GCS-KSA CORS Project-Phase 1
Progress Report
August 24, 2016
1

•Key Activities Achieved in the Last Week
•On-Going Activities within Current Week
•NCC & IT Related Issues
•Discussion Points
Agenda
2

KSA CORS Reference Stations
Progress

4
Key Activities Achieved in the Last Week
•Cabinet cooling reconfiguration in RY88, RY94, RY95 by covering the
cabinet with Heat insulation material.
•Installation of new power detector in RY06 and RY99.
•SEC power meter installation in AS03.
On-Going Activities within Current Week
•Cabinet cooling reconfiguration using sun shade at RY84.
•Power installation in AS03 and site configuration.
•SEC joint site visit in RY01.
•Power application follow-up for all sites under Eastern region-ES01, ES02,
ES04, ES05, ES06, ES07, ES08.

NCC & IT Related Issues

6
NCC & IT Related Issues
Item Action Required
Initiation
Date
Target
Date
Owner
1-NTRIP
Caster
RTO ports between NTRIP
(192.168.4.14) and VRSNet01
(10.0.22.101) seems blocked 55001 and
55002 Trimble engineer is investigating
the issue
14-Jul-
2016
GCS-IT
2- Alarm
Application
Debugging with supplier, Engineer will
start troubleshooting on 24-Aug
Apr-2016
31-Aug-
2016
NovaSat
3- Updated
Contract file
Trimble Engineer will do it during this
visit
31-Aug NovaSat
4- Disaster
Recovery
Data life cycle sent and request the
disaster recovery
31-Jul GCS-IT

7
NCC & IT Related Issues (Continued)
Item Action Required
Initiation
Date
Target
Date
Owner
5- Users
Accounts
Users Accounts for NCC Operators
1-Aug-
2016
GCS-IT
6- NCC As-
Built
To provide models and SN for NCC
hardware for NCC PAT
26-Jul-
2016
GCS-IT
7- SNMP
Configuration
GCS-IT request to configure SNMP V3
on Gateway routers, Engineer will visit
GCS for this task
10-Aug-
2016
Aug-2016NovaSat

Discussion Points

9
Discussion Points
•Review of documents
•Feedback on processing strategy document.
•NJ05 Access permission
•Feedback from SEC for grid power
•Cabinets temperature issue
•Report of problem and solution will be provided by NOVAsat.
•Status of user accounts of NCC operators

Thank You