Full Project ministry of public work and Transportation
abdibeder
12 views
60 slides
Sep 23, 2024
Slide 1 of 60
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
37
38
39
40
41
42
43
44
45
46
47
48
49
50
51
52
53
54
55
56
57
58
59
60
About This Presentation
Full Project ministry of public work and Transportation
Size: 31.04 MB
Language: en
Added: Sep 23, 2024
Slides: 60 pages
Slide Content
SUPERVISOR: ENG ABDIRAHMAN BADAR MUUSE GOLLIS UNIVERSITY, BURAO CAMPUS “Gollis University Empowers its Students as Professional Leaders Committed to Make a Positive Difference “ ” PROJECT :-MINISTRY OF PUBLIC WORK
S. NO : Student names ID. NO: 1 Abdikariin saleebaan haariye GUB/B08/CIV/012 2 Hamse abdi yuusuf GUB/B08/CIV/007 3 Farxaan axmed daahir GUB/B08/CIV/010 Group members
CH.1:INTRODUCTION Ministry of Public Works and Transport Somaliland, Ministry of Public works, Land and Housing is responsible for public works, land affairs and housing projects. Background of the project The Ministry accomplishes its various functions with due regard for Government’s policies and strategic directions. The Ministry recognized that infrastructure and housing are fundamental to development and the achievement of the social goals of Government.
Main Objective The Ministry of Public Works and Housing is one of the Government institutions responsible for undertaking infrastructure projects. The Ministry is mandated to undertake the plan, design and construction of government buildings, infrastructure, such as national roads and bridges, flood control, water resources projects and other public works; and to promote standards in the construction and housing industries. To respond to emerging challenges and to ensure quality service delivery to the public, the Ministry subscribes to the following core values: 1. Teamwork 2. Responsiveness 3. Integrity
An architectural drawing is a technical drawing of a building that falls within the definition of architecture . autocad drawings shows floor plan. While archicad pictures shows all elevation of the building. CH.2: ARCHITECTURAL DRAWING AND PLANS
Site plan
Ground floor
First floor
Top floor
Section A-A
Elevation A-A
Section B-B
Elevation B-B
Footing plan
Column layout
Beam design layout
Excavation plan
Footing Column and Excavation Plan
Water plan
Sewage plan
Electricity plan
Air condition
Doors and windows
Beam, column and slab taken plan
Doors schedule NO Description QTY Length Height drawing 1 Revolved door 2 5 2.5 2 Imported door 6 2 2.2 3 Imported door 18 1.2 2.2 4 Imported door 10 0.8 2 DOORS
Windows schedule NO Description QTY Length Height drawing 1 Aluminum window 37 0.6 4.2 2 Aluminum window 7 0.4 0.4
Perspective view
Front view
Right view
Left view
Back view
Top view
Front of ministry public work .
Front of ministry.
Front of ministry of vehicle.
Front of ministry of vehicle.
Live load: 3kN/m2 at typical floor Location: Burao Depth of foundation below the ground: 1.2 Type of soil: rocky sand Allowable bearing capacity: 200kN/m2 Story height: 3.2m Floors: G+1 Walls: 200mm hallow block CH.3: STRUCTURAL DESIGN
Item Description NO Diameter Ø Spacing ( MM ) 1. Slabs 1.1 Mid span X_direction Ø 10 200mm Y_ direction Ø 12 200mm 1.2 Extra bars X_Direction Ø 12 200mm Y_direction Ø 12 200mm 2) Beam 2.1 Main bars of the beam 6 Ø 20 2.2 Hungers 2 Ø 16 2.3 Stirrups Ø 10 200mm 3) Column 3.1 Column bars 6 Ø 16 3.2 Ties Ø 6 250mm Bar schedule
4) Footing 4.1 Main bars of the footing 4.2 X_direction 9 Ø 20 315mm 4.3 Y_direction 9 Ø 20 315mm 5) Ground beam 5.1 Main bars 6 Ø 16 5.2 Hungers 2 Ø 10 5.3 Shear bars 2 Ø 12 200mm 6) Staircase 6.1 Main bars 6 Ø 20 6.2 Distribution bars Ø 12 200mm 6.3 Extra bars 5 Ø 20 CONT……
Design of slab
Design of slab
Design of beam
Design of column
Design of ground beam
Design of footing
Design of staircase
The process of selecting suitable ingredients of concrete and determining their relative amounts of the required, strength, durability, and workability as economically as possible, is termed the concrete mix design. CH.4: CONCRETE MIX DESIGN
Mixing design. Type OPC Grade 20 Compacting factor = 0.7 Degree of quality control is good TEST DATA FOR MATERIALS SUPPLIED mixing design
M20 concrete mix has a mix proportion of 1:1.5:3 Cement, [ 1] Sand , [1.5] Aggregate ,[ 3] Ratio of concrete
In short specification is a statement of particular instructions of how to execute some task. The specifications should clearly specify: - Design and drawing Labor employment Materials to be used Construction method Equipment used CH.5: SPECIFICATIONS
CH.6: COST ESTIMATION Project Cost estimation is the process of valuing on monetary expression, including the Cost of all possible entrants necessary for the planning, implementing and monitoring Stages of the proposed project under consideration. The possible entrants are: Preliminary investigation (project appraisal costs) Design and supervision (consultancy cost) Construction works (contractor’s cost) Land owning cost, and Monitoring costs
Grand total of the project FENCE $15,808.48 GROUND FLOOR $193,128.00 FIRST FLOOR $78,348.96 STORE BUILDING $24,228.99 COFFEE SHOP $28,493.10 PARKING AND LANDCAPE $10,800 TOTAL $350,807.53
CHAPTER 7:SCHEDULE This chapter we will discuss the construction time and how work will continue. This construction will continue 1.2years, as you will see the
Contract is a written agreement between or among two or more parties that outlines the terms and conditions of a specific relationship. This contract agreement was between Xamse cabdi yuusuf ( owner of building ) and Cabdikariin saleebaan haariye( owner of aflax construction co. ) CH.8: CONTRACT AND CONTRACT AGREEMENT
Procurement Reference This agreement made Saturday of 1 august 2024 between Abdikariin saleebaan haariye of Burao Somaliland of the one part, and xamse abdi yuusuf of Burao Somaliland of the other part: Whereas the Employer is desirous that the Contractor execute Large ministry of public work building and the Employer has accepted the Bid by the Contractor for the execution and completion of such Works and the remedying of any defects therein for the Contract Price of the equivalent of $ $350,807.53 US Dollar CONTRACT AGREEMENT
CONCLUSION Our project is ministry of public work Building. The total of the building is 96mx40m. All details that are needed in our building are clarified in our drawings. Views both 2D and 3D are also mentioned. All analysis and design in our project is done by hand calculation. Frames of our building such as beam, column, slab, foundation and staircase are designed and checked for their safety and finally our structure is safe. The bill of quantity of our structure is done by using the Somaliland local unit price.
REFERENCES 1.Design of Reinforced Concrete Structures (P.DAYARATNAM) Third Edition Is: 456-2000 IS: 456-1978 design AIDS for reinforced concrete IS: 875(part2)1987 design loads IS: 875(part1)1987 design loads Http://www.civilengineering.com Http:// www.Google.com 2.Design of reinforced Concrete (Jack C. McCORMACK, RUSSELL H. BROWN) Ninth edition ACI 318-11 Code Edition. ISBN: 978-1-118-12984-5 ISBN: 978-1-118-43081-1(BRV) Printed in USA Http:// www.Google.com
3. Boulton.G and Lucas.C (2011). What Are Universities For? https://www.researchgate.net/publication/225511003_What_Are_Universities_For 4. Trystan S. Goetze. ( 2019 ). the concept of a university: theory, practice, and society. https://eprints.whiterose.ac.uk/143833/3/The%20concept%20of%20a%20university%2C%20final%20version.pdf 5. Overview of Higher Education https://www.jica.go.jp/jica-ri/IFIC_and_JBICI-Studies/english/publications/reports/study/topical/approaches/pdf/higher_02.pdf 6. whitehead.A.N. ( 1927 ).Universities and Their Function http://la.utexas.edu/users/hcleaver/330T/350kPEEwhiteheadunivfxtable.pdf CONT…