High-speed rail line through the Alps-Europe

ferdous1973eng 6 views 85 slides Sep 17, 2024
Slide 1
Slide 1 of 85
Slide 1
1
Slide 2
2
Slide 3
3
Slide 4
4
Slide 5
5
Slide 6
6
Slide 7
7
Slide 8
8
Slide 9
9
Slide 10
10
Slide 11
11
Slide 12
12
Slide 13
13
Slide 14
14
Slide 15
15
Slide 16
16
Slide 17
17
Slide 18
18
Slide 19
19
Slide 20
20
Slide 21
21
Slide 22
22
Slide 23
23
Slide 24
24
Slide 25
25
Slide 26
26
Slide 27
27
Slide 28
28
Slide 29
29
Slide 30
30
Slide 31
31
Slide 32
32
Slide 33
33
Slide 34
34
Slide 35
35
Slide 36
36
Slide 37
37
Slide 38
38
Slide 39
39
Slide 40
40
Slide 41
41
Slide 42
42
Slide 43
43
Slide 44
44
Slide 45
45
Slide 46
46
Slide 47
47
Slide 48
48
Slide 49
49
Slide 50
50
Slide 51
51
Slide 52
52
Slide 53
53
Slide 54
54
Slide 55
55
Slide 56
56
Slide 57
57
Slide 58
58
Slide 59
59
Slide 60
60
Slide 61
61
Slide 62
62
Slide 63
63
Slide 64
64
Slide 65
65
Slide 66
66
Slide 67
67
Slide 68
68
Slide 69
69
Slide 70
70
Slide 71
71
Slide 72
72
Slide 73
73
Slide 74
74
Slide 75
75
Slide 76
76
Slide 77
77
Slide 78
78
Slide 79
79
Slide 80
80
Slide 81
81
Slide 82
82
Slide 83
83
Slide 84
84
Slide 85
85

About This Presentation

Tunnel


Slide Content

SEMINAR ON PRACTICAL TUNNEL DESIGN AND CONSTRUCTION 26/06/06
Gotthard Base Tunnel:
High-Speed Rail Line Through the Alps
presented by: presented by:
Michael Rehbock, Michael Rehbock, M. Sc. Mining EngineerM. Sc. Mining Engineer
Member of the Board, Member of the Board,
Head of Tunnelling Department Amberg Head of Tunnelling Department Amberg
Engineering Ltd., Regensdorf, SwitzerlandEngineering Ltd., Regensdorf, Switzerland
SEMINAR ON PRACTICAL TUNNEL DESIGN AND
CONSTRUCTION

SEMINAR ON PRACTICAL TUNNEL DESIGN AND CONSTRUCTION 26/06/06
Content
1. Project overview
4. Excavation in fault zone Sedrun
2. State of the works
3. TBM excavation with open gripper TBM
5. Special planning aspects
Special geotechnical aspects, experience from the
site  Rolf Stadelmann

SEMINAR ON PRACTICAL TUNNEL DESIGN AND CONSTRUCTION 26/06/06
Content
1. Project overview
4. Excavation in fault zone Sedrun
2. State of the works
3. TBM excavation with open gripper TBM
5. Special planning aspects

SEMINAR ON PRACTICAL TUNNEL DESIGN AND CONSTRUCTION 26/06/06
The Alp Transit Scheme
Bern
Solothurn
Basel
Neuchâtel
Lausanne
Genève
Sion
Zermatt
Chur
St. Moritz
Bellinzona
Luzern
St. Gallen
Zürich
Baden
Schaffhausen
GBT
Gotthard
Base Tunnel
LBT
Lötschberg
Base Tunnel
F
D
F
I
I
A
Lugano

SEMINAR ON PRACTICAL TUNNEL DESIGN AND CONSTRUCTION 26/06/06
Longitudinal Profile
ExistingGotthard-
RailwayTunnel
ExistingCeneri-
RailwayTunnel
Existing
Zimmerberg-
RailwayTunnel
ExistingGotthard-
RailwayTunnel
ExistingCeneri-
RailwayTunnel
Existing
Zimmerberg-
RailwayTunnel

SEMINAR ON PRACTICAL TUNNEL DESIGN AND CONSTRUCTION 26/06/06
Gotthard Base Tunnel, Alignment and Tunnel Lots
Total length: 57 km
Three intermediate points of attack
5 Construction sections

SEMINAR ON PRACTICAL TUNNEL DESIGN AND CONSTRUCTION 26/06/06
Evaluated Tunnel Systems

SEMINAR ON PRACTICAL TUNNEL DESIGN AND CONSTRUCTION 26/06/06
Tunnel System

SEMINAR ON PRACTICAL TUNNEL DESIGN AND CONSTRUCTION 26/06/06
Gotthard Base Tunnel, Overview

SEMINAR ON PRACTICAL TUNNEL DESIGN AND CONSTRUCTION 26/06/06
Longitudinal, Geological Profile and Investigations

SEMINAR ON PRACTICAL TUNNEL DESIGN AND CONSTRUCTION 26/06/06
Geology and Heading Sections of the GBT
Drill and Blast

SEMINAR ON PRACTICAL TUNNEL DESIGN AND CONSTRUCTION 26/06/06
Design Joint venture
Amberg is involved in the project since 1990
The work is done in an engineering joint venture together with
Lombardi SA and Pöyri Ltd.
The JV is responsible for all design works from the first studies to the
drawings “good for construction” and the site management

SEMINAR ON PRACTICAL TUNNEL DESIGN AND CONSTRUCTION 26/06/06
Content
1. Project overview
4. Excavation in fault zone Sedrun
2. State of the works
3. TBM excavation with open gripper TBM
5. Special planning aspects

SEMINAR ON PRACTICAL TUNNEL DESIGN AND CONSTRUCTION 26/06/06
GBT, State of Excavation June 1st, 2006
Southportal
Bodio
already excavated
excavation and lining
accomplished
tunnels still to be excavated

Of the total of 153.5 km of
access passages, shafts and
main tunnels 94.1 km or 61.3 %
have already been excavated

SEMINAR ON PRACTICAL TUNNEL DESIGN AND CONSTRUCTION 26/06/06
Construction Section Erstfeld

SEMINAR ON PRACTICAL TUNNEL DESIGN AND CONSTRUCTION 26/06/06
Construction Section Erstfeld
Beginning of work: July 2004
Beginning of the TBM excavation: 2006

SEMINAR ON PRACTICAL TUNNEL DESIGN AND CONSTRUCTION 26/06/06
Construction Section Amsteg

SEMINAR ON PRACTICAL TUNNEL DESIGN AND CONSTRUCTION 26/06/06
Construction Section Amsteg, Tunnel Boring Machine
At June 1st, 2006
TBM east reached the end of
the section (length 11.3 km)
TBM west about 1.5 km to the
border

SEMINAR ON PRACTICAL TUNNEL DESIGN AND CONSTRUCTION 26/06/06
Construction Section Sedrun

SEMINAR ON PRACTICAL TUNNEL DESIGN AND CONSTRUCTION 26/06/06
Construction Section Sedrun

SEMINAR ON PRACTICAL TUNNEL DESIGN AND CONSTRUCTION 26/06/06
Construction Section Sedrun, Logistic Concept
Sedrun shaft
Portal installation
field
Northern drives
Foot of shaft
Concrete plant, silos
Access tunnel
Pipeline for
pneumatic
cement conveying
Depth ~800 m
Trackbound transport
Counterweight
Gotthard Base Tunnel
Trackbound transport
Southern drives
Head of shaft
- carrying persons
- excavated material
Cage for:
- construction material
Ventilation tunnel

SEMINAR ON PRACTICAL TUNNEL DESIGN AND CONSTRUCTION 26/06/06
Construction Section Sedrun, Shaft Cross Section
Fresh air
Waste
7.75 m
8.60-9.00 m (cross section = 63m )
2
air
Pipes for dewatering
Additional man riding hoist
Counter weight
Pipes for supply
Separation wall
In situ concrete lining
Big Cage 5.5 x 2.8 m

SEMINAR ON PRACTICAL TUNNEL DESIGN AND CONSTRUCTION 26/06/06
Construction Section Sedrun, Shaft Bottom

SEMINAR ON PRACTICAL TUNNEL DESIGN AND CONSTRUCTION 26/06/06
Construction Section Sedrun, Logistic Problems

SEMINAR ON PRACTICAL TUNNEL DESIGN AND CONSTRUCTION 26/06/06
Construction Method of Shaft 2

SEMINAR ON PRACTICAL TUNNEL DESIGN AND CONSTRUCTION 26/06/06
Construction of Shaft 2, Pilot and Raise Boring

SEMINAR ON PRACTICAL TUNNEL DESIGN AND CONSTRUCTION 26/06/06
Construction of Shaft 2, Shaftboring Machine

SEMINAR ON PRACTICAL TUNNEL DESIGN AND CONSTRUCTION 26/06/06
Construction Section Sedrun, Northern Tunnels
1.5 km excavated
About 500 m to go for
breakthrough towards
Amsteg section

SEMINAR ON PRACTICAL TUNNEL DESIGN AND CONSTRUCTION 26/06/06
Construction Section Sedrun, Southern Tunnels
Suspended Platform
Mucking and work at the
invert at the same time
2.5 km excavated
About 3 km to be excavated

SEMINAR ON PRACTICAL TUNNEL DESIGN AND CONSTRUCTION 26/06/06
Construction Section Sedrun, Back-up Installations

SEMINAR ON PRACTICAL TUNNEL DESIGN AND CONSTRUCTION 26/06/06
Construction Section Sedrun, Investigation Drilling
Preventer:
Shear Preventer
Pipe Ram
Roto Pac

SEMINAR ON PRACTICAL TUNNEL DESIGN AND CONSTRUCTION 26/06/06
Construction Section Faido

SEMINAR ON PRACTICAL TUNNEL DESIGN AND CONSTRUCTION 26/06/06
Construction Section Faido, Model of Multifunctional Station

SEMINAR ON PRACTICAL TUNNEL DESIGN AND CONSTRUCTION 26/06/06
Construction Section Faido, Cross Cavern,
Unexpected Downfall April 2002

SEMINAR ON PRACTICAL TUNNEL DESIGN AND CONSTRUCTION 26/06/06
Construction Section Faido, fault Zones
Original layout
Revised layout
Move of large caverns into better
geological conditions

SEMINAR ON PRACTICAL TUNNEL DESIGN AND CONSTRUCTION 26/06/06
Construction Section Bodio

SEMINAR ON PRACTICAL TUNNEL DESIGN AND CONSTRUCTION 26/06/06
Construction Section Bodio, Steel Arch of TBM

SEMINAR ON PRACTICAL TUNNEL DESIGN AND CONSTRUCTION 26/06/06
Construction Section Bodio, Installation of Sealing

SEMINAR ON PRACTICAL TUNNEL DESIGN AND CONSTRUCTION 26/06/06
Construction Section Bodio, Curing

SEMINAR ON PRACTICAL TUNNEL DESIGN AND CONSTRUCTION 26/06/06
Construction Section Bodio, Completed Single Track Tunnel
14.5 km excavated
< 1 km to be excavated
Breakthrough to Faido in
September
70 % of the final lining
finished

SEMINAR ON PRACTICAL TUNNEL DESIGN AND CONSTRUCTION 26/06/06
Content
1. Project overview
4. Excavation in fault zone Sedrun
2. State of the works
3. TBM excavation with open gripper TBM
5. Special planning aspects

SEMINAR ON PRACTICAL TUNNEL DESIGN AND CONSTRUCTION 26/06/06
Overburden at the GBT and the Channel Tunnel

SEMINAR ON PRACTICAL TUNNEL DESIGN AND CONSTRUCTION 26/06/06
Special Conditions and Requirements of long and deep-
lying tunnels
High overburden and changing rock conditions

 different types of rock support necessary
 quick reaction to the actual geological situation necessary
 flexible equipment on the tunnel face necessary
 open TBM, no shilded TBM in this section

SEMINAR ON PRACTICAL TUNNEL DESIGN AND CONSTRUCTION 26/06/06
TBM in Squeezing Conditions
L* L*
1 2
u
r
p
a
DeformationDeformation
Support pressureSupport pressure
Resistance PrincipleResistance PrincipleYielding principleYielding principleFlexible Principle Resistance Principle

SEMINAR ON PRACTICAL TUNNEL DESIGN AND CONSTRUCTION 26/06/06
Construction Section Amsteg
Installation of flexible support
After
Deformation
15
Ortbetonverkleidung
min. Stärke = 35 cm
ø 9.20 m
ø 9.50 m
15
SOK
Segment 1. Ring: TH 44 (6 Stk.)
Segment 2. Ring: TH 44 (6 Stk.)
Ausbruchsicherung
Deformation = 15 cm
max. Stärke = 30 cm
Länge = 4.72 m
Länge = 4.75 m
Before
Deformation
1
1
ø 9.50 m
SOK
Segment 2. Ring: TH 44 (6 Stk.)
Segment 1. Ring: TH 44 (6 Stk.)
Länge = 4.72 m
Länge = 4.75 m

SEMINAR ON PRACTICAL TUNNEL DESIGN AND CONSTRUCTION 26/06/06
TBM Ecavation, Brittle Failure after Cutterhead
Picture: Vereina Tunnel

SEMINAR ON PRACTICAL TUNNEL DESIGN AND CONSTRUCTION 26/06/06
TBM Ecavation, Brittle Failure after Cutterhead
Picture: Vereina Tunnel

SEMINAR ON PRACTICAL TUNNEL DESIGN AND CONSTRUCTION 26/06/06
TBM Ecavation, Buckling and Spalling Effects at TBM Face
Picture: Lötschberg Tunnel

SEMINAR ON PRACTICAL TUNNEL DESIGN AND CONSTRUCTION 26/06/06
TBM Cutterhead
Vereina Tunnel, domed Gotthard Base Tunnel, flat

SEMINAR ON PRACTICAL TUNNEL DESIGN AND CONSTRUCTION 26/06/06
L
Z
0
1
#
5
7
2
4
8
Investigation, Prediction
•Additional Investigations ahead the tunnel front are necessary

•Investigation drilling (percussion and core drilling)  takes time
• TSP-Measure  little interruption of the excavation work
TBM Experience

SEMINAR ON PRACTICAL TUNNEL DESIGN AND CONSTRUCTION 26/06/06
L
Z
0
1
#
5
7
2
4
8
TBM Experience, Exploratory Drilling through Cutterhead

SEMINAR ON PRACTICAL TUNNEL DESIGN AND CONSTRUCTION 26/06/06
L
Z
0
1
#
5
7
2
4
8

SEMINAR ON PRACTICAL TUNNEL DESIGN AND CONSTRUCTION 26/06/06
Crossing fault zone
Hydrothermally
weakened Rock
 TBM West blocked in fault zone
in June 2005

SEMINAR ON PRACTICAL TUNNEL DESIGN AND CONSTRUCTION 26/06/06
Crossing fault zone, Counter attack
East Tube
West Tube
Injections
Counter attack
Access and injection tunnel
from east tube

SEMINAR ON PRACTICAL TUNNEL DESIGN AND CONSTRUCTION 26/06/06
Crossing Fault Zone, Revised Cutter Head
 Restart TBM West end of 2005

SEMINAR ON PRACTICAL TUNNEL DESIGN AND CONSTRUCTION 26/06/06
Crossing Fault Zone, Restart of Cutter Head

SEMINAR ON PRACTICAL TUNNEL DESIGN AND CONSTRUCTION 26/06/06
Content
1. Project overview
4. Excavation in fault zone Sedrun
2. State of the works
3. TBM excavation with open gripper TBM
5. Special planning aspects

SEMINAR ON PRACTICAL TUNNEL DESIGN AND CONSTRUCTION 26/06/06
Longitudinal, Geological Profile and Investigations

SEMINAR ON PRACTICAL TUNNEL DESIGN AND CONSTRUCTION 26/06/06
Construction Section Sedrun, Full Face Excavation
Tavetsch Intermediate Massiv
Squeezing rock conditions with expected deformations up
to 1 m over a length of more than 1‘000 m
Choosen Excavation System
Full Face Heading with intensive face anchoring and
yielding steel support

SEMINAR ON PRACTICAL TUNNEL DESIGN AND CONSTRUCTION 26/06/06
Construction Section Sedrun, Face Bolting

SEMINAR ON PRACTICAL TUNNEL DESIGN AND CONSTRUCTION 26/06/06
Construction Section Sedrun, Standard Cross Sections
Exc.diameter: 9 m
Exc. diameter: 13 m
Deformations: 20 cm
Inner lining: 30 cm
Deformations: 80 cm
Inner lining: 120 cm

SEMINAR ON PRACTICAL TUNNEL DESIGN AND CONSTRUCTION 26/06/06
Construction Section Sedrun, Support Placement Rig

SEMINAR ON PRACTICAL TUNNEL DESIGN AND CONSTRUCTION 26/06/06
Construction Section Sedrun, Flexible Steel Arches TH 44
Radial Deformations up to 80 cm
Average advance rates of 90 cm/day
 Support System and full face
heading proved itself

SEMINAR ON PRACTICAL TUNNEL DESIGN AND CONSTRUCTION 26/06/06
Content
1. Project overview
4. Excavation in fault zone Sedrun
2. State of the works
3. TBM excavation with open gripper TBM
5. Special planning aspects

SEMINAR ON PRACTICAL TUNNEL DESIGN AND CONSTRUCTION 26/06/06
Overburden at the GBT and the Channel Tunnel

SEMINAR ON PRACTICAL TUNNEL DESIGN AND CONSTRUCTION 26/06/06
Forecast Rock Temperature at Base Tunnel Level

SEMINAR ON PRACTICAL TUNNEL DESIGN AND CONSTRUCTION 26/06/06
Special Conditions and Requirements of long and deep-
lying tunnels
High rock temperatures
 Cooling during construction and perhaps during operation
 special requirements for the shotcrete and the concrete

SEMINAR ON PRACTICAL TUNNEL DESIGN AND CONSTRUCTION 26/06/06
Amount of Excavation Material

SEMINAR ON PRACTICAL TUNNEL DESIGN AND CONSTRUCTION 26/06/06
Material Preparation Plant and Processing Steps
Requirement for concrete
lining: 100 years without
major maintenance
Use of excavated material
as concrete aggregates

SEMINAR ON PRACTICAL TUNNEL DESIGN AND CONSTRUCTION 26/06/06
Concret and Shotcrete Prequalification,
Test Gallery Hagerbach, Sargans
Installation of
Simulating
Transport
Conditions
Agreements in contract for
necessary adjustments
during construction
Prequalification of concrete
systems

SEMINAR ON PRACTICAL TUNNEL DESIGN AND CONSTRUCTION 26/06/06
Heatable Gallery, Part of Test Gallery Hagerbach, Sargans

SEMINAR ON PRACTICAL TUNNEL DESIGN AND CONSTRUCTION 26/06/06
Test Gallery Hagerbach, Sargans
Hagerbach test Gallery belongs to
Amberg Group
5 km of galleries and tunnels

SEMINAR ON PRACTICAL TUNNEL DESIGN AND CONSTRUCTION 26/06/06
Safety aspects
During construction
 Overall safety concept for each section (with SUVA)
 Reduce risk and be prepared in case of an accident or fire
During operation
 Two Multifunctional stations and cross cuts all 300 m
 Ventilation for different possible events

SEMINAR ON PRACTICAL TUNNEL DESIGN AND CONSTRUCTION 26/06/06
Fire Event with Blocked and without Blocked Staff at the Front
with
blocked
staff
without
blocked
staff

SEMINAR ON PRACTICAL TUNNEL DESIGN AND CONSTRUCTION 26/06/06
Impressions of the Safety Concept during Construction
Safety control centre Exercises with the
external fire brigade

SEMINAR ON PRACTICAL TUNNEL DESIGN AND CONSTRUCTION 26/06/06
Faido Multifunctional Station, Layout

SEMINAR ON PRACTICAL TUNNEL DESIGN AND CONSTRUCTION 26/06/06
Multifunctional Station, Emergency Stations
Self rescue within 45 minutes
External rescue within 90 minutes

SEMINAR ON PRACTICAL TUNNEL DESIGN AND CONSTRUCTION 26/06/06
Faido Multifunctional Station, Ventilation during Construction
fresh air
exhaust air

SEMINAR ON PRACTICAL TUNNEL DESIGN AND CONSTRUCTION 26/06/06
Fresh and Exhaust Air System for Fire Events

SEMINAR ON PRACTICAL TUNNEL DESIGN AND CONSTRUCTION 26/06/06
Normal concrete
Without any special fire protection
measures
After 20 minutes
Concrete disturbed (11.5 cm deep)
Fire Protection Tests, Test Gallery Hagerbach, Sargans

SEMINAR ON PRACTICAL TUNNEL DESIGN AND CONSTRUCTION 26/06/06
Fire Protection Tests, Test Gallery Hagerbach, Sargans
2 kg PP-fibres:
4 cm chips
3 kg PP-fibres:
1 cm chips
1 kg PP-fibres:
6 cm chips
2 kg PP-fibres:
4 cm chips
2 kg PP-fibres:
4 cm chips
3 kg PP-fibres:
1 cm chips
3 kg PP-fibres:
1 cm chips
1 kg PP-fibres:
6 cm chips
1 kg PP-fibres:
6 cm chips

SEMINAR ON PRACTICAL TUNNEL DESIGN AND CONSTRUCTION 26/06/06
Break Through

SEMINAR ON PRACTICAL TUNNEL DESIGN AND CONSTRUCTION 26/06/06
Thank you for
your attention!

SEMINAR ON PRACTICAL TUNNEL DESIGN AND CONSTRUCTION 26/06/06
TBM versus D & B, Comparison of Heading Time for Faido
TBM
D&B
Contractor I Contractor II Contractor III Contractor IV
month

SEMINAR ON PRACTICAL TUNNEL DESIGN AND CONSTRUCTION 26/06/06
TBM versus Drill & Blast, Comparison of Costs for Faido
Offered Price Lot Faido, GBT
 3 %
 3 %
 9 %
 0 %
Contractor I Contractor II Contractor III Contractor IV
TBM
D&B
Tender Price