৳4.0 lakh (40.0%) - Highest expense due to fabrication, columns, and beams. 2. Painting & Branding: ৳2.0 lakh (20.0%) - High cost reflects the need for durable, weatherproof paint and visible corporate signage. 3. Roofing Sheets: ৳1.5 lakh 4. Lighting Fixtures: ৳1.5 lakh Use an image of a well-lit, branded canopy. Note The canopy is the most visible part of the station and is critical for weather protection and branding. Major Cost Component 2 – Dispenser Canopy
Element Content Notes/Design Title Electrical & Utilities (৳5 lakh + ৳6 lakh = ৳11.0 lakh) Grouping the smaller segments for comparison. Electrical & Control Systems (৳5.0 lakh) - MDB (Main Distribution Board): ৳1.5 lakh (Highest within Electrical) - Explosion-Proof Wiring & Cabling: ৳1.0 lakh (Mandatory safety requirement) - Grounding & Lightning Protection: ৳0.5 lakh (Essential safety item) Emphasize Explosion-Proof and Grounding as non-negotiable safety costs. Office/Control Room & Utilities (৳6.0 lakh) - Office Building Construction: ৳2.5 lakh (Highest within Utilities) - Furniture, Fixtures, and A/C: ৳2.0 lakh (Operational readiness) The office is the commercial and management hub. Supporting Systems & Utilities
Element Content Notes/Design Title Cost Drivers and Contingency Use a bold '⚠️' icon. Cost Basis Costs are derived from Bangladesh 2025 average market rates for mid-range quality materials. Reinforce that this is a baseline. Uplift Scenarios 1. Premium Finishes: Selecting imported roofing, higher-grade electrical systems, etc., can increase the Grand Total by 20–25%. Action: Requires clear material specifications. Scaling for Size 2. Larger Station Scale (15,000–20,000 L): For larger plots, the total cost for this segment could increase by 30–40% due to bigger canopies, more pavement, and larger offices. Action: Must be factored in based on final site plan. Project Caveats and Cost Flexibility
Element Content Notes/Design Title Conclusion and Recommendation Use a checkmark or 'target' icon. Summary Overall Project Cost: ৳33.0 lakh Highest Cost Area: Site Civil Works (৳12.0 lakh) - Focus on foundation and pavement material selection. Safety Priority: Electrical systems require Explosion-Proof and Grounding components, which are high-value, non-negotiable costs. Reiterate the most important findings. Next Steps 1. Detailed Engineering Drawings: Finalize precise layout and material specifications. 2. Procurement Strategy: Secure quotes for key high-cost items (Steel, Concrete/Asphalt). 3. Contingency: Allocate an additional 10% to the budget for unforeseen costs. Provide clear, actionable items. Summary & Next Steps