HVAC System in pharmaceuticals industries .ppt

TheRedEagle1 370 views 112 slides Jul 13, 2024
Slide 1
Slide 1 of 112
Slide 1
1
Slide 2
2
Slide 3
3
Slide 4
4
Slide 5
5
Slide 6
6
Slide 7
7
Slide 8
8
Slide 9
9
Slide 10
10
Slide 11
11
Slide 12
12
Slide 13
13
Slide 14
14
Slide 15
15
Slide 16
16
Slide 17
17
Slide 18
18
Slide 19
19
Slide 20
20
Slide 21
21
Slide 22
22
Slide 23
23
Slide 24
24
Slide 25
25
Slide 26
26
Slide 27
27
Slide 28
28
Slide 29
29
Slide 30
30
Slide 31
31
Slide 32
32
Slide 33
33
Slide 34
34
Slide 35
35
Slide 36
36
Slide 37
37
Slide 38
38
Slide 39
39
Slide 40
40
Slide 41
41
Slide 42
42
Slide 43
43
Slide 44
44
Slide 45
45
Slide 46
46
Slide 47
47
Slide 48
48
Slide 49
49
Slide 50
50
Slide 51
51
Slide 52
52
Slide 53
53
Slide 54
54
Slide 55
55
Slide 56
56
Slide 57
57
Slide 58
58
Slide 59
59
Slide 60
60
Slide 61
61
Slide 62
62
Slide 63
63
Slide 64
64
Slide 65
65
Slide 66
66
Slide 67
67
Slide 68
68
Slide 69
69
Slide 70
70
Slide 71
71
Slide 72
72
Slide 73
73
Slide 74
74
Slide 75
75
Slide 76
76
Slide 77
77
Slide 78
78
Slide 79
79
Slide 80
80
Slide 81
81
Slide 82
82
Slide 83
83
Slide 84
84
Slide 85
85
Slide 86
86
Slide 87
87
Slide 88
88
Slide 89
89
Slide 90
90
Slide 91
91
Slide 92
92
Slide 93
93
Slide 94
94
Slide 95
95
Slide 96
96
Slide 97
97
Slide 98
98
Slide 99
99
Slide 100
100
Slide 101
101
Slide 102
102
Slide 103
103
Slide 104
104
Slide 105
105
Slide 106
106
Slide 107
107
Slide 108
108
Slide 109
109
Slide 110
110
Slide 111
111
Slide 112
112

About This Presentation

hvac system


Slide Content

Infrastructure: Facilities, Utilities, Equipment in
GMP
Utilities
HVAC=Heat-Ventillation Air
conditioning system
Dr Mohamed Saad
Mohamed
FacilitiesChapter 27
Chapter 29 Utilities

The GMP requirements of 21CFR 211.46 stipulate
that
a)adequate ventilation shall be provided.
b)Equipment for adequate control over air pressure,
microorganisms, dust, humidity, and temperature
shall be provided when appropriate for the
manufacture, processing, packing, or holding of a
drug product.
c)Air filtration systems, including pre-filtersand
particulate matter air filters, to be used when
appropriate on air supplies to production areas.
2of 48
VENTILATION, AIR FILTRATION, AIR
HEATING AND COOLING (21 CFR
211.46)

If air is recirculated to production areas, measures shall
be taken to control recirculation of dust from
production. ?????
In areas where air contamination occurs during
production, exhaust systems or other systems
adequate to control contaminants are required.
d) Air-handling systems for the manufacture,
processing, and packing of penicillin are to be
completely separate from those for other drug
products for human use.
3of 48
VENTILATION, AIR FILTRATION, AIR
HEATING AND COOLING (21 CFR
211.46)

These systems should be closely monitored and
controlled.
A company should generate a schedule for cleaning
and maintaining air vents, ducts, and cooling
systems.
Human observation on a daily basis should also be
practiced. For example, visual observation of
blackened areas on vents is evidence that the
frequency of cleaning and maintenance needs to be
increased to avoid unwanted contaminants from
entering the area
4of 48
VENTILATION, AIR FILTRATION, AIR
HEATING AND COOLING

What can HVAC do?
Control airborne particles;
dust and micro-organisms –Thru air filtration using
high efficiency particulate air (HEPA) filters.
Maintain room pressure (delta P);
Areas that must remain “cleaner” than surrounding
areas must be kept under a “positive”
pressurization, meaning that air flow must be from
the “cleaner” area towards the adjoining space
(through doors or other openings) to reduce carry
over of airborne contamination.

Maintain space moisture (Relative Humidity);
Humidity is controlled by cooling air to dew
point=ىدنلا ةطقنtemperatures or by using desiccant
dehumidifiers.
Humidity can affect the efficacy and stability of
drugs and is sometimes important to effectively
mouldthe tablets.
Maintain temperature;
Temperature can affect production directly or
indirectly by fostering the growth of microbial
contaminants or uncomfortable environment for the
workers.
6
What can HVAC do?

What HVAC can’t do?
HVAC can not clean up the
surfaces of a contaminated room
or equipment.
HVAC can not compensate for
increased number of workers.
In designing the air-conditioning
system for pharmaceutical plants,
it is very important to study the
application, identify various
factors affecting the particulate
count and decide the level of
contamination that can be
permitted.

Specific facility and process criteria define the system
solutions that are provided, Such as;
Building construction and layout design.
Temperature and Moisture.
Air Cleanliness.
Pressurization.
Airflow pattern.
AIR CHANGES
Building Intake and Exhaust.
Cost Considerations.
System Design
Considerations

Building construction and layout
design
The internal generationof particles that consists of
those from building elements such as walls, floor,
ceiling, etc., from equipment, and most importantly
from operators can disrupt the cleanliness level.
The building construction itself has to be "tight" with
minimum of uncontrolled infiltration and leakages.
Proper building design and planning of the flow of
personnel, material and equipment is essential for
achieving and maintaining the designed levels of
cleanliness and pressure gradients.
9

Temperature and Moisture
Space and process temperature and moisture
conditions are generally determined by the product or
process performed.
Personnel comfort is also important, though
secondary to the product requirements.
Uncomfortable operators are more prone to commit
errors
If products or processes are sensitive to moisture
and may even attract moisture hydroscopically, an
independent enclosed environment is often provided
(Level 3 protection).
10

Areas are designed to provide room temperatures from
67 (20 °C) and 77°F (25 °C)with a control point of 72°F
(22 °C).
While most of the areas could have a RH of 50 ±5%.
Facilities designed for handling hygroscopic powders
need to be at 30 ±5%
Relative humidity ranges must be carefully Selected;
Continuous relative humidity levels below 15% can
cause static electricity discharge, health concerns,
and brittle hard gelatin capsule.
Humidity levels above 60%can be the source of
microbial growth, support corrosion, and sticking of
tablets.
11
Temperature and Moisture

HVAC Equipment is designed to meet the indoor
design criteria based on outdoor conditions and the
capacityof the equipment.
If outdoor conditions are chosen too conservatively,
the equipment will be oversized, costing more than
required and possibly requiring more energy for
operation.
If not, space or process conditions may not be met
12
Temperature and Moisture

Air Cleanliness
The level of acceptable airborne contamination
within the space must be identified, whether
supporting product quality or employee safety.
The resulting environmental cleanliness is
determined by several factors:
The quality of air introduced into the space.
The quantity of air introduced into the space.
The effectiveness of air distribution through the
space.
The effectiveness of the removal of the air
contaminants.
13

Removal of the contaminant as close to its source
is always the most effective method of
contamination control—
Whether it is central filtration at an air handling
unit before supply to the facility.
Or dust collection at a point source of
contamination within a space.
14
Air Cleanliness

Pressurization
Space relative pressurization will be determined primarily
by Requirements and Characteristics of the product that
may adversely effect personnel.
Where product contamination control is required, the
space relative pressurization must be designed to assure
that the movement of filtrated air is from the clean to the
less clean areas.
For a space requiring positive pressurization, the return
air volume is typically 15% less than the total supply
air volume.
A pressure differential of at least 0.05 inches water gage
( 12.45 Pascal) with all doors closed is preferable
between spaces with a pressure differential requirement.
15

Typical Space Pressurization Configuratio
16
Pressurization

AIRFLOW PATTERN
The air distribution has to be appropriate with the
class of cleanroom.
Air turbulence in the space can cause particulates
which have settled onto the floor and work surfaces
to become re-entrained in the air.
Air turbulence is greatly influenced by the
configuration of air supply and return grilles, people
traffic and process equipment layout.
17

The following measures are normally taken to control the
air flow pattern and hence the pressure gradient of the
sterile area:
Class 100 and lower zones must necessarily have
unidirectional (laminar) flow with 100% HEPA filter
coverage in the ceiling or wall, and Return must be
picked up from the opposite side.
Air flow velocities of 90 fpm ±20 (70 fpm to 110 fpm)
(0.45 m/s) are recommended as standard design for
Class 100 cleanroom systems.
Class 1000 and above are generally non-unidirectional
with the supply air outlets at the ceiling level and the
return air at the floor level.
18
AIRFLOW PATTERN

AIR CHANGE RATES
Air change rate is a measure of how quickly the air
in an interior space is replaced by outside (or
conditioned) air.
Air flow rate/min = Air changes x Volume of space/
60
Even though various design guidelines and
standards are available, there is no clear-cut
guidance for air changes per hour especially for
“sterile areas”.
The goal is to achieve desired particulate
cleanliness levels and stay at or above a 20 air
changes/h minimum.
19

20
RECOMMENDED AIR CHANGE
RATES
Iso
14644-4 :
2001
NA
70-160
30-70
10-20

Building Intake and Exhaust
Careful attention must be paid to the incoming
system air quality.
This can be specific to the area in which the facility
has been constructed such as an agrarian or
industrial area.
An industrial area may have a more corrosive or
chemical laden air quality and an agrarian area may
have a higher level of seasonal air borne particulate
and bio-burden.
These issues must be carefully considered when
selecting filtration systems so as to minimize the
possibility of product contamination.
21

Most often, however, building effluent re-
entrainment is the greater problem.
Careful consideration must be made as to the
impacts of building exhaust and relief systems,
loading docks and other incidences of vehicle
exhaust and electrical generator exhaust.
Analysis must be made of the subject building’s
impact on itself and other surrounding buildings.
22
Building Intake and Exhaust

Cost Considerations
Pharmaceutical manufacturing facilities, utilities and
processes are extremely costly to design, construct,
and operate.
When designing those, careful consideration must
be made of the initial construction cost, balanced
against life cycle operating costs.
A cost cutting measure taken during the initial
capital expenditure can multiply into huge operating
costs by years of inefficient operation.
23

General
Design of HVAC is dependent on required degree
of air cleanliness
Suitable components should be selected including:
AHU
ducts
grilles, etc.
HVAC Components

FilterSilencer
Terminal filter
Weather louvre
Control damper
FanFlow rate controller
Humidifier
Heating
coil
Cooling coil
with droplet
separator
Production Room
+
Prefilter
Exhaust Air Grille
Heater
Secondary Filter
Recirculated air
Overview components

Weather Louvre
Silencer
Flow rate
controller
Control damper
To prevent insects, leaves, dirt and
rain from entering
To reduce noise caused by air
circulation
Automated adjustment of volume of
air (night and day, pressure control)
Fixed adjustment of volume of air
Components (1)
HVAC Components

Heating unit
Coolingunit/
dehumidifier
Humidifier
Filters
Ducts
To heat the air to the proper
temperature
To cool the air to the required
temperature or to remove moisture
from the air
To bring the air to the proper
humidity, if too low.
To eliminate particles of
predetermined dimensions and/or
microorganisms
To transport the air
Components (2)
HVAC Components

What is the definition of the
AHU
A factory-made encased assembly consisting
of a fan or fans and other necessary equipment
to perform one or more of the functions of
circulating, conditioning, and cleaning of air

For pharmaceutical applications the unit casing
must be a double skin sandwich of metal with
insulation between the metal sheets to provide a
smooth, cleanable interior surface that does not
foster the growth of organisms.
Units should contain access doors, view ports,
electrical convenience outlets, and interior lighting
for maintenance.
The casings should be tightly sealed and designed
for high system air pressures required for
pharmaceutical applications.
29
What is the AHU

All sealants and lubricants exposed to the airstream
should be food grade to minimize the chance of air
contamination.
To avoid cross contamination independent air
handling systems should be provided for various
discrete operations like manufacturing, coating,
tableting, inspection and packing.
In some departments there is further segregation of
operations which requires a certain degree of
control, if not an altogether independent air handling
unit.
30
What is the definition of the
AHU

31
What is the definition of the
AHU

How its work
The flow passes through a damper, which can be
opened or closed to allow air to be taken into the unit.
The air is subsequently filteredand passed through coils
that heat, cool, and dehumidify the flow.
It should be noted that these coils are filled with primary
hot or chilled water from the boiler or chiller, respectively.
The treated air, at the desired temperature and relative
humidity, is subsequently passed through a centrifugal
fan before it is directed to indoor spaces at the desired
flow rate using supply dampers.

AHU

Schematic of Air-Handler
Air-handling unit

Components in AHU may include, depending on need:
Dampers.
Fans; No fan failure; including supply air fans,
return air fans, exhaust air fan
Dehumidifiers; Drying of air with chemical driers,
e.g. rotating desiccant wheel
Humidifiers
Coils; for heating and cooling air
Filters.
Ducts.
Diffusers.
AHU Components

Filter Pressure
Gauges
AHU with fan Variable
Speed Controller
Dampers
•These dampers are located on
the suction side of the air fan.
•Proper access should be
provided in each section of the
air handling unit for routine
maintenance and cleaning.
•100% intake damper is
especially useful during
“defumigation” operation
discussed later in the course.

Supply Blower Section
Centrifugal fan is used to
circulate the air to the various
parts of the sections in the
building.
The selection of the fan will
depend on the air volume and
the static pressure required ( to
compensate the back pressure
of HEPA filters ) of the system.
Usually, the designer of the
system will use a specialized
software to do this selection.

Dehumidifiers
Dehumidifiers are used to control relative humidity (RH)
to lower levels.
RH of 50±5% can be achieved by cooling the air to the
appropriate dewpoint temperature.
When chilled water is supplied at 5-7 °c to the cooling
coils, a minimum dew point of about 10-11°c can be
obtained.
This results in a minimum room relative humidity of
approximately 50% at 21.11°c.

Dehumidifiers
In some cases where hygroscopic (products sensitive to
moisture) materials are handled, the room RH
requirement may be as low as 30 to 35% and may
require the use of chemical dehumidifiers.
Desiccant dehumidifiers work by drawing air across a rotating
wheel containing an absorption material, such as silica gel.
As the air passes through the wheel, moisture is removed, the
wheel continues to rotate and is dried out using built in
heaters, then continues to remove more moisture form the air.
They are often used in conjunction with heaters to boost the
drying process especially in cold weather conditions.

De-humidification
Filter Pressure
Gauges
AHU with fan Variable
Speed Controller
Humid room air
Air heater
Regeneration air
Humid room air
Adsorber wheel
Dry air
Dehumidifiers

Humidifiers
In drier locations, makeup air may require the addition of
moisture for RH control.
There are many commercially available humidifiers, but
the most commonly used is “steam grid” humidifier.
These are controlled by modulation of a steam valve at
the humidifier, and include a chamber ( mix box) to
prevent condensation and water droplets in the duct.
It is important to use clean steam, not plant steam, which
may contain boiler chemicals and impurities from
deteriorating piping and equipment.

Heating and Cooling Coil
Cooling Coil is used to cool and dehumidify the air.
Both DX (direct expansion) cooling and CW (chilled water)
cooling coils are available for use depending on the system
design.
Chilled water or propylene glycol solutions are generally
used for cooling and dehumidification.
Direct expansion refrigerant (DX), in which the refrigerant is
in the air unit coil, may be used, but these systems are less
reliable than chilled water or glycol and are more difficult to
control in the narrow air temperature ranges required with
higher running cost.
In case of a heating coil, at least a 0.5 meter space should
be kept between coils.

43
Heating and Cooling Coil

Filters
Proper air filtration is crucial for cleanroom controls.
In dusty production areas such as grinding,
granulation, coating, tableting etc., the filters not only
control the atmosphere contamination but also hold
the internally generated particulates.
Atmospheric dust is a mixture of dry particles, fibers,
mist, smoke, fumes, live or dead organisms.
The air-borne particle size varies from 0.01 micron
to as much as 100 microns.

Less than 10 micron particles are considered as
fine and particles over 10 micron is regarded as
“coarse”.
Fine particles have longer airborne life time and
could settle on vertical surfaces.
Coarse particles, products of mechanical abrasion
like in grinding and granulation departments, have
lower airborne life time and are subject to
gravitational settlement.
The air conditioning systems in the pharmaceutical
industry have to handle both fine and coarse
particulates
45
Filters

Filters
Air Filters
Air filters capture solid materials Can be
“roughing” filter to capture a significant percentage
of total mass (30%)
“high efficiency” to capture a higher percentage of
mass, plus some of the “weightless” fine particles
(85% -95%)
“high efficiency particulate” to remove virtually
100% of the material weight and 99.97% or more
of all particles

Filter classes
Dust filters
Standard Aerosol
FineCoarse ULPAHEPA
10 µ m > Dp > 1 µ mDp > 10 µ m Dp < 1 µ m
F5 -F9G1 -G4 U 14-17H 11 -13
EN 1822 StandardEN 779 Standard
Filters

48
Primary panel filter Secondary filter
HEPA or tertiary filter
Filters

Average Efficiency
Integral Value
Peak Arrestance
Local Value
Retention in
%
Penetration Efficiency Penetration
F9 85 0.15
H11 95 0.05
H12 99.5 5x10
-3
97.5 25x10
-3

H13 99.95 5x10
-4
99.75 25x10
-4

U14 99.995 5x10
-5
99.975 25x10
-5



Classification of filters according to their efficiency Filters

In order to prolong the service life of HEPA filters,
pre-filters are recommended to filter out majority of
particles above 1 micron.
The filtration regime is generally three stages
with two stages of pre-filters, 10 micron (EU 4),
3 micron (EU 9) and one central final filter 0.3
micron (EU 13)
Along with terminal HEPA filter if class c is
required..??
Pre-filters to HEPA Filters

A closer look at HEPA filters

HEPA (High efficiency particulate air) filters have
99.97% to 99.997% removal efficiency on 0.3µ
particles.
In other words, only less than 0.03% of all particles
of 0.3 microns or larger can get through such a filter.
So if the return air contains 10,000 particles per ft
3
,
its concentration would be reduced down to three
particles per ft
3
after it goes through the filter.
52
High Efficiency Particulate Air
(HEPA)

AHU
Prefilter
Final filter
21
Centrally mounted filters
Positioning of filters
Class D Class D

Prefilter
AHU
Main filter
1
2 3
Low level exhausts
Ceiling
exhausts
Terminal Positioning of filters
Positioning of filters
Class B Class A
Class C

Examples of levels of protection (based on ISPE oral
solid dosage (OSD) Guideline criteria)
55
Level Condition Example of area
Level 1 General Area with normal housekeeping and maintenance
where there is no potential for product
contamination, e.g. warehousing.
Level 2 ProtectedArea in which steps are taken to protect the
pharmaceutical starting material or product from
direct or indirect contamination or degradation, e.g.
e.g. secondary packing, warehousing, first stage
change rooms.
Level 3 ControlledArea in which specific environmental conditions are
are defined, controlled and monitored to prevent
contamination ordegradation of the pharmaceutical
pharmaceutical starting material or product, e.g.
where product, starting materials and components
are exposed to the room environment; plus
equipment wash and storage areas for equipment
product contact parts.

Levels of protection and recommended
filtration
56
Level of protection Recommended filtration
Level 1 Primary filters only (e.g. EN 779 G4 filters)
Level 2 Protected areas operating on 100% outside
air: primary plus secondary filters (e.g. EN
779 G4 plus F8 or F9 filters)
Level 3 Production facility operating on recirculated
plus ambient air, where potential for cross-
contamination exists: Primary plus
secondary plus tertiary filters (e.g. EN 779
G4 plus F8 plus EN 1822 H13 filters) (for full
full fresh air system, without recirculation,
G4 and F8 or F9 filters are acceptable)

Exhaust Fans
Building exhausts are generally collected and
ducted to exhaust fans in groups or clusters.
Fumes and toxic exhausts should be extended
through the roof and terminated well above the roof
line in a suitable stack head.
Extremely toxic or dangerous active biological
agents may require HEPA filtration, before exhaust
to the atmosphere.

Return fans
Are recommended on systems with long duct
returns to minimize suction pressure required from
the supply fan.
If a return fan is not used, the capacity of the supply
fan can be overextended and it may be difficult to
limit and properly control the amount of outside air
being admitted to the unit.
Return fans are also needed when required to
provide a negative pressure in rooms that require
containment.

Return fans

Air Handling Unit Location
Air handling systems should be located on a
separate equipment floor or zone in order to
facilitate service and maintenance.
They should also be located as close as possible to
the main rooms they are serving to minimize larger
and longer duct runs.
Location of outdoor air-inlet louvers must be
carefully considered.

Air Handling Unit Location
Intakes should be located on the building sidewall
high off the ground to minimize dust intake.
Intakes should also be away from truck docks or
parking lots, where undesirable fumes and
particulate are generated.
In locating inlets the prevailing winds should also be
considered, and any nearby exhausts or fume
concentrations should be avoided to prevent
recirculation of exhaust air back into the supply
system.

Air Handling Unit Location

Air Handling Unit Location

Duct materials and shape
Unlined galvanized steel, stainless steel or aluminum
ductwork is used in rectangular, round, and elliptical (or flat
oval) configurations for the majority of the systems.
Round ducting is a natural choice, being self cleaning in
shape,
When the HEPA filter is located upstream of the room terminal
and a long run of duct is present, the material of choice for the
duct is stainless steel, but this is expensive and its use should
be minimized.
Many systems may also be fumigated or cleaned in place,
and the duct material chosen should not be affected by the
cleaning agent.

65
Duct materials and shape

Grilles and Diffusers
Agrilleis a device for supplying or extracting
air vertically without anydeflection.
Adiffusernormally has profiled blades
todirectthe air at an angle as it leaves the unit
into the space.

Grilles and Diffusers can be manufactured in:
ALUMINUM
Mild steel
Stainless steel
Plastic
Air Grilles and Diffusers should be selected of materials
that are non-flaking, non-oxidizing, and are easily wiped
clean.
Return Grilles are also an important consideration and
are generally located low in the walls for cleanrooms.
easily wiped clean.
Grilles and Diffusers

Grilles and diffusers may be mounted inceilings,
floors, walls, doorsand inducts.
Floors grilles tend to be especially strong to
withstand foot traffic.
Supply air outlets are mounted flush at the ceiling
level with perforated stainless steel grilles even if
terminal absolute filters.
Grilles and Diffusers

Grilles and Diffusers

Grilles and Diffusers

Low induction
swirl diffusor
(preferred)
High induction
office type diffusor
(avoid)
Grilles and Diffusers

Supply air diffusers should be selected with care
taking consideration of, e.g. room requirements and
positions of equipment and operators in the room.
Supply air diffusers of the high induction type (e.g.
those typically used for office-type air-conditioning)
should where possible not be used in clean areas
where dust is liberated.
Air diffusers should be of the non-induction type,
introducing air with the least amount of induction so
as to maximize the flushing effect.
Grilles and Diffusers

In rooms where the process results in high dust
liberation; perforated plates or low induction swirl
diffusers with low level extract or return should be
used (to contain the dust at the lower level of the
room)
In cases where dust liberation is low, ceiling return air
grilles may be acceptable.
Grilles and Diffusers

AHU Pharmaceutical
requirements
In order to meet the pharmaceutical requirements
the AHU`s should fulfill the following material
specification:
Heating and cooling coils made of aluminum fins
with copper pipes The cooling coils are removable
The frame of the coils will be galvanized steel
The inner surface of the Air Handling Units and
the dampers will be galvanized steel or epoxy
coated
Face velocity across coils is about 2.5m/s

The pressure drop over the filter units will be
measured local.
All equipment (coils, fan, filters) will be accessible
via doors
All sections which are accessible are illuminated
and visible from the outside via small windows
Frequency converters must start the fans
automatically in case of problem in electric supply.
AHU Pharmaceutical
requirements

Consider different air types, e.g.:
Fresh air (make-up air)
Supply air
Return air (re-circulated air)
Exhaust air
And: Concepts of air delivery to production areas:
Once –thru Air(Ttal fresh-air systems) –Air is
conditioned, enters the space and is discarded
Recirculation systems -Air is conditioned, enters the
space and portion is reconditioned. Some may be
discarded.
Air Types

+
Production Room
Exhaust
air
Return air
(recirculated)
Fresh air
(make-up air)
Supply
air
Air Types

100% fresh air -normally where toxic products
are processed, and recirculation not
recommended.
No contamination from fresh air –sufficient
filtration needed.
Degree of filtration on exhaust dependent on
exhaust air contaminants and environment
regulations( usually through HEPA filter).
Once –Thru HVAC
Total fresh-air systems

Ventilation with 100% fresh air (no air recirculation)
W
Washer (optional)
Central Air-Handling Unit
Production Rooms
Exhaust Unit
Once –Thru HVAC
Total fresh-air systems

Disadvantages
Expensive to operate, especially when cooling and heating.
Filter loading very high = frequent replacement.
Potential need for dust collection/scrubbers/cleanouts in
exhaust line.
Applications
Labs with hoods, potential hazards
Bulk Pharmaceutical Chemical (API) plants handling
flammable materials.
Oral Solid Dosage (OSD) plants where potent
products/materials exposed.
Where high potential of product cross-contamination –
segregation
Once –Thru HVAC
Total fresh-air systems

81of 48
Once –Thru HVAC
Total fresh-air systems

In pharmaceutical facilities large quantities of air may
be required to promote air cleanliness.
In many cases the large quantities of air exceed the
requirements for cooling, so it is desirable and
possible to recirculate air within the space and only
pass enough air through the air handling unit to
perform the heating or cooling.
The requirements ” There should be no risk of
contamination and cross-contamination when air is re-
circulated.”
HEPA filters placed in AHU or terminally.
Dust from highly toxic processes should not be re-
circulated
Recirculation systems

Ventilation with recirculated air + make-up air
Central Air-Handling Unit
Return air
Exhaust Unit
Recirculation systems

84of 48
Recirculation systems

What are advantages here?
Usually less air filter loading = lower filter
maintenance.
Opportunity for better air filtration.
Less challenge to HVAC = better control of
parameters (T, RH, etc).
lower cooling/heating cost.
85
Recirculation systems

Disadvantages
Chance of cross contamination = requires
adequate supply air filtration.
Applications
Classified spaces such as sterile manufacture
(few airborne materials, very clean return air)
Finished oral solid dosage (OSD) manufacture in
single product facility or segregated areas.
86
Recirculation systems

HVAC automation system
provides
HVAC automation system provides:
Automatic emergency shutdown of ventilation and
air conditioning systems in case of a fire alarm.
Automatic protection of coils against freezing.
Maintain the required environmental conditions in
rooms.

BMS
88

BMS and EMS Systems
The automatic control system that controls and monitors the
HVAC system is called by many names: the automatic
temperature control system (ATC), the energy management
and control system (EMCS), the building automation system
(BAS), or the building management system (BMS).
A BMS, also referred to as a Building Automation System
(BAS), is a computer based control system installed in
facilities to control and monitor the facilities’ mechanical and
electrical equipment such as heating, cooling, ventilation,
lighting, power, fire, and security systems.
In industries like aseptic manufacturing of pharmaceutical
medicinal products, facilities require Control (BMS) and
Monitoring (EMS) solutions.

An EMS monitors environmental conditions that are
deemed GMP-critical, including parameters such as
particle counts, humidity, temperature, and pressure and
to monitor and record critical data logging of support
equipment such as fridges, freezers, incubators, or
product warehouse storage.
All are GMP-critical for product release based on set
parameters for environmental and support equipment not
exceeding certain alarm set-points during the product
life-cycle from production to shipping.
Some EMS systems utilize data logging sensors to
monitor transportation environments for products where
set environmental conditions must remain stable during
transport.
BMS and EMS Systems

Combining a BMS and an EMS
Combining BMS and EMS requires a well-planned
risk assessment from conceptual design to
validation of the critical sensor devices that monitor
critical environmental parameters.
Unfortunately, the level of risk becomes a question
of reliability when the control sensor is also used as
the monitoring sensor.
Since the control aspect of the system is also the
GMP monitoring solution, there are some issues.

If the control sensor was to drift, it would go on
unnoticed.
Since most BMS system users do not regularly
calibrate the sensors, the chances of drift issues
becomes greater.
With a separate EMS sensor, the drift would be
picked up immediately and when alarm limits exceed
the operating set-points, a responsible person would
be notified.
Combining a BMS and an EMS

Another issue surrounding the use of a BMS and providing
GMP data is FDA 21 CFR Part 11 compliance. Many BMS
systems have not been designed to meet FDA 21CFR11
compliance and therefore the data could be rejected as true
compliant GMP data.
EMS systems require strict security access control,
including audit trail, electronic records, and electronic
signatures in line with FDA 21 CFR Part 11 and PIC/S
Annex 11 on Computerized systems.
If a BMS control system was also used to provide GMP
data, data integrity risks cannot be ignored, especially when
FDA and other regulatory bodies are scrutinizing data
integrity and validation.
Combining a BMS and an EMS

The Advantages of Separate BMS and
EMS
The advantages of segregating a BMS and an EMS
should be considered and below are some of those
advantages outlined:
With the EMS, all GMP data from critical environmental
locations is logged and stored on a secure database
that is backed up.
The BMS does not require full validation however, it will
require a level of commissioning to verify control limits
and functions are working correctly.
Having separate systems only requires validation of the
EMS system.

The Advantages of Separate BMS and
EMS
If the BMS system experiences a software or sensor
failure, the EMS would continue to keep data records
from critical locations. For example, if product storage
equipment like a refrigerator was compromised, the
EMS would verify if the environment was compromised,
allowing for informed decisions to be made regarding
the release or rejection of valuable product.
This is critical when there are temperature-sensitive
products.
Regulatory auditors have been known to write up
deviations where a BMS are also designed to provide
GMP data.

EMS Minimum Requirements
There are many EMS vendors on the market, so
choosing the right EMS is important, especially when
much ground work and research is required. The
following is a list of attributes an EMS should possess:
Capable of immediate alert and action alarm
notifications.
Provide a full audit trail capability,
Designed to be FDA 21 CFR Part 11 and PIC/s Annex
11 compliant,
Possess a redundancy and back-up system
automatically,

Commissioning
Commissioning, as defined in the ASHRAE Guideline 1-
1996, is: The process of ensuring that systems are
designed, installed, functionally tested, and capable of
being operated and maintained to perform in conformity
with the design intent . . .
Commissioning begins with planning and includes
design, construction, setting up, balancing, testing,
acceptance and training.
Precursor to qualification

BALANCING
For pharmaceutical facilities, establishing pressure
differentials between adjacent spaces is the most critical and
is very tedious to balance.
These differentials are obtained by adjusting airflows, smoke
tests, taking pressure readings, and setting controls.
This effort can take some time as each facility is different and
each room has different leakage characteristics that affect
pressurization.
As part of the balancing, you may find that the duct systems
or rooms are not as tight as designed and may require
additional sealing to obtain the required pressure
differentials.

A simple solution to many pressurization problems
is to keep increasing outdoor air to the system.
This can lead to problems, if design values are
exceeded, with heating or cooling coils not
meeting this need, resulting in off-design room
temperatures and humidity levels.
Therefore, the best solution first is to tighten the
spaces.
The optimum time to balance is when few
construction workers or facility personnel are in
the spaces.
The balance should be done with all doors closed,
since opening and closing results in system
pressure upsets and make balancing difficult.
BALANCING

Typical tests to be conducted after commissioning :
Temperature
Relative humidity
Supply, return and exhaust air quantities
Room air change rates
Room pressures (pressure differentials)
Room clean-up rate
Particulate matter, microbial matter (viable and non-viable)
HEPA filter penetration tests
Containment system velocity
Warning/alarm systems
Testing

VALIDATION
NO production can start until the cleanrooms is
validated.
When a pharmaceutical facility is to be validated, the
validating agency will peruse the HVAC documentation
and should communicate with the design engineers to
establish the validation protocol.
The physical parameters reported by the BMS system
shall be verified by measurements using calibrated
instruments to verify accuracy.
Usually done by third party to verify the correct function
of the system

DOCUMENTATION
The documentation should cover
Design qualification
Installation qualification
Operation qualification
Performance qualification
See also full guidelines on "Validation" in WHO TRS No
937, 2005, Annex 4.

Tests to demonstrate compliance TRS961 Annex 5
103
Test parameter Test procedure
Particle count test
(Verification of
cleanliness)
Dust particle counts to be carried out and result
printouts produced.
No. ofreadings and positions of tests to be in
accordance with ISO 14644-1 Annex B5
Air pressure difference
(To verify non cross-
contamination)
Log of pressure differential readings to be
produced or critical plants should be logged
daily, preferably continuously. A 15 Pa pressure
differential between different zones is
recommended. I
n accordancewith ISO 14644-3 Annex B5
Airflow volume
(To verifyair change
rates)
Airflow readings for supply air and return air
grilles to be measured and air change rates to be
be calculated.
In accordancewith ISO 14644-3 Annex B13

104
Test parameter Test procedure
Airflow velocity
(To verifyunidirectional
flow or containment
conditions)
Air velocities for containment systems and
unidirectional flow protection systems to be
measured.
In accordancewith ISO 14644-3 Annex B4
Filter leakage tests
(To verifyfilter
integrity)
Filter penetration tests to be carried out by a
competent person to demonstrate filter media,
filter seal and filter frame integrity. Only required
on HEPA filters.
In accordancewith ISO 14644-3 Annex B6
Containment leakage
(To verify absence of
cross-contamination)
Demonstrate that contaminant is maintained
within a room by means of: airflow direction
smoke tests room air pressures.
In accordancewith ISO 14644-3 Annex B4
Tests to demonstrate compliance TRS961 Annex 5

105
Test parameter Test procedure
Recovery
(To verifyclean-up
time)
Test to establish time that a cleanroom takes to
recover from a contaminated condition to the
specified cleanroom condition. Should not take
more than 15 min.
In accordancewith ISO 14644-3 Annex B13*
Airflow visualization
(To verify required
airflow patterns)
Tests to demonstrate air flows:
•from cleanto dirty areas
•do not cause cross-contaminationuniformly from
unidirectional airflow units Demonstrated by
actual or video-taped smoke tests.
•In accordance with ISO 14644-3 Annex B7
Tests to demonstrate compliance TRS961 Annex 5

See also ISO 14644 -2 fo
Requalification, and change control.
Tests performed according to protocols and
procedures for the tests.
Results recorded and presented in report (source
data kept).
Traceability, e.g. devices and standards used,
calibration records; and conditions specified.
HVAC Qualification

Schedule of testing to demonstrate compliance with
particle concentration limits
107of 48
ClassificationMaximum time interval Test method
≤ ISO Class 5 6 months Annex B in ISO 14644-1:1999
> ISO Class 5 12 months Annex B in ISO 14644-1:1999
NOTE Particle count tests will normally be performed in the operational state, but may
also be performed in the at-rest state in accordance with the designated ISO
classification.
ISO 14644-2:2000

Schedule of additional tests for all classes
108of 48
Test parameter Maximum time
interval
Test procedure
Airflow volume a or airflow
velocity
12 months ISO 14644-3:—, clause B.4
Air pressure difference 12 months ISO 14644-3:—, clause B.5
NOTE These tests may normally be performed in either the operational or at-rest
state in accordance with the designated ISO classification.
a. Airflow volume may be determined by either velocity or volume measurement
techniques.
b. This test will not apply to clean zones which are not totally enclosed.
ISO 14644-2:2000

Schedule of optional tests
109of 48
Test parameter Class Suggested
maximum time
interval
Test procedure
Installed filter
leakage
All classes 24 months ISO 14644-3:—, clause
B.6
Airflow
visualization
All classes 24 months ISO 14644-3:—, clause
B.7
Recovery All classes 24 months ISO 14644-3:—, clause
B.13
Containment
leakage
All classes 24 months ISO 14644-3:—, clause
B.14
ISO 14644-2:2000

Maintenance
Procedure, programme and records for planned
preventative maintenance
e.g. cleaning of filters, calibration of devices
Appropriate training for personnel
Change of HEPA filters by suitably trained persons
Impact of maintenance on:
Product quality
Qualification

Verification of design documentation, including
description of installation and functions
specification of the requirements
Operating procedures
Maintenance instructions
Maintenance records
Training logs
Environmental records
Discussion on actions if OOS values
On site verification (walking around the site)
Inspecting the air-handling
system