Hydropower plants.pdf

9,242 views 23 slides Oct 06, 2023
Slide 1
Slide 1 of 23
Slide 1
1
Slide 2
2
Slide 3
3
Slide 4
4
Slide 5
5
Slide 6
6
Slide 7
7
Slide 8
8
Slide 9
9
Slide 10
10
Slide 11
11
Slide 12
12
Slide 13
13
Slide 14
14
Slide 15
15
Slide 16
16
Slide 17
17
Slide 18
18
Slide 19
19
Slide 20
20
Slide 21
21
Slide 22
22
Slide 23
23

About This Presentation

What is a hydroelectric power plant, Classification of hyropower plants, site selection, advantages and disadvantages


Slide Content

Hydroelectric
Power Plants
Prepared by
Ankur Sachdeva
Assistant Professor, ME

•Hydropowerorwaterpowerispowerderivedfromtheenergyoffallingorfast-running
water,whichmaybeharnessedforusefulpurposes.
•Sinceancienttimes,hydropowerfrommanykindsofwatermillshasbeenusedas
arenewableenergysourceforirrigationandtheoperationofvariousmechanicaldevices,
suchasgristmills,sawmills,textilemills,triphammers,dockcranes,domesticliftsetc.
•Hydroprojectsaredevelopedforthefollowingpurposes:
1. To control the floods in the rivers.
2. Generation of power.
3. Storage of irrigation water.
4. Storage of the drinking water supply.
HYDROPOWER

Working Principle of Hydroelectric Power Plant
•HydroelectricpowerisdevelopedfromHydroelectricPowerPlantorHydroelectricPowerStation.
•Itdevelopshydroelectricitytoutilizethepotentialenergyofwater.
•Inhydroelectricpowerplants,waterisstoredinadamcalledhydroelectricdamwhichislocatedupperlevelfrom
theground,especiallyanyhillyareas.
•Waterheadiscreatedbyconstructionofthedamacrossanyriverorlake.
•Thistypeofwaterheadstoreshugepotentialenergy.
•Thewaterfallsintowaterturbineandthepotentialenergyofwaterisconvertedintokineticenergy.
•Thiskineticenergyisconvertedintomechanicalenergyattheturbineshaft.
•Ahydroelectricgeneratororalternatoriscoupledwithturbineshafttoconvertmechanicalenergyintoelectrical
energy.
•ThepowerPisdeveloped-

1. Since water is the main source of energy, so no fossil fuels are required.
2. This plant is neat and clean and no smoke or as disposal is required.
3. It is the cheapest operating and maintenance cost as compared to the other power plants because water is
freely available in the world.
4. It is very reliable, and robust and has a longer life app rocks 45 to 60 years.
5. This plant can start instantly.
6. It can start hydroelectric power with fluctuating load demand.
7. The efficiency does not fall at the age of this plant.
8. There is no standby loss in this plant.
9. At the initial time of construction highly skilled engineers are required and after that only few
experienced persons can run the plant.
10. This plant also serves to help in irrigation and Flood control etc.
11. Since these plants are located in remote areas, so land is available and competitively cheaper rates.
ADVANTAGES OF HYDROPOWER PLANT

DISADVANTAGES OF HYDROPOWER PLANT
1.Thecapitalcostoftheplantisveryhigh.
2.Thehydroelectricplanttakesmuchlongerindesignandexecution.
3.Theseplantsareusuallylocatedinhillyareasfarawayfromtheloadcenter.
4.Transformationandtransmissioncostsareveryhigh.
5.Theoutputofahydroelectricplantisneverconstantduetothevagariesof
monsoonsandtheirdependenceontherateofwaterflowinariver.

ESSENTIAL FEATURES OF A WATER -POWER PLANT
Theessentialfeaturesofawaterpowerplantareas
below:
1.Catchmentarea.
2.Reservoir.
3.Damandintakehouse.
4.Inletwaterway.
5.Powerhouse.
6.Tailraceoroutletwaterway.

LAYOUT OF HYDROPOWER PLANT

CLASSIFICATION OF HYDRO -PLANT

•Water must fall from a higher elevation to a lower one to release its stored energy.
•Thedifferencebetweentheseelevations(thewaterlevelintheforebayandtailbay)is
calledthehead.
•Threecategoriesofhydropowerplantbasedondesignheadvaluesare
❖High-head(100mandabove)
❖Medium-head(30mto100m)
❖Low-head(lessthan30m)
BASED ON THE AVAILABILITY OF HEAD

HIGH HEAD POWER PLANTS

•Ahydelplantwithawaterheadofmorethan100metersistermedahigh-headplant.
•Inthiscase,thewaterfromthemainreservoiriscarriedthroughtunnelsuptothe
surgetank,fromwhereitistakenthroughthepenstock.
•Sincethewaterheadisveryhightheeffectofthewaterhammeristoosevereinsuch
plants,itisessentialtoprovideasurgetankinthewaterlineattheappropriate
location.
•Thesurgetanktakescareoftheincreasinganddecreasingwaterlevelsduringthelow-
demandandhigh-demandperiods,respectively.
•TheFrancisandPeltonwheelturbinesaremostsuitableforhigh-headplants.

MEDIUM HEAD POWER PLANTS

•Ahydelplantwithawaterheadofintherangeof30to100metersistermedasa
mediumheadpowerplant.
•Theforebayprovidedatthebeginningofthepenstockservesaswaterreservoir.
•Thewaterisgenerallycarriedinopencanalsfrommainreservoirtotheforebayand
thentothepowerhousethroughthepenstock
•Theforebayitselfactsasthesurgetank,andhencereceivestheexcesswaterduringthe
lowdemandperiods.
•ThistypeofplantcommonlyusesFrancisturbines.

LOW HEAD HYDEL POWER PLANT

•Aplantwithawaterheadoflessthan30metersistermedalowheadplant.
•Nosurgetankisrequiredforthisplant,damitselfdischargethesurpluswaterfromthe
river
•Insuchplants,asmalldamisconstructedacrossarivertoobtainthenecessarywater
head.
•Theexcesswaterisallowedtoflowoverthedam,whilethewaterheadismadeuseto
runahydraulicturbine.
•ThistypeofplantusesverticalshaftFrancisorKaplanturbine.

PLANT CAPACITY
•Large-hydro
> 100 MW feeding into a large electricity grid
•Medium-hydro
15 -100 MW usually feeding a grid
•Small-hydro
1 -15 MW -usually feeding into a grid

•Itdoesn’tstorewaterandusesasthewater
comes.
•Thereisnocontrolonflowofwatersothat
duringhighfloodsorlowloadswateriswasted
whileduringlowrunofftheplantcapacityis
considerablyreduced.
•Generatingcapacityprimarilydependingonthe
rateofflowofwater
•Duringdryperiodsthepowerproductionwillbe
verypoor,sincethewaterflowratewillbelow.
•Duetonon-uniformityofsupplyandlackof
assistancefromafirmcapacitytheutilityof
theseplantsaremuchlessthanthoseofother
types.
RUN OFF RIVER PLANTS WITHOUT PONDAGE

Pondage:thecollectionofwaterbehindadamattheplantandincreasesthestreamcapacity
forashortperiodsayaweek.
Storage:acollectionofinupstreamreservoirsandthisincreasesthecapacityofthestreams
overanextendedperiodofseveralmonths.
Theusefulnessofrunoffriversisincreasedbypondage
Theseplantsmayworksatisfactorilyasbaseloadandpeakloadplants.
Ascomparedtothatwithoutpondage,ismorereliableanditsgeneratingcapacityisless
dependentontheflowratesofwateravailable.
RUN OFF RIVER PLANTS WITH PONDAGE

•Thistypeofplant,waterisstoredbehindthedamandwaterisavailablethroughout
theyeareveninthedryseason
•Storagetypeplantisonewithareservoirofsufficientlylargesizetopermitcarryover
storagefromthewetseasontothedryseasonandthustosupplyfirmflow
substantiallymorethantheminimumnaturalflow.
•Thisplantcanbeusedasabaseloadplantaswellasapeakloadplantaswateris
availablewithcontrolasrequired.
•Themajorityofhydroelectricpowerplantsinourcountryareofthistype.
STORAGE TYPE PLANTS (IMPOUNDMENT PLANTS)

•Areemployedatplaceswherethequantityofwateravailableforpowergenerationis
inadequate
•Waterpassingthroughtheturbineisstoredinthetailracepond.Duringlowloadperiods,
thiswaterispumpedbacktotheheadreservoir,whichcanbeusedduringpeakloadplants.
•Thiswatercanbeagainusedforgeneratingpowerduringpeakloadperiods.
•Pumpingofwatermaybedoneseasonallyordailydependingupontheconditionsofthe
siteandthenatureoftheloadontheplant.
•Usuallyinterconnectedwithsteamordieselpowerplants.
PUMPED STORAGE PLANT

SITE SELECTION FOR
HYDROELECTRIC POWER PLANT
1.WaterAvailability:Themainfuelofthisplantiswater.So,suchplantsshouldbe
locatednearertorivers,canals,etc.wheresufficientwaterisavailableallthetime.
2.WaterStorage:
•Storageofwaterinasuitablereservoirordamhastobeplacedbyacarefulgeological
studyoftheareatogetthemaximumadvantageofthatwater.Adamshouldbelocated
acrosstherivertogetacontinuouswatersupplythroughouttheyear,especiallyinthedry
season.Thestoragecapacityofthedamcanbedeterminedbyhydrographormasscurve
orusinganalyticalmethods.Adequatefacilitiesfortheerectionofadamandstorageof
wateraretwoimportantmattersforthesiteselectionofhydroelectricpowerplants.
3.WaterHead:
•Itisanimportantpointforsiteselectionofhydroelectricpowerplants.Waterheadis
directlyrelatedtothecostofgenerationofelectricpower.Iftheeffectiveheadis
increased,waterstoragehastobereducedaswellascapitalcostoftheplantisreduced.

SITE SELECTION FOR
HYDROELECTRIC POWER PLANT
4.Distancefromtheloadcenter:
•Sinceitislocatedawayfromtheloadcenter,moretransmissionlineisrequiredto
supplythepower.Toavoidthelinelossandeconomicpowersupply,thedistance
ofsuchaplantshouldneedmoreattention.
5.TransportationFacilities:
•Goodtransportationfacilitiesmustbeavailabletoanyhydroelectricpowerplant
sothatnecessaryequipmentshouldbereachedeasily.
6.Availabilityofland:
•Hydroelectricpowerplantneedsenoughspace.Itshouldbekeptinmindthat
landcostsmustbecheap.