Transformer Protetion Relay(ABB RET 670) Sample Configuration
Size: 232.82 KB
Language: en
Added: Aug 17, 2024
Slides: 21 pages
Slide Content
CONFIGURATION RET670 (VCTR) A25
VERSION 1.0, SINGLE BREAKER 2-WINDING
Work Sheet Description Sheet
OVERVIEW List of content 1
TRANSFORMER_PARALLEL_LOGIC CB/DES logic for trafo inclusion
2
VOLTAGE_TAP_CHANGE_CONTROL Automatic voltage and transformer control
3-7
V_BO VCTR Binary outputs
8-10
VCTR Binary inputsV_BI
11-14
VCTR Analogue InputsV_AI
15
DIST_REPORTING Disturbance Reporting
16-17
MEASURING_AND_RANGE_ALARMS Measured CVMMXU Quantities and Range Alarms
18-20
Controls issued from IED HMIIED_HMI_CONTROL
21-22
COMMON Common IED Functions 23
RET670 V1.1 IEC 01 2007-11-27 HE
A A
B B
C C
D D
E E
1
1
2
2
3
3
4
4
5
5
6
6
7
7
8
8
Main Application: OVERVIEW , Page: 1
Rev.Modification Rel. date Created by
Replacing
Based on
Project
Makumbusho
Responsible department
ABB Ltd.
Makumbusho.Substation.Voltage Level.T1
Technical reference Document kind
Graphical Application Configuration
Doc. designation
E1Q01FN1
Created by Title
T1
Document id.
Approved by Rev.
0
Rel. date
15.06.2023
Lang.
en
1 / 21
SMAI1
HV_87T_87NT
O:1|T:1|I:25BLOCKDFTSPFCL1
GRP1L1
L2
GRP1L2
L3
GRP1L3
Not used
GRP1N
SPFCOUTAI3PAI1AI2AI3AI4AIN
SMAI1
HV_50PT_50GPT
O:1|T:3|I:1BLOCKDFTSPFCL1
GRP1L1
L2
GRP1L2
L3
GRP1L3
Not used
GRP1N
SPFCOUTAI3PAI1AI2AI3AI4AIN
SMAI2
HV_51PT_51GPT
O:1|T:8|I:14BLOCKL1
GRP2L1
L2
GRP2L2
L3
GRP2L3
Not used
GRP2N
AI3PAI1AI2AI3AI4AIN
SMAI3
HV_87NT_N
O:1|T:1|I:27BLOCKNot used
GRP3L1
Not used
GRP3L2
Not used
GRP3L3
IN
GRP3N
AI3PAI1AI2AI3AI4AIN
SMAI5
HV_N
O:1|T:8|I:17BLOCKHV_N
GRP5L1
Not used
GRP5L2
Not used
GRP5L3
Not used
GRP5N
AI3PAI1AI2AI3AI4AINFALSEREAL_ZERO PR25_87T_87NTFALSEREAL_ZERO PR01_50PT_50GPTPR01_AI1PR01_AI2PR01_AI3PR01_AI4FALSE PR14_51PT_51GPTPR14_AI1PR14_AI2PR14_AI3PR14_AI4FALSE PR27_HV_87NT_NFALSE HV_N
TRM_9I_3U_31.CH1
TRM_9I_3U_31.CH2
TRM_9I_3U_31.CH3
TRM_9I_3U_31.CH4
TRM_9I_3U_31.CH4
TRM_9I_3U_31.CH3
TRM_9I_3U_31.CH1
TRM_9I_3U_31.CH2
TRM_9I_3U_31.CH1
TRM_9I_3U_31.CH2
TRM_9I_3U_31.CH3
A A
B B
C C
D D
E E
1
1
2
2
3
3
4
4
5
5
6
6
7
7
8
8
Main Application: CT_HV, Page: 1
Rev.Modification Rel. date Created by
Replacing
Based on
Project
Makumbusho
Responsible department
ABB Ltd.
Makumbusho.Substation.Voltage Level.T1
Technical reference Document kind
Graphical Application Configuration
Doc. designation
E1Q01FN1
Created by Title
T1
Document id.
Approved by Rev.
0
Rel. date
15.06.2023
Lang.
en
2 / 21
SMAI2
LV_87T_87NT
O:1|T:1|I:26
BLOCKL1
GRP2L1
L2
GRP2L2
L3
GRP2L3
Not used
GRP2N
AI3PAI1AI2AI3AI4AIN
SMAI2
LV_50ST_50GST
O:1|T:3|I:2
BLOCKL1
GRP2L1
L2
GRP2L2
L3
GRP2L3
Not used
GRP2N
AI3PAI1AI2AI3AI4AIN
SMAI3
LV_51ST_51GST
O:1|T:8|I:15BLOCKL1
GRP3L1
L2
GRP3L2
L3
GRP3L3
Not used
GRP3N
AI3PAI1AI2AI3AI4AIN
SMAI4
LV_90_1PH
O:1|T:8|I:16BLOCKL1
GRP4L1
Not used
GRP4L2
Not used
GRP4L3
Not used
GRP4N
AI3PAI1AI2AI3AI4AIN
SMAI4
LV_87NT_N
O:1|T:1|I:28
BLOCKNot used
GRP4L1
Not used
GRP4L2
Not used
GRP4L3
IN
GRP4N
AI3PAI1AI2AI3AI4AIN
SMAI6
LV_N
O:1|T:8|I:18
BLOCKLV_N
GRP6L1
Not used
GRP6L2
Not used
GRP6L3
Not used
GRP6N
AI3PAI1AI2AI3AI4AINFALSE PR26_87T_87NTFALSE PR02_50ST_50GSTPR02_AI1PR02_AI2PR02_AI3PR02_AI4FALSE PR15_51ST_51GSTPR15_AI1PR15_AI2PR15_AI3PR15_AI4FALSE PR16_90PR16_90_L1FALSE PR28_LV_87NT_NFALSE LV_N
TRM_9I_3U_31.CH7
TRM_9I_3U_31.CH8TRM_9I_3U_31.CH9
TRM_9I_3U_31.CH7
TRM_9I_3U_31.CH8TRM_9I_3U_31.CH9
TRM_9I_3U_31.CH7
TRM_9I_3U_31.CH8
TRM_9I_3U_31.CH9
TRM_9I_3U_31.CH6
TRM_9I_3U_31.CH5
TRM_9I_3U_31.CH5
A A
B B
C C
D D
E E
1
1
2
2
3
3
4
4
5
5
6
6
7
7
8
8
Main Application: CT_LV, Page: 1
Rev.Modification Rel. date Created by
Replacing
Based on
Project
Makumbusho
Responsible department
ABB Ltd.
Makumbusho.Substation.Voltage Level.T1
Technical reference Document kind
Graphical Application Configuration
Doc. designation
E1Q01FN1
Created by Title
T1
Document id.
Approved by Rev.
0
Rel. date
15.06.2023
Lang.
en
3 / 21
SMAI1
LV_90
O:1|T:8|I:13BLOCKDFTSPFCL1
GRP1L1
L2
GRP1L2
L3
GRP1L3
Not used
GRP1N
SPFCOUTAI3PAI1AI2AI3AI4AINFALSEREAL_ZERO PR13_LV_UPR13_U_AI1PR13_U_AI2PR13_U_AI3PR13_U_AIN
TRM_9I_3U_31.CH10
TRM_9I_3U_31.CH11TRM_9I_3U_31.CH12
A A
B B
C C
D D
E E
1
1
2
2
3
3
4
4
5
5
6
6
7
7
8
8
Main Application: VT_LV, Page: 1
Rev.Modification Rel. date Created by
Replacing
Based on
Project
Makumbusho
Responsible department
ABB Ltd.
Makumbusho.Substation.Voltage Level.T1
Technical reference Document kind
Graphical Application Configuration
Doc. designation
E1Q01FN1
Created by Title
T1
Document id.
Approved by Rev.
0
Rel. date
15.06.2023
Lang.
en
4 / 21
PHPIOC
O:615|T:3|I:1I3PBLOCKENMULTTRIPTRL1TRL2TRL3
OC4PTOC
O:501|T:8|I:1I3PU3PBLOCKBLKTRBLKST1BLKST2BLKST3BLKST4ENMULT1ENMULT2ENMULT3ENMULT4TRIPTR1TR2TR3TR4TRL1TRL2TRL3TR1L1TR1L2TR1L3TR2L1TR2L2TR2L3TR3L1TR3L2TR3L3TR4L1TR4L2TR4L3STARTST1ST2ST3ST4STL1STL2STL3ST1L1ST1L2ST1L3ST2L1ST2L2ST2L3ST3L1ST3L2ST3L3ST4L1ST4L2ST4L32NDHARMDIRL1DIRL2DIRL3
OR
O:704|T:3|I:13INPUT1INPUT2INPUT3INPUT4INPUT5INPUT6OUTNOUT
OR
O:703|T:8|I:69INPUT1INPUT2INPUT3INPUT4INPUT5INPUT6OUTNOUTPR01_50PT_50GPTFALSEFALSE HV_50_TRL1HV_50_TRL2HV_50_TRL3PR14_51PT_51GPTGRP_OFFFALSEFALSEFALSEFALSEFALSEFALSEFALSEFALSEFALSEFALSE HV_51_TRL1HV_51_TRL2HV_51_TRL3HV_51_STARTHV_51_STL1HV_51_STL2HV_51_STL3HV_51_2NDHARMTEST_50PTFALSEFALSEFALSEFALSE HV_50_TRIPTEST_51PTFALSEFALSEFALSEFALSE HV_51_TRIPA A
B B
C C
D D
E E
1
1
2
2
3
3
4
4
5
5
6
6
7
7
8
8
Main Application: HV_IOC_TOC, Page: 1
Rev.Modification Rel. date Created by
Replacing
Based on
Project
Makumbusho
Responsible department
ABB Ltd.
Makumbusho.Substation.Voltage Level.T1
Technical reference Document kind
Graphical Application Configuration
Doc. designation
E1Q01FN1
Created by Title
T1
Document id.
Approved by Rev.
0
Rel. date
15.06.2023
Lang.
en
5 / 21
EFPIOC
O:641|T:3|I:1I3PBLOCKBLKARMULTENTRIP
EF4PTOC
O:509|T:8|I:1I3PU3PI3PPOLBLOCKBLKTRBLKST1BLKST2BLKST3BLKST4ENMULT1ENMULT2ENMULT3ENMULT4CBPOSCLOSECBOPENCBTRIPTRIN1TRIN2TRIN3TRIN4TRSOTFSTARTSTIN1STIN2STIN3STIN4STSOTFSTFWSTRV2NDHARMD
OR
O:706|T:3|I:14INPUT1INPUT2INPUT3INPUT4INPUT5INPUT6OUTNOUT
OR
O:705|T:8|I:70INPUT1INPUT2INPUT3INPUT4INPUT5INPUT6OUTNOUTPR01_50PT_50GPTFALSEFALSEFALSEPR14_51PT_51GPTGRP_OFFGRP_OFFFALSEFALSEFALSEFALSEFALSEFALSEFALSEFALSEFALSEFALSEFALSEFALSEFALSE HV_51G_STARTHV_50G_2NDHARMTEST_50GPTFALSEFALSEFALSEFALSE HV_50G_TRIPTEST_51GPTFALSEFALSEFALSEFALSE HV_51G_TRIP
A A
B B
C C
D D
E E
1
1
2
2
3
3
4
4
5
5
6
6
7
7
8
8
Main Application: HV_IEF_TEF, Page: 1
Rev.Modification Rel. date Created by
Replacing
Based on
Project
Makumbusho
Responsible department
ABB Ltd.
Makumbusho.Substation.Voltage Level.T1
Technical reference Document kind
Graphical Application Configuration
Doc. designation
E1Q01FN1
Created by Title
T1
Document id.
Approved by Rev.
0
Rel. date
15.06.2023
Lang.
en
6 / 21
T2WPDIF
O:925|T:1|I:1I3PW1CT1I3PW1CT2I3PW2CT1I3PW2CT2TAPOLTC1OLTC1ALBLOCKBLKRESBLKUNRESBLKNSUNRBLKNSSENTRIPTRIPRESTRIPUNRETRNSUNRTRNSSENSSTARTSTL1STL2STL3BLK2HBLK2HL1BLK2HL2BLK2HL3BLK5HBLK5HL1BLK5HL2BLK5HL3BLKWAVBLKWAVL1BLKWAVL2BLKWAVL3IDALARMOPENCTOPENCTALIDL1IDL2IDL3IDL1MAGIDL2MAGIDL3MAGIBIASIDNSMAG
OR
O:1004|T:3|I:21INPUT1INPUT2INPUT3INPUT4INPUT5INPUT6OUTNOUTPR25_87T_87NTGRP_OFFPR26_87T_87NTGRP_OFFINT_ZEROFALSEFALSEFALSEFALSEFALSEFALSE T2D1_87T_TRIPREST2D1_87T_TRIPUNRET2D1_87T_TRNSUNRT2D1_87T_TRNSSENST2D1_87T_STARTT2D1_87T_STL1T2D1_87T_STL2T2D1_87T_STL3T2D1_87T_BLK2HT2D1_87T_BLK2HL1T2D1_87T_BLK2HL2T2D1_87T_BLK2HL3T2D1_87T_BLK5HT2D1_87T_BLK5HL1T2D1_87T_BLK5HL2T2D1_87T_BLK5HL3T2D1_87T_BLKWAVT2D1_87T_BLKWAVL1T2D1_87T_BLKWAVL2T2D1_87T_BLKWAVL3T2D1_87T_IDALARMT2D1_87T_OPENCTT2D1_87T_OPENCTALT2D1_87T_IDL1T2D1_87T_IDL2T2D1_87T_IDL3T2D1_87T_IBIAST2D1_87T_IDNSMAGTEST_87T1FALSEFALSEFALSEFALSE T2D1_87T_TRIP
A A
B B
C C
D D
E E
1
1
2
2
3
3
4
4
5
5
6
6
7
7
8
8
Main Application: DIFF_TR, Page: 1
Rev.Modification Rel. date Created by
Replacing
Based on
Project
Makumbusho
Responsible department
ABB Ltd.
Makumbusho.Substation.Voltage Level.T1
Technical reference Document kind
Graphical Application Configuration
Doc. designation
E1Q01FN1
Created by Title
T1
Document id.
Approved by Rev.
0
Rel. date
15.06.2023
Lang.
en
7 / 21
REFPDIF
O:945|T:1|I:1I3PI3PW1CT1I3PW1CT2I3PW2CT1I3PW2CT2BLOCKTRIPSTARTDIROKBLK2HIRESINIBIASIDIFFANGLEI2RATIO
REFPDIF
O:950|T:1|I:2I3PI3PW1CT1I3PW1CT2I3PW2CT1I3PW2CT2BLOCKTRIPSTARTDIROKBLK2HIRESINIBIASIDIFFANGLEI2RATIO
OR
O:1006|T:3|I:22INPUT1INPUT2INPUT3INPUT4INPUT5INPUT6OUTNOUT
OR
O:1008|T:3|I:23INPUT1INPUT2INPUT3INPUT4INPUT5INPUT6OUTNOUTPR27_HV_87NT_NPR25_87T_87NTGRP_OFFGRP_OFFGRP_OFFFALSE HV_87NT_STARTHV_87NT_DIROKHV_87NT_BLK2HHV_87NT_IRESHV_87NT_INHV_87NT_IBIASHV_87NT_IDIFFHV_87NT_ANGLEHV_87NT_I2RATIOPR28_LV_87NT_NPR26_87T_87NTGRP_OFFGRP_OFFGRP_OFFFALSE LV_87NT_STARTLV_87NT_DIROKLV_87NT_BLK2HLV_87NT_IRESLV_87NT_INLV_87NT_IBIASLV_87NT_IDIFFLV_87NT_ANGLELV_87NT_I2RATIOFALSEFALSEFALSEFALSETEST_87NT1 HV_87NT_TRIPTEST_87NT1FALSEFALSEFALSEFALSE LV_87NT_TRIP
A A
B B
C C
D D
E E
1
1
2
2
3
3
4
4
5
5
6
6
7
7
8
8
Main Application: REF_LOWIMP, Page: 1
Rev.Modification Rel. date Created by
Replacing
Based on
Project
Makumbusho
Responsible department
ABB Ltd.
Makumbusho.Substation.Voltage Level.T1
Technical reference Document kind
Graphical Application Configuration
Doc. designation
E1Q01FN1
Created by Title
T1
Document id.
Approved by Rev.
0
Rel. date
15.06.2023
Lang.
en
8 / 21
OR
O:708|T:3|I:15INPUT1INPUT2INPUT3INPUT4INPUT5INPUT6OUTNOUT
PHPIOC
O:620|T:3|I:2I3PBLOCKENMULTTRIPTRL1TRL2TRL3
OC4PTOC
O:502|T:8|I:2I3PU3PBLOCKBLKTRBLKST1BLKST2BLKST3BLKST4ENMULT1ENMULT2ENMULT3ENMULT4TRIPTR1TR2TR3TR4TRL1TRL2TRL3TR1L1TR1L2TR1L3TR2L1TR2L2TR2L3TR3L1TR3L2TR3L3TR4L1TR4L2TR4L3STARTST1ST2ST3ST4STL1STL2STL3ST1L1ST1L2ST1L3ST2L1ST2L2ST2L3ST3L1ST3L2ST3L3ST4L1ST4L2ST4L32NDHARMDIRL1DIRL2DIRL3
OR
O:707|T:8|I:71INPUT1INPUT2INPUT3INPUT4INPUT5INPUT6OUTNOUTTEST_50STFALSEFALSEFALSEFALSE LV_50_TRIPPR02_50ST_50GSTFALSEFALSE LV_50_TRL1LV_50_TRL2LV_50_TRL3PR15_51ST_51GSTGRP_OFFFALSEFALSEFALSEFALSEFALSEFALSEFALSEFALSEFALSEFALSE LV_51_TRL1LV_51_TRL2LV_51_TRL3LV_51_STARTLV_51_STL1LV_51_STL2LV_51_STL3LV_51_2NDHARMTEST_51STFALSEFALSEFALSEFALSE LV_51_TRIP
A A
B B
C C
D D
E E
1
1
2
2
3
3
4
4
5
5
6
6
7
7
8
8
Main Application: LV_IOC_TOC, Page: 1
Rev.Modification Rel. date Created by
Replacing
Based on
Project
Makumbusho
Responsible department
ABB Ltd.
Makumbusho.Substation.Voltage Level.T1
Technical reference Document kind
Graphical Application Configuration
Doc. designation
E1Q01FN1
Created by Title
T1
Document id.
Approved by Rev.
0
Rel. date
15.06.2023
Lang.
en
9 / 21
OR
O:710|T:3|I:16INPUT1INPUT2INPUT3INPUT4INPUT5INPUT6OUTNOUT
EFPIOC
O:642|T:3|I:2I3PBLOCKBLKARMULTENTRIP
OR
O:709|T:8|I:72INPUT1INPUT2INPUT3INPUT4INPUT5INPUT6OUTNOUT
EF4PTOC
O:510|T:8|I:2I3PU3PI3PPOLBLOCKBLKTRBLKST1BLKST2BLKST3BLKST4ENMULT1ENMULT2ENMULT3ENMULT4CBPOSCLOSECBOPENCBTRIPTRIN1TRIN2TRIN3TRIN4TRSOTFSTARTSTIN1STIN2STIN3STIN4STSOTFSTFWSTRV2NDHARMDTEST_50GSTFALSEFALSEFALSEFALSE LV_50G_TRIPPR02_50ST_50GSTFALSEFALSEFALSETEST_51GSTFALSEFALSEFALSEFALSE LV_51G_TRIPPR15_51ST_51GSTGRP_OFFGRP_OFFFALSEFALSEFALSEFALSEFALSEFALSEFALSEFALSEFALSEFALSEFALSEFALSEFALSE LV_51G_STARTLV_50G_2NDHARM
A A
B B
C C
D D
E E
1
1
2
2
3
3
4
4
5
5
6
6
7
7
8
8
Main Application: LV_IEF_TEF, Page: 1
Rev.Modification Rel. date Created by
Replacing
Based on
Project
Makumbusho
Responsible department
ABB Ltd.
Makumbusho.Substation.Voltage Level.T1
Technical reference Document kind
Graphical Application Configuration
Doc. designation
E1Q01FN1
Created by Title
T1
Document id.
Approved by Rev.
0
Rel. date
15.06.2023
Lang.
en
10 / 21
TR8ATCC
T1
O:1448|T:100|I:1
I3P1I3P2U3P2BLOCKMANCTRLAUTOCTRLPSTORAISEVLOWERVEAUTOBLKDEBLKAUTLVA1LVA2LVA3LVA4LVARESETRSTERRDISCQ1ONQ2ONQ3ONSNGLMODET1INCLDT2INCLDT3INCLDT4INCLDT5INCLDT6INCLDT7INCLDT8INCLDFORCMASTRSTMASTATCCINHORIZ1HORIZ2HORIZ3HORIZ4HORIZ5HORIZ6HORIZ7HORIZ8ATCCOUTMANAUTOIBLKPGTFWDPLTREVQGTFWDQLTREVREVACBLKUHIGHULOWUBLKHOURHUNTDAYHUNTHUNTINGSINGLETIMERONPARALLELHOMINGADAPTTOTBLKAUTOBLKMASTERFOLLOWERMFERROUTOFPOSUGTUPPDBULTLOWDBCOMMERRICIRCTRFDISCVTALARMT1PGT2PGT3PGT4PGT5PGT6PGT7PGT8PG
TCMYLTC
O:1444|T:100|I:1YLTCINTCINPROGINERRRESETERROUTERRRS_CLCNTRS_OPCNTPARITYBIERRB1B2B3B4B5B6MAURAISEULOWERHIPOSALLOPOSALPOSERRALCMDERRALTCERRALPOSOUTCONVERRNEWPOSHIDIFPOSINVALPOSTCPOSYLTCOUT
SINGLECMD
O:60|T:100|I:1BLOCKTAP RAISE
OUT1
TAP LOWER
OUT2
:
OUT3
:
OUT4
:
OUT5
RESET ERROR
OUT6
RESET COUNTER
OUT7
:
OUT8
:
OUT9
:
OUT10
:
OUT11
:
OUT12
:
OUT13
:
OUT14
:
OUT15
:
OUT16
VCTRRCV
VCTRT2
O:1420|T:100|I:1
BLOCKVCTR_RECCOMVALIDDATVALID
VCTRRCV
VCTRT5
O:1421|T:100|I:2BLOCKVCTR_RECCOMVALIDDATVALIDPR14_51PT_51GPTPR16_90PR13_LV_UFALSEVS_MANUALVS_AUTOINT_ONEFALSEFALSEFALSEFALSEFALSEFALSEFALSEFALSEFALSEFALSEFALSEVS_SINGLEFALSEFALSEFALSEFALSEFALSEVS_MASTERVS_FOLLOWERGRP_OFFGRP_OFFGRP_OFFGRP_OFFGRP_OFFGRP_OFF MANUALAUTOSINGLEPARALLELMASTERFOLLOWERFALSEFALSERST_ERRFALSEFALSERS_OPCNTPARITYBITERRORBITPOS1POS2POS3POS4POS5POS6REAL_ZERO URAISEULOWERPOSOUTFALSE RST_ERRRS_OPCNTFALSEFALSEVS_T1_T2VS_T1_T5VS_T1_IN T1[1]_T2PGT1[1]_T5PGRST_ERR
A A
B B
C C
D D
E E
1
1
2
2
3
3
4
4
5
5
6
6
7
7
8
8
Main Application: V_CONTROL, Page: 1
Rev.Modification Rel. date Created by
Replacing
Based on
Project
Makumbusho
Responsible department
ABB Ltd.
Makumbusho.Substation.Voltage Level.T1
Technical reference Document kind
Graphical Application Configuration
Doc. designation
E1Q01FN1
Created by Title
T1
Document id.
Approved by Rev.
0
Rel. date
15.06.2023
Lang.
en
11 / 21
OR
O:6909|T:100|I:280INPUT1INPUT2INPUT3INPUT4INPUT5INPUT6OUTNOUT
OR
O:6907|T:100|I:279INPUT1INPUT2INPUT3INPUT4INPUT5INPUT6OUTNOUT
OR
O:6905|T:100|I:278INPUT1INPUT2INPUT3INPUT4INPUT5INPUT6OUTNOUT
OR
O:6903|T:100|I:277INPUT1INPUT2INPUT3INPUT4INPUT5INPUT6OUTNOUT
OR
O:6809|T:100|I:276INPUT1INPUT2INPUT3INPUT4INPUT5INPUT6OUTNOUT
OR
O:6807|T:100|I:275INPUT1INPUT2INPUT3INPUT4INPUT5INPUT6OUTNOUT
OR
O:6805|T:100|I:274INPUT1INPUT2INPUT3INPUT4INPUT5INPUT6OUTNOUT
OR
O:6803|T:100|I:273INPUT1INPUT2INPUT3INPUT4INPUT5INPUT6OUTNOUTPARITYTEST_PARITYFALSEFALSEFALSEFALSE PARITYBITBIERRTEST_ERROR_BIFALSEFALSEFALSEFALSE ERRORBITTAP_POS1TEST_TAP_BI1FALSEFALSEFALSEFALSE POS1TAP_POS2TEST_TAP_BI2FALSEFALSEFALSEFALSE POS2TAP_POS3TEST_TAP_BI3FALSEFALSEFALSEFALSE POS3TAP_POS4TEST_TAP_BI4FALSEFALSEFALSEFALSE POS4TAP_POS5TEST_TAP_BI5FALSEFALSEFALSEFALSE POS5TAP_POS6TEST_TAP_BI6FALSEFALSEFALSEFALSE POS6
A A
B B
C C
D D
E E
1
1
2
2
3
3
4
4
5
5
6
6
7
7
8
8
Main Application: V_CONTROL, Page: 2
Rev.Modification Rel. date Created by
Replacing
Based on
Project
Makumbusho
Responsible department
ABB Ltd.
Makumbusho.Substation.Voltage Level.T1
Technical reference Document kind
Graphical Application Configuration
Doc. designation
E1Q01FN1
Created by Title
T1
Document id.
Approved by Rev.
0
Rel. date
15.06.2023
Lang.
en
12 / 21
TMAGGIO
O:2700|T:3|I:1INPUT1INPUT2INPUT3INPUT4INPUT5INPUT6INPUT7INPUT8INPUT9INPUT10INPUT11INPUT12INPUT13INPUT14INPUT15INPUT16INPUT17INPUT18INPUT19INPUT20INPUT21INPUT22INPUT23INPUT24INPUT25INPUT26INPUT27INPUT28INPUT29INPUT30INPUT31INPUT32OUTPUT1OUTPUT2OUTPUT3
OR
O:2605|T:8|I:118INPUT1INPUT2INPUT3INPUT4INPUT5INPUT6OUTNOUT
OR
O:2609|T:8|I:120INPUT1INPUT2INPUT3INPUT4INPUT5INPUT6OUTNOUT
OR
O:2607|T:8|I:119INPUT1INPUT2INPUT3INPUT4INPUT5INPUT6OUTNOUTHV_50_TRIPHV_51_TRIPHV_50G_TRIPHV_51G_TRIPT2D1_87T_TRIPFALSEHV_87NT_TRIPFALSELV_87NT_TRIPFALSELV_50_TRIPLV_51_TRIPLV_50G_TRIPLV_51G_TRIPFALSEFALSEFALSEFALSEFALSEFALSEFALSEFALSEFALSEFALSEFALSEFALSEFALSEFALSEFALSEFALSEFALSEFALSE TRIP_52PT_52STFALSEHV_50_TRIPHV_51_STARTHV_50G_TRIPHV_51G_STARTT2D1_87T_STARTFALSEFALSEFALSEFALSE GENERAL_STARTHV_87NT_STARTLV_87NT_STARTLV_50_TRIPLV_51_STARTLV_50G_TRIPLV_51G_STARTA A
B B
C C
D D
E E
1
1
2
2
3
3
4
4
5
5
6
6
7
7
8
8
Main Application: TRIP_LOGIC, Page: 1
Rev.Modification Rel. date Created by
Replacing
Based on
Project
Makumbusho
Responsible department
ABB Ltd.
Makumbusho.Substation.Voltage Level.T1
Technical reference Document kind
Graphical Application Configuration
Doc. designation
E1Q01FN1
Created by Title
T1
Document id.
Approved by Rev.
0
Rel. date
15.06.2023
Lang.
en
13 / 21
SMBI
TAP_CONTROL
O:150|T:3|I:1PARITY
VIn1
BIERR
VIn2
TAP_POS1
VIn3
TAP_POS2
VIn4
TAP_POS3
VIn5
TAP_POS4
VIn6
TAP_POS5
VIn7
TAP_POS6
VIn8
Not used
VIn9
Not used
VIn10
PARITY
BI1
BIERR
BI2
TAP_POS1
BI3
TAP_POS2
BI4
TAP_POS3
BI5
TAP_POS4
BI6
TAP_POS5
BI7
TAP_POS6
BI8
Not used
BI9
Not used
BI10
PARITYBIERRTAP_POS1TAP_POS2TAP_POS3TAP_POS4TAP_POS5TAP_POS6
BIM_3.BI1
BIM_3.BI2BIM_3.BI3BIM_3.BI4BIM_3.BI5BIM_3.BI6BIM_3.BI7BIM_3.BI8
A A
B B
C C
D D
E E
1
1
2
2
3
3
4
4
5
5
6
6
7
7
8
8
Main Application: V_BI, Page: 1
Rev.Modification Rel. date Created by
Replacing
Based on
Project
Makumbusho
Responsible department
ABB Ltd.
Makumbusho.Substation.Voltage Level.T1
Technical reference Document kind
Graphical Application Configuration
Doc. designation
E1Q01FN1
Created by Title
T1
Document id.
Approved by Rev.
0
Rel. date
15.06.2023
Lang.
en
14 / 21
SMBO
OUTPUT
O:4300|T:3|I:1BO1BO2BO3BO4BO5BO6BO7BO8BO9BO10TRIP_52PT1
BO1
TRIP_52ST1
BO2
GENERAL_START
BO3
Not used
BO4
Not used
BO5
Not used
BO6
Not used
BO7
Not used
BO8
U_RAISE
BO9
U_LOWER
BO10
SMBO
LED
O:4301|T:3|I:2BO1BO2BO3BO4BO5BO6BO7BO8BO9BO1050PT_51PT
BO1
50GPT_51GPT
BO2
87T1
BO3
87NT1
BO4
50ST_51ST
BO5
50GST_51GST
BO6
Not used
BO7
Not used
BO8
Not used
BO9
Not used
BO10
OR
O:2009|T:8|I:112INPUT1INPUT2INPUT3INPUT4INPUT5INPUT6OUTNOUT
OR
O:2503|T:8|I:113INPUT1INPUT2INPUT3INPUT4INPUT5INPUT6OUTNOUT
OR
O:2507|T:8|I:115INPUT1INPUT2INPUT3INPUT4INPUT5INPUT6OUTNOUT
OR
O:2509|T:8|I:116INPUT1INPUT2INPUT3INPUT4INPUT5INPUT6OUTNOUT
OR
O:2603|T:8|I:117INPUT1INPUT2INPUT3INPUT4INPUT5INPUT6OUTNOUTTRIP_52PT_52STTRIP_52PT_52STGENERAL_STARTFALSEFALSEFALSEFALSEFALSEURAISEULOWERFALSEFALSEFALSEFALSET2D1_87T_TRIPHV_50_TRIPHV_51_TRIPFALSEFALSEFALSEFALSEHV_50G_TRIPHV_51G_TRIPFALSEFALSEFALSEFALSEHV_87NT_TRIPFALSELV_87NT_TRIPFALSEFALSEFALSELV_50_TRIPLV_51_TRIPFALSEFALSEFALSEFALSELV_50G_TRIPLV_51G_TRIPFALSEFALSEFALSEFALSE
LED.RED1
LED.RED2LED.RED3
LED.RED4
LED.RED5LED.RED6
BOM_5.BO1
BOM_5.BO3BOM_5.BO5
BOM_5.BO12
BOM_5.BO22
BOM_5.BO24
A A
B B
C C
D D
E E
1
1
2
2
3
3
4
4
5
5
6
6
7
7
8
8
Main Application: V_BO, Page: 1
Rev.Modification Rel. date Created by
Replacing
Based on
Project
Makumbusho
Responsible department
ABB Ltd.
Makumbusho.Substation.Voltage Level.T1
Technical reference Document kind
Graphical Application Configuration
Doc. designation
E1Q01FN1
Created by Title
T1
Document id.
Approved by Rev.
0
Rel. date
15.06.2023
Lang.
en
15 / 21
A1RADR
O:3702|T:3|I:1HV_L1
INPUT1
HV_L2
INPUT2
HV_L3
INPUT3
HV_L4
INPUT4
LV_L1
INPUT5
LV_L2
INPUT6
LV_L3
INPUT7
LV_L4
INPUT8
LV_90L1
INPUT9
DRA#-INPUT10
INPUT10
A2RADR
O:3703|T:3|I:2LV_VT_L1
INPUT11
LV_VT_L2
INPUT12
LV_VT_L3
INPUT13
DRA#-INPUT14
INPUT14
DRA#-INPUT15
INPUT15
DRA#-INPUT16
INPUT16
DRA#-INPUT17
INPUT17
DRA#-INPUT18
INPUT18
DRA#-INPUT19
INPUT19
DRA#-INPUT20
INPUT20
A4RADR
O:3705|T:3|I:487T_IDL1
INPUT31
87T_IDL2
INPUT32
87T_IDL3
INPUT33
87T_BIAS
INPUT34
87T_IDNSMAG
INPUT35
HV_87NT_IDIFF
INPUT36
HV_87NT_ANGLE
INPUT37
LV_87NT_IDIFF
INPUT38
LV_87NT_ANGLE
INPUT39
DRA#-INPUT40
INPUT40
PR01_AI1PR01_AI2PR01_AI3PR01_AI4PR02_AI1PR02_AI2PR02_AI3PR02_AI4PR16_90_L1GRP_OFFPR13_U_AI1PR13_U_AI2PR13_U_AI3PR13_U_AINGRP_OFFGRP_OFFGRP_OFFGRP_OFFGRP_OFFGRP_OFFT2D1_87T_IDL1T2D1_87T_IDL2T2D1_87T_IDL3T2D1_87T_IBIAST2D1_87T_IDNSMAGHV_87NT_IDIFFHV_87NT_ANGLELV_87NT_IDIFFLV_87NT_ANGLEREAL_ZERO
A A
B B
C C
D D
E E
1
1
2
2
3
3
4
4
5
5
6
6
7
7
8
8
Main Application: DREP_AI, Page: 1
Rev.Modification Rel. date Created by
Replacing
Based on
Project
Makumbusho
Responsible department
ABB Ltd.
Makumbusho.Substation.Voltage Level.T1
Technical reference Document kind
Graphical Application Configuration
Doc. designation
E1Q01FN1
Created by Title
T1
Document id.
Approved by Rev.
0
Rel. date
15.06.2023
Lang.
en
16 / 21
CMSQI
O:2820|T:100|I:1
I3P3I03I0RANG3I0ANGLI1I1RANGI1ANGLI2I2RANGI2ANGL
CMMXU
O:551|T:100|I:1
I3PIL1IL1RANGIL1ANGLIL2IL2RANGIL2ANGLIL3IL3RANGIL3ANGL
CMMXU
O:552|T:100|I:2
I3PIL1IL1RANGIL1ANGLIL2IL2RANGIL2ANGLIL3IL3RANGIL3ANGL
CMMXU
O:553|T:100|I:3I3PIL1IL1RANGIL1ANGLIL2IL2RANGIL2ANGLIL3IL3RANGIL3ANGL
CMSQI
O:2821|T:100|I:2
I3P3I03I0RANG3I0ANGLI1I1RANGI1ANGLI2I2RANGI2ANGL
VNMMXU
O:2840|T:100|I:1
U3PUL1UL1RANGUL1ANGLUL2UL2RANGUL2ANGLUL3UL3RANGUL3ANGL
VMMXU
O:2810|T:100|I:1U3PUL12UL12RANGUL12ANGLUL23UL23RANGUL23ANGLUL31UL31RANGUL31ANGL
VMSQI
O:2830|T:100|I:1
U3P3U03U0RANG3U0ANGLU1U1RANGU1ANGLU2U2RANGU2ANGL
CMMXU
O:554|T:100|I:4
I3PIL1IL1RANGIL1ANGLIL2IL2RANGIL2ANGLIL3IL3RANGIL3ANGL
CMMXU
O:555|T:100|I:5I3PIL1IL1RANGIL1ANGLIL2IL2RANGIL2ANGLIL3IL3RANGIL3ANGLPR14_51PT_51GPTPR14_51PT_51GPTPR15_51ST_51GSTPR16_90PR15_51ST_51GSTPR13_LV_UPR13_LV_UPR13_LV_UHV_NLV_N
A A
B B
C C
D D
E E
1
1
2
2
3
3
4
4
5
5
6
6
7
7
8
8
Main Application: MEASUREMENT, Page: 1
Rev.Modification Rel. date Created by
Replacing
Based on
Project
Makumbusho
Responsible department
ABB Ltd.
Makumbusho.Substation.Voltage Level.T1
Technical reference Document kind
Graphical Application Configuration
Doc. designation
E1Q01FN1
Created by Title
T1
Document id.
Approved by Rev.
0
Rel. date
15.06.2023
Lang.
en
18 / 21
SMBI
COMMON INPUT
O:152|T:3|I:3ACTIVE_GROUP1
VIn1
ACTIVE_GROUP2
VIn2
CHANGE_LOCK
VIn3
RESET_LEDS
VIn4
LED_TEST
VIn5
ACTIVATE TEST
VIn6
Not used
VIn7
Not used
VIn8
Not used
VIn9
Not used
VIn10
ACTIVE_GROUP1
BI1
ACTIVE_GROUP2
BI2
CHANGE_LOCK
BI3
RESET_LEDS
BI4
LED_TEST
BI5
ACTIVATE TEST
BI6
Not used
BI7
Not used
BI8
Not used
BI9
Not used
BI10
ActiveGroup
O:10|T:8|I:1ACTGRP1ACTGRP2ACTGRP3ACTGRP4ACTGRP5ACTGRP6GRP1GRP2GRP3GRP4GRP5GRP6SETCHGD
CHNGLCK
O:3000|T:100|I:1LOCK
LEDGEN
O:3600|T:3|I:1BLOCKRESETLEDTESTNEWINDACK
LocalHMI
O:3900|T:100|I:1CLRLEDSHMI-ONRED-SYELLOW-SYELLOW-FCLRPULSELEDSCLRD
INTERRSIG
O:16|T:1000|I:1FAILWARNINGCPUFAILCPUWARN
FXDSIGN
O:30|T:1|I:1OFFONINTZEROINTONEREALZEROSTRNULLZEROSMPLGRP_OFF
TIMEERR
O:15|T:1000|I:1TSYNCERRRTCERR
TIMER
O:213|T:3|I:1INPUTONOFF
TESTMODE
O:250|T:3|I:1INPUTACTIVEOUTPUTSETTINGNOEVENT ACTIVE_GROUP1ACTIVE_GROUP2CHANGE_LOCKRESET_LEDSLED_TESTACTIVATE_TESTMODEACTIVE_GROUP1ACTIVE_GROUP2FALSEFALSEFALSEFALSE ACGR-GRP1ACGR-SETCHGDCHANGE_LOCKFALSERESET_LEDSLED_TEST LHMI_LEDSCLRDIES_FAILIES_WARNINGFALSETRUEINT_ZEROINT_ONEREAL_ZEROGRP_OFFTIME_TSYNCERRTIME_RTCERRACTIVATE_TESTMODE TEST_ACTIVE
ACTIVE SETTING GROUP
LED MONITOR
ERROR SIGNALS
FIXED SIGNALS
TEST MODE ON/OFF
A A
B B
C C
D D
E E
1
1
2
2
3
3
4
4
5
5
6
6
7
7
8
8
Main Application: COMMON, Page: 1
Rev.Modification Rel. date Created by
Replacing
Based on
Project
Makumbusho
Responsible department
ABB Ltd.
Makumbusho.Substation.Voltage Level.T1
Technical reference Document kind
Graphical Application Configuration
Doc. designation
E1Q01FN1
Created by Title
T1
Document id.
Approved by Rev.
0
Rel. date
15.06.2023
Lang.
en
19 / 21
SINGLECMD
O:61|T:100|I:2BLOCKTEST 50PT1
OUT1
TEST 51PT1
OUT2
TEST 50GPT1
OUT3
TEST 51GPT1
OUT4
TEST 87T1
OUT5
TEST 87NT1
OUT6
TEST 50ST1
OUT7
TEST 51ST1
OUT8
TEST 50GST1
OUT9
TEST 51GST1
OUT10
:
OUT11
:
OUT12
:
OUT13
:
OUT14
:
OUT15
:
OUT16
SINGLECMD
O:62|T:100|I:3BLOCKTEST PARITY
OUT1
TEST ERROR BI
OUT2
TEST TAP BI1
OUT3
TEST TAP BI2
OUT4
TEST TAP BI3
OUT5
TEST TAP BI4
OUT6
TEST TAP BI5
OUT7
TEST TAP BI6
OUT8
:
OUT9
:
OUT10
:
OUT11
:
OUT12
:
OUT13
:
OUT14
:
OUT15
:
OUT16
FALSE TEST_50PTTEST_51PTTEST_50GPTTEST_51GPTTEST_87T1TEST_87NT1TEST_50STTEST_51STTEST_50GSTTEST_51GSTFALSE TEST_PARITYTEST_ERROR_BITEST_TAP_BI1TEST_TAP_BI2TEST_TAP_BI3TEST_TAP_BI4TEST_TAP_BI5TEST_TAP_BI6
A A
B B
C C
D D
E E
1
1
2
2
3
3
4
4
5
5
6
6
7
7
8
8
Main Application: TEST_OUTPUT, Page: 1
Rev.Modification Rel. date Created by
Replacing
Based on
Project
Makumbusho
Responsible department
ABB Ltd.
Makumbusho.Substation.Voltage Level.T1
Technical reference Document kind
Graphical Application Configuration
Doc. designation
E1Q01FN1
Created by Title
T1
Document id.
Approved by Rev.
0
Rel. date
15.06.2023
Lang.
en
20 / 21
VSGGIO
O:180|T:100|I:1BLOCKPSTOIPOS1IPOS2BLOCKEDPOSITIONPOS1POS2CMDPOS12CMDPOS21
VSGGIO
O:181|T:100|I:2BLOCKPSTOIPOS1IPOS2BLOCKEDPOSITIONPOS1POS2CMDPOS12CMDPOS21
VSGGIO
O:182|T:100|I:3BLOCKPSTOIPOS1IPOS2BLOCKEDPOSITIONPOS1POS2CMDPOS12CMDPOS21
SLGGIO
O:160|T:100|I:1
BLOCKPSTOUPDOWNSINGLE
SWPOS01
T1+T2
SWPOS02
T1+T5
SWPOS03
T1+T2+T5
SWPOS04
SLPOS#-OUT5
SWPOS05
SLPOS#-OUT6
SWPOS06
SLPOS#-OUT7
SWPOS07
SLPOS#-OUT8
SWPOS08
SLPOS#-OUT9
SWPOS09
SLPOS#-OUT10
SWPOS10
SLPOS#-OUT11
SWPOS11
SLPOS#-OUT12
SWPOS12
SLPOS#-OUT13
SWPOS13
SLPOS#-OUT14
SWPOS14
SLPOS#-OUT15
SWPOS15
SLPOS#-OUT16
SWPOS16
SLPOS#-OUT17
SWPOS17
SLPOS#-OUT18
SWPOS18
SLPOS#-OUT19
SWPOS19
SLPOS#-OUT20
SWPOS20
SLPOS#-OUT21
SWPOS21
SLPOS#-OUT22
SWPOS22
SLPOS#-OUT23
SWPOS23
SLPOS#-OUT24
SWPOS24
SLPOS#-OUT25
SWPOS25
SLPOS#-OUT26
SWPOS26
SLPOS#-OUT27
SWPOS27
SLPOS#-OUT28
SWPOS28
SLPOS#-OUT29
SWPOS29
SLPOS#-OUT30
SWPOS30
SLPOS#-OUT31
SWPOS31
SLPOS#-OUT32
SWPOS32
SWPOSN
OR
O:1003|T:100|I:153INPUT1INPUT2INPUT3INPUT4INPUT5INPUT6OUTNOUT
OR
O:1005|T:100|I:154INPUT1INPUT2INPUT3INPUT4INPUT5INPUT6OUTNOUT
OR
O:1007|T:100|I:155INPUT1INPUT2INPUT3INPUT4INPUT5INPUT6OUTNOUTFALSEINT_ONEAUTOMANUAL VS_MANUALVS_AUTOFALSEINT_ONE VS_SINGLEFALSEINT_ONEMASTERFOLLOWER VS_FOLLOWERVS_MASTERVS_T1_T2VS_T1_T5VS_T1_INT1[1]_T2PGT1[1]_T5PG
A A
B B
C C
D D
E E
1
1
2
2
3
3
4
4
5
5
6
6
7
7
8
8
Main Application: LHMI, Page: 1
Rev.Modification Rel. date Created by
Replacing
Based on
Project
Makumbusho
Responsible department
ABB Ltd.
Makumbusho.Substation.Voltage Level.T1
Technical reference Document kind
Graphical Application Configuration
Doc. designation
E1Q01FN1
Created by Title
T1
Document id.
Approved by Rev.
0
Rel. date
15.06.2023
Lang.
en
21 / 21