High Rise Projects by WS - Final VICTOR.pdf

ngTho85 25 views 11 slides Jun 06, 2024
Slide 1
Slide 1 of 11
Slide 1
1
Slide 2
2
Slide 3
3
Slide 4
4
Slide 5
5
Slide 6
6
Slide 7
7
Slide 8
8
Slide 9
9
Slide 10
10
Slide 11
11

About This Presentation

High Rise Projects by WS


Slide Content

HAVE BEEN DESIGNED, MANUFACTURED AND DELIVERED
HIGH-RISE STEEL STRUCTURE PROJECTS
BY WORLD STEEL
WWW.WORLDSTEELGROUP.COM

DESIGN PROCESS STANDARDS & DESIGN SOFTWARES
DESIGN & MANUFACTURING STANDARDSDESIGN SOFTWARES
During the design process, 
latest softwares  such as SAP, 
Staadpro, Etabs, Autocad, 
Tekla,… are applied.
WORLDSTEEL GROUP currently adheres to the following 
American standards. However, we can design according to 
the specific requirements of our clients, including American, 
European, Japanese, or Vietnamese standards (TCVN). 
01. ARCHITECT DRAWING
Receive client’s required information such as architect drawing, 
location, load,… to propose solutions that are suitable for the 
client’s budget.
02. DESIGN AND CALCULATION
Engineering experts offer optimal design solutions that meet the 
original architect requirement and comply with the standard code.
03. APPROVAL DRAWING
Submit to client the APD Drawing including: Anchor Bolts Plan, 
Cross Section, Sidewall & end wall elevation and connection detail, 
to help client check with the architect and approve.
04. BIM MODEL DESIGN
Build 3D models to double check the architecture and structures, 
make sure there are no technical issues before releasing fabrication 
drawings.
05. SHOP DRAWING
Implement and issue detailed shop drawings for the project
06. ERECTION DRAWING
The erection drawing is shown with Marked Part Number of all 
Steel Components to avoid the mistakes in the erection stage. 
The Erection Department cross - check the drawings and erection 
solution during the fabrication stage.
07. AS-BUILT DRAWING
After completing all stages of construction and erection, the 
Engineering team will make as-built drawings for the project 
based on the design control process and actual construction at 
the construction site.
AISI S100-2020: North American Specification
for the Design of Cold-Formed Steel Structural
MBMA 2018 Metal 
Building Systems Manual
AWS D1.1/D1.1M: 2020
 Structural.Welding Code-Steel
ASCE/SEI 7-22: Minimum
Design - Loads for Buildings
AISC 360-22 
Specification - Structural
IBC 2024 International
Building code

TIEN GIANG TONGWEI
FACTORY
Client
TONGWEI GROUP
EPC contractor
WORLDSTEEL GROUP
Field
AGRICULTURE
Area
33,000M²
Location
LONG GIANG INDUSTRIAL PARK, TIEN GIANG PROVINCE
TYPICAL PROJECTS TYPICAL PROJECTS
TONGWEI Group is the number one Chinese company in the 
field of manufacturing aquatic food. The group has more than 
110 subsidiaries, distributed throughout China and Southeast 
Asia. Tien Giang Tongwei is a large-scale project located in 
the southwestern key point, after completion, the factory will 
provide aquatic food for the entire Southwestern region. 
WORLDSTEEL GROUP takes on the role of EPC contractor 
for this project.
HIGH-RISE STEEL STRUCTURE PROJECTS
Scan the QR Code
to watch the project video

HIGH-RISE STEEL STRUCTURE PROJECTS
Project name
HAI DUONG TONGWEI
Location
LAI CACH INDUSTRIAL ZONE - HAI DUONG PROVINCE
Field

AGRICULTURE
EPC contractor
WORLDSTEEL GROUP
TYPICAL PROJECTS TYPICAL PROJECTS HAI DUONG TONGWEI
After the success of the Tien Giang TongWei project, WORLD 
STEEL was trusted by the investor TONGWEI group, continuing 
to undertake the Hai Duong TongWei project. This is a key project 
in the North, after completion, the factory will provide aquatic 
food for the whole Northern region. WORLD STEEL is the EPC 
contractor of the Hai Duong Tongwei project.
FACTORY
Scan the QR Code
to watch the project video

SHENG LONG AQUATIC FOOD
FACTORY
Client
TONGWEI GROUP
EPC contractor
WORLDSTEEL GROUP
Field
AGRICULTURE
Area
33,000M²
Location
LONG GIANG INDUSTRIAL PARK, TIEN GIANG PROVINCE
TYPICAL PROJECTS TYPICAL PROJECTS
Sheng Long aquatic food factory project is one of the 
large-scale production factory projects, built on an area of 
52,000m
2
, located in Cong Hoa Industrial Park, Chi Linh, Hai 
Duong. WorldSteel Group assumes the role of project EPC 
contractor, implementing the entire project with large items 
such as: raw material warehouses A1+A2, finished product 
warehouse, packaging warehouse, office building, parking 
lot,...
HIGH-RISE STEEL STRUCTURE PROJECTS
Scan the QR Code
to watch the project video

Project name
VINH LONG HAI DAI AQUATIC FEED FACTORY
Location
HOA PHU INDUSTRIAL PARK, LONG HO DISTRICT,
VINH LONG PROVINCE
Area
20,000M²
Field
AGRICULTURE
Project EPC contractor
WORLDSTEEL GROUP
 
HIGH-RISE STEEL STRUCTURE PROJECTS
TYPICAL PROJECTS TYPICAL PROJECTS
VINH LONG HAI DAI
FACTORY
Vinh Long Hai Dai aquatic feed factory officially held 
a groundbreaking ceremony on August 16, 2023. 
With a total area of 20,000m² , total capacity of 
200,000 tons per year. Once completed, the factory 
will provide a full range of high quality products to 
farmers in the Western market - a key seafood region 
of Viet Nam.

Investor
WORLDSTEEL GROUP
Field
OFFICE BUILDINGS
Location
HAI SON INDUSTRIAL PARK (PHASE 3+4),
DUC HOA HA COMMUNE, DUC HOA DISTRICT,
LONG AN PROVINCE
EPC Contractor
WORLDSTEEL GROUP
HIGH-RISE STEEL STRUCTURE PROJECTS
OFFICE BUILDING
PROJECT IN LONG AN WORLDSTEEL GROUP
WorldSteel Group office building was built in Duc Hoa, Long 
An with a scale of 6 floors with a floor area of nearly 2000m² , 
designed in a modern open space.
The project uses high-quality structural steel products 
designed, manufactured and constructed by World Steel's 
own team.
TYPICAL PROJECTS TYPICAL PROJECTS
Scan the QR Code
to watch the project video

Project name
WORLDSTEEL GROUP OFFICE - HCMC
Location
PHU THO HOA WARD - TAN PHU - HCMC
Field
MID-RISE BUILDINGS
Project EPC contractor
WORLDSTEEL GROUP
WORLDSTEEL GROUP
OFFICE - HCMC
TYPICAL PROJECTS TYPICAL PROJECTS
HIGH-RISE STEEL STRUCTURE PROJECTS
Scan the QR Code
to watch the project video

Project name
NAM LONG WAREHOUSE
Location
LONG HAU INDUSTRIAL PARK, CAN GIUOC DISTRICT, LONG AN PROVINCE
Investor
NAM LONG TRADING AND SERVICE COMPANY LIMITED
Project EPC contractor
WORLDSTEEL GROUP
NAM LONG
WAREHOUSE
TYPICAL PROJECTS TYPICAL PROJECTS
HIGH-RISE STEEL STRUCTURE PROJECTS
Nam Long project is a cooperation between WORLD STEEL Construction 
Joint Stock Company and Nam Long and Trading Service Company Limited. 
The project's purpose is a factory area for rent, built with steel structure for 
the main workshop along with office blocks and other auxiliary items. 
Scan the QR Code
to watch the project video

Investor
HAI TRUNG FURNITURE CO., LTD
Field

EXHIBITION HOUSE
Scope of work
DESIGN, MANUFACTURE AND ERECTION
Location
HUU DINH COMMUNE, CHAU THANH DISTRICT, BEN TRE PROVINCE

TYPICAL PROJECTS TYPICAL PROJECTS
HIGH-RISE STEEL STRUCTURE PROJECTS
BEN TRE EXHIBITION HOUSE

WORLD STEEL CONSTRUCTION JOINT STOCK COMPANY
Head Office: No.55, Le Thuc Hoach St., Phu Tho Hoa Ward, Tan Phu Dist., HCM City, Viet Nam 
Factory: Lot Q9-10-15-16, St. No.7, Hai Son Industrial Park (Phase 3+4),
Duc Hoa Ha Commune, Duc Hoa District, Long An Province, Viet Nam
Manila Office Address: Unit 1828 - Tower B - Solemare Parksuites, Lot 5A, Bradco Avenue, 
Aseana Business Park, Barangay Tambo, Paranaque City, Philippines
Cebu Office Address: Unit SV2022 Sunvida Tower Across SM City, North Reclamation Area, 
Cebu City, Philippines
World Steel in the U.S: 7302 Emerson Ave, Westminster, CA 92683, USA 
Email: [email protected]    -  Website: www.worldsteelgroup.com
Hotline: (+84) 28 6293 6666  -  Project Hotline: (+84) 939 355 789
Facebook
中文 TING VIT
YoutubeLinkedin
WORLDSTEEL GROUP 'S OFFICIAL CHANNELSONLINE BROCHURE
Website
MR. THAO DANG (VICTOR)
INTERNATIONAL SALES & MARKETING DIRECTOR
Email:
[email protected]
Hotline: +84 902 881 833 (WhatsApp/ Viber/ Telegram/ Line/ Zalo)
Linkedin: https://www.linkedin.com/in/dangvictor/
Tags