INTRODUCTION OF SURVEYING, INTRODUCTION OF SURVEYING, INTRODUCTION OF SURVEYING

karthickkncetcivil 10 views 163 slides Sep 11, 2024
Slide 1
Slide 1 of 163
Slide 1
1
Slide 2
2
Slide 3
3
Slide 4
4
Slide 5
5
Slide 6
6
Slide 7
7
Slide 8
8
Slide 9
9
Slide 10
10
Slide 11
11
Slide 12
12
Slide 13
13
Slide 14
14
Slide 15
15
Slide 16
16
Slide 17
17
Slide 18
18
Slide 19
19
Slide 20
20
Slide 21
21
Slide 22
22
Slide 23
23
Slide 24
24
Slide 25
25
Slide 26
26
Slide 27
27
Slide 28
28
Slide 29
29
Slide 30
30
Slide 31
31
Slide 32
32
Slide 33
33
Slide 34
34
Slide 35
35
Slide 36
36
Slide 37
37
Slide 38
38
Slide 39
39
Slide 40
40
Slide 41
41
Slide 42
42
Slide 43
43
Slide 44
44
Slide 45
45
Slide 46
46
Slide 47
47
Slide 48
48
Slide 49
49
Slide 50
50
Slide 51
51
Slide 52
52
Slide 53
53
Slide 54
54
Slide 55
55
Slide 56
56
Slide 57
57
Slide 58
58
Slide 59
59
Slide 60
60
Slide 61
61
Slide 62
62
Slide 63
63
Slide 64
64
Slide 65
65
Slide 66
66
Slide 67
67
Slide 68
68
Slide 69
69
Slide 70
70
Slide 71
71
Slide 72
72
Slide 73
73
Slide 74
74
Slide 75
75
Slide 76
76
Slide 77
77
Slide 78
78
Slide 79
79
Slide 80
80
Slide 81
81
Slide 82
82
Slide 83
83
Slide 84
84
Slide 85
85
Slide 86
86
Slide 87
87
Slide 88
88
Slide 89
89
Slide 90
90
Slide 91
91
Slide 92
92
Slide 93
93
Slide 94
94
Slide 95
95
Slide 96
96
Slide 97
97
Slide 98
98
Slide 99
99
Slide 100
100
Slide 101
101
Slide 102
102
Slide 103
103
Slide 104
104
Slide 105
105
Slide 106
106
Slide 107
107
Slide 108
108
Slide 109
109
Slide 110
110
Slide 111
111
Slide 112
112
Slide 113
113
Slide 114
114
Slide 115
115
Slide 116
116
Slide 117
117
Slide 118
118
Slide 119
119
Slide 120
120
Slide 121
121
Slide 122
122
Slide 123
123
Slide 124
124
Slide 125
125
Slide 126
126
Slide 127
127
Slide 128
128
Slide 129
129
Slide 130
130
Slide 131
131
Slide 132
132
Slide 133
133
Slide 134
134
Slide 135
135
Slide 136
136
Slide 137
137
Slide 138
138
Slide 139
139
Slide 140
140
Slide 141
141
Slide 142
142
Slide 143
143
Slide 144
144
Slide 145
145
Slide 146
146
Slide 147
147
Slide 148
148
Slide 149
149
Slide 150
150
Slide 151
151
Slide 152
152
Slide 153
153
Slide 154
154
Slide 155
155
Slide 156
156
Slide 157
157
Slide 158
158
Slide 159
159
Slide 160
160
Slide 161
161
Slide 162
162
Slide 163
163

About This Presentation

INTRODUCTION OF SURVEYING


Slide Content

Definition

“It is the art of determining the
relative positions of different object on the surface of
the earth by measuring the horizontal distance
between them and by preparing a map to any suitable
scale.”

Objective of Surveying

+ The object of surveying is to prepare a map or plan to show
the relative positions of the objects on the surface of the
earth. The map or plan is drawn to some suitable scale.

» It also shows boundaries of districts, states, and countries
too.

» It also includes details of different engineering features such
as buildings, roads, railways, dams, canals etc

Objective of Surveying

BROOME FLOOR FAN
mL BLOCK um

Objective of Surveying

Objective of Surveying

URBAN COMPLEX - 2021

D)
[=
>
®
>
= E
2
un
=
O
o
>
=
U
wwe
o]
O

Uses of Surveying

The surveying may be used for following purposes:

i

To prepare a topographical map which shows hills, valleys, rivers, forests,
villages, towns, etc of country.

. To prepare a cadastral map showing the boundaries of fields, plots, houses,

and other properties.

. To prepare an engineering map which shows the position of engineering

works such as buildings, roads, railways, dams, canals, etc.

. To prepare military map showing roads and railways, communication with

different parts of country.

. To prepare a contour map to know the topography of the area to find out the

best possible site for roads, railways, bridges, reservoirs, canals, etc

. To prepare archeological map including places where ancient relics exist.
. To prepare a geological map showing areas including underground resources.

. For setting out work and transferring details from the map on the ground.

Topographical Maps

Cadastral Map

Engineering Map

2mesın

y

tansrg™ Lansing

LE PT

ry
Poa RE
po

PEN

wan

rn

El

Contour Map

Contour Map Contour Line

Military Map

Bbiiniembe

iy
"Ney

“regia
Etes

Saint
Jarier 4 LE San
ÿ
atlas

SIZE SYMBOLS
“Sau

1

"
Regiment AF Grao
X Eos

x

UNIT SYMBOLS

Basic Unit
Amphibian Tractor
Defense Batten
Engineer

Feta artery

intantry

Re.
rn

ler u

SYMBOLS

Command Post

EXAMPLES
..

Tn A

CoB Se Mer Peg
saña Be

sie Bag

Geological Map

Archaeological Map

Setting Out Work

Em:

STEPS IN SETTING OUT A

cm
BUILDING «>

Classification of Surveying

A. Primary Classification

Plane Surveying
Geodetic Surveying

B. Secondary Classification

1. Based on Instruments

2. Based on Methods

3. Based on Object

4. Based on nature of field

A. Primary Classification of Surveying

We know that the shape of the earth is spheroidal.
Thus the surface is obviously curved. Surveying
is primarily divided into two types considering
the curvature of the earth’s surface.

1. Plane Surveying
2. Geodetic Surveying

1. Plain Surveying

¢ The plain surveying is that type of surveying in which
earth surface is considered as a plane and the curvature
of the earth is ignored.

+ In such surveying a line joining any two stations is
considered to be straight.

¢ The triangle formed by any three points is considered
as aplane triangle, and the angles of the triangle
are considered as plain angles.

¢ Surveying is carried out for a small area of less than
250 km? .

* It is carried out by local or state agencies like R & B
department, Irrigation department, Railway
department.

2. Geodetic Surveying

The geodetic Surveying is that type of surveying
in which the curvature of the earth is taken into
account.

It is generally extended over larger areas.

The line joining any two stations is considered as
curved line.

The triangle formed by any three points is
considered to be spherical and the angles of the
triangle are considered to be spherical angles.
Geodetic surveying is conducted by the survey of
India Department and is carried out for a larger
area exceeding 250 km?

Geodetic Surveying

Surface Distance

Plain Surveying Vs Geodetic Surveying

The earth surface is considered as
plain Surface.

The Curvature of the earth is
ignored

Line joining any two stations is
considered to be straight

The triangle formed by any three
points is considered as plain.

The angles of triangle are
considered as plain angles.

Carried out for a small area <
250 km?

The earth surface is considered
as Curved Surface.

The curvature of earth is taken into
account.

The line joining any two stations is
considered as spherical/curved
line.

The Triangle formed by any three
points is considered as spherical.

The angles of the triangle are
considered as spherical angles.

Carried out for a small area > 250 km?

B. Secondary Classification
Survey can be classified on different bases:

1. Based on Instrument:

2. Based on Methods:

3. Based on Objects:

4. Based on the Nature of Field

B. Secondary Classification

Survey can be classified into various categories depending on
methods used and nature of the field.
1. Based on Instrument:

i. Chain Survey: This is the simplest type of surveying in which

only linear measurements are made with a chain or a tape.
Angular measurements are not taken.

ii. Compass Survey: In Compass Survey, the angles are
measured with the help of a magnetic compass.

iii. Plane Table Survey: It is a graphical method of surveying in
which field works and plotting both are done simultaneously.

B. Secondary Classification

iv. Theodolite survey: In theodolite survey the horizontal angles
are measured with the theodolite more precisely than compass
and the linear measurements are made with a chain or tape.

v. Tacheometric Survey: A special type of theodolite known as
tachometer is used to determine horizontal and vertical
distances indirectly.

vi. Photographic Survey: Photogrammetry is the science of taking
measurements with the help of photographs taken by aerial
camera from the air craft.

vii. Electronic Distance Measurement (EDM) Survey: In this type
of survey all measurements (length, angles, co-ordinates) are

made with the help of EDM instrument ( ¡.e.. Total Station).

B. Secondary Classification
2. Based on Methods:

i. Triangulation Survey: Triangulation is basic
method of surveying, when the area to be surveyed is
large, triangulation is adopted. The entire area is
divided into network of triangles.

ii. Traverse Survey: A Traversing is circuit of survey
lines. lt may be open or closed. When the linear
measurements are done with a chain and a tape and the
directions or horizontal angles are measured with a
compass or a theodolite respectively the survey is called
traversing.

B. Secondary Classification
3 Based on Objects:

. Geological Survey: In this both surface and subsurface
surveying are conducted to locate different minerals and
rocks. In addition, geological features of the terrain such as
folds and faults are located.

. Mine Survey: Mine Survey includes include both surface and

underground surveys. It is conducted for the exploration of
mineral deposits and to guide tunneling and other operations
associated with mining.

. Archeological Survey: It is conducted to locate relics of

antiquity, civilization, kingdoms, forts, temples, etc.

. Military Survey: lt has a very important and critical

applications in the military. Aerial surveys are conducted for
this purpose. It is conducted to locate strategic positions for
the purpose of army operations.

B. Secondary Classification
4. Based on Nature of Field:

i. Land Survey: Land Survey is done on land to prepare plan
and maps of a given area. Topographical, city and cadastral
surveys are some of the examples of land surveying.

ii. Marine Survey: This survey is conducted on or near the
body of water such as lake, river, coastal area. This Survey
consists of locating shore lines of water bodies.

iii.Astronomical Survey: This survey is conducted for the
determining of latitudes, longitudes, azimuths, local time, etc.
for various places on earth by observing heavenly bodies ( sun
or the stars).

Principles of Surveying

FUNDAMENTAL PRINCIPLES OF SURVEYING 4

Principle: 1 Principle: 2

LOCATE A POINT BY ATLEAST

WHOLE TO PART TWO MEASUREMENTS

| Locate a new station by at least 2
measurements whether linear or
angular from fixed reference
points.

Always work from whole to part

Principles of Surveying

Principle: 1 (3
| WHOLE To PART

OIn surveying large areas, a system of control

>
points are identified and they are located 4
with high precision. "1

QThen secondary control points are located
using lesser precise methods.

OThe details of the localized areas are
measured and plotted with respect to the
secondary control points.

OThis is called working from whole to part.

OThis principle in surveying helps in localising
the errors.

QIf the surveying is carried out by adding
localized areas errors accumulated and may
become unacceptable when large area is
covered.

Principles of Surveying

1. Always work from whole to the part:

* According to the first principle,

the whole survey area is

first enclosed by main

stations (i.e.. Control stations)
and main survey lines.

+ The area is then divided
into a number of divisions
by forming well conditioned
triangles.

Principles of Surveying

1.

Always work from whole to the part:

The main survey lines are measured very accurately
with precise survey instruments.

The remaining sides of the triangle are measured.

The purpose of this method of working is to control
accumulation of errors.

During measurement, if there is any error, then it will
not affect the whole work, but if the reverse
process is followed then the minor error in
measurement will be magnified.

Principles of Surveying

| Principle: 2

Ocontrol points are selected in the area and
the distance between them is measured
accurately. The line joining these two points
is plotted to the scale on drawing sheet.

ONow the desired point(new station) can be
plotted by making suitable measurements
from the given control point.

OThe new stations are located by linear or

angular measurements or by both.

Principles of Surveying

2. To locate a new station by at least two
measurements ( Linear or angular) from fixed reference
points.

» According to the second principle the points are
located by linear or angular measurement or by both
in surveying. If two control points are established
first, then a new station can be located by linear
measurement.

° Let A & B are control points, a new point C can be
established.

Following are the methods of locating point C from such reference points A & B.

The distance AB can be measured accurately and the relative positions of the point

can be then plotted on the sheet to some scale.

(a) Taking linear measurement from A and B for C.

(b) Taking linear measurement of perpendicular from D to C.

(c) Taking one linear measurement from B and one angular measurement as /_ ABC

(d) Taking two angular measurement at A & B as angles /_CAB and / ABC.

(e) Taking one angle at B as /_ ABC and one linear measurement from A as AC.

Fig. 11.3. Locating point C w.rt. points A and B

D 1.6KM

Distance

Methods of Measuring Distance
[A] Direct Method of Measuring Distance:

1. Pacing:

Where approximate result is required, distance may be determined
by pacing. This method is used for reconnaissance survey, for
preparation of military plans. Also used for approximate checking
distance. The method consists of walking over a line and counting the
number of paces (80cm) the required distance may be obtained by
multiplying the number of paces by the average length of pace.

The length of pace varies with the: i
* Individual, age, height and physical condition oust

+ The nature of the ground (uphill and down hill)

° The slope of the country and

+ The speed of pacing

Methods of Measuring Distance
[A] Direct Method of Measuring Distance:

2. Passometer:

It is a pocket instrument. It automatically records the number of
paces. It should be carried vertically, in waistcoat pocket or
suspended from a button. The mechanism being operated by motion
and strain of the body.

Methods of Measuring Distance
A] Direct Method of Measuring Distance:

3. Pedometer:

It is similar to passometer. But it registers the distance walked by the
persons carrying it. The distance is read by means of an indicator. It
is fitted with a stud or knob, which when pressed release indicator to
zero, it may be carried in the same way as the passometer.

SN

Methods of Measuring Distance

[A] Direct Method of Measuring Distance:

4. Odometer:

It measures the distance approximately. It can be attached to the
wheel of any vehicle, such as carriage, cart bicycle, etc. It registers
the number of revolution of the wheel. Knowing the circumference of
the wheel, the distance traversed may be obtained by multiplying
the number of revolutions. By the circumference of the wheel

50 60 70
40 11117, ,80
x 479

OS so 30
[Duo > 333 100
=10

\ AA =

Methods of Measuring Distance

[A] Direct Method of Measuring Distance:
5. Speedometer:

The Speedometer of an automobile may be used to measure
distances approximately. lt gives better results than pacing, provided
the route is smooth.

Methods of Measuring Distance

[A] Direct Method of Measuring Distance:

6. Perambulator:

It can measure distance rapidly. It consist a single wheel provided
with forks and a handle. It is wheeled along the line, the length of
which is desired. The distance traversed is automatically registered
on the dial. The reading approximates on rough ground.

Methods of Measuring Distance

[A] Direct Method of Measuring Distance:

7. Judging distance:
This is very rough method of determining distance. It is used
reconnaissance survey.

8. Time Measurement:

This distance is roughly determined by time intervals of travel.
Knowing the average time per km for a person at walk or a horse,
the distance traversed may be easily obtained.

Methods of Measuring Distance
[A] Direct Method of Measuring Distance:

9. Chaining:

Measuring the distance with chain or rope or tape is the most
accurate and common method, called as chaining. For work of
ordinary precision a chain is used. Where great accuracy is
required, a steel tape is used.

Methods of Measuring Distance

* In the optical methods, principles of optics are used.

° The distance is not actually measured in field but it is computed
indirectly.

° The instrument used for making observations is called tacheometer.

view through
transit

Methods of Measuring Distance

[8] Optical Method of Measuring Distance:

Methods of Measuring Distance
[E] EDM Method of Measuring Distance:

» Electronic Distance Measuring (E.D.M) instruments have been developed
quite recently.

° These are practically replacing the measurement of distances using
chains or tapes.

° There is a large variety of such instruments and depending upon the
precision required the instruments should be used.

Accessories for Linear Measurements

The following instruments are required for measurements
with chain and tape:

. Chains

. Tape

. Ranging rods

. Offset rods

. Arrows

Pegs

. Plumb bob and

. Line ranger

œ@ N © U RE ww RD —

Accessories for Linear Measurements

° Normally, a chain is prepared with 100 or 150 pieces of
galvanized mild steel wire of 4 mm diameter known as link.

° The ends of the links are bent into loop and connected together by
means of three oval rings which provide the flexibility to the chain
and make it less liable to kinking.

+ Both ends of the chain have brass handle with swivel joint so that
the chain can be turned round without twisting.

—— BRASS HANDLE
| EYE BOLT

— as. 5

—SWIVEL JOINT :
KH — ONE LINK: ==> -2k——-ONE LINK —A ,
20 cm 20 cm

Accessories for Linear Measurements
I. Metric Chain:

+ In a metric chain at every one meter interval of chain, a small brass ring is
provided.

* Brass tallies are also provided at every 5.0 m length of chain. Each tally has
different shape which indicates 5 , 10, 15m from any one side of the chain,
metric chains are available in 20 m and 30 m length.

+ A 20 m chain has 100 links each of 20 cm and 30 m chain has 150 links. Length
of chain is embossed on the brass handles of the chain.

Accessories for Linear Measurements

- E 06 LAO

BRASS RING
; TALLIES
20M ————

HR ET A

12M 14M 16M 18M 20M
4M 2M

AM 6M 8M 10M

ad el 16M 14M12M 10M 8M 6M
20 M CHAIN

20M --

>- a sa all E mE

AT EVERY METRE
5M 10M

— 0
«— 20M 15M 10M
< 20M CHAIN (1.5.5
(b) 20 m Chain (iS!)

15M
"SM

(a) 20 m Chain

Accessories for Linear Measurements
II. Gunter's Chain or Surveyor's Chain:
+ A 66 feet long chain consists of 100 links each of 0.66 ft it is
known as Gunter"s Chain
* Here, 10 sq chain are equal to 1 acre,
+ 10 chains= 1 furlong and 8 furlongs = 1 mile
* This chain is suitable for taking length in miles and areas in acres.

Accessories for Linear Measurements

1 chain mes ad A
= 100 links
4 poles tE EEL ren An awl Sf.

(or rods)

10 chains = 1 furlong

10 square chains = 1 acre

80 chains = 5,280 feet = 1 mile

77

Accessories for Linear Measurements

ITI. Engineer's Chain:

* A 100 ft chain of 100 links each of 1 foot is known as Engineer's
chain.

* Brass tags are fastened at every 10 links.

* This chain is used to measure length in feet and area in square
yards.

Accessories for Linear Measurements

+10 links ————++< 10 links +10 links »« 10 links ~ 7

> A

———— 10 links —— 4 10 links 44.10 links se 10 links -

(a)

40/60 links

Accessories for Linear Measurements

IV. Revenue Chain:

ft long chain consisting of 16 links.
ice measurements in feet & inches for

Accessories for Linear Measurements

V. Steel Band or Band Chain:

Steel bands are preferred than chains because they are more
accurate, but the disadvantages is that they get broken easily
and are difficult to repair in the field.

They are 20 and 30 m long, 12 to 16 mm wide and 0.3 to 0.6
mm thick.

+ They are numbered at every metre and divided by brass studs at

every 20 cm

Accessories for Linear Measurements
V. Steel Band or Band Chain:

==,

Accessories for Linear Measurements

2. Tapes

Tapes are used for more accurate measurement. The tapes
are classified based on the materials of which they are
made of such as:

|. Cloth or linen tape
Il. Fibre Tape

lll. Metallic Tape

IV. Steel tape

V. Invar Tape

Accessories for Linear Measurements

Accessories for Linear Measurements
LI. Cloth or LinenTape :

° Linen tapes are closely woven linen and varnished to resist
moisture.

* They are generally 10 m, 20 m, 25 m and 30 m long in length
and 12 to 15 mm wide.

° They are generally used for offset measurements. These tapes are
light and flexible.

Accessories for Linear Measurements

Accessories for Linear Measurements
II. Fibre Glass Tape :

° These tapes are similar to linen and plastic coated tapes but these
are made of glass fibre.

° The tapes are quite flexible, strong and non- conductive.

» These can be used in the vicinity of electrical equipment.

» These tapes do not stretch or shrink due to changes in temperature
or moisture.

° These tapes are available in length of 20 m, 30 m and 50m
length.

Accessories for Linear Measurements

Accessories for Linear Measurements

III. Metallic Tape:

A linen tape reinforced with brass or copper wires to prevent
stretching or twisting of fibres is called a metallic tape.

As the wires are interwoven and tape is varnished these wires are
visible to naked eyes.

This is supplied in a lather case with a winding device. Each metre
length is divided into ten parts (decimetres) and each part is
further sub-divided into ten parts.

It is commonly used for taking offset in chain surveying.

Accessories for Linear Measurements

Accessories for Linear Measurements
IV. Steel Tape

» The steel tape is made of steel ribbon of width varying from 6 to
16 mm.

° The commonly available length are 10 m, 15 m, 20 m, 30 m and
50 m. It is graduated in metres, decimetres, and centimetres.

° Steel tapes are used for accurate measurement of distances.

Accessories for Linear Measurements

IV. Steel Tape

Accessories for Linear Measurements

V. Invar tape

Invar tape are made of alloy of nickel 36 % and steel 64 %
having very low co-efficient of thermal expansion.

These are 6 mm wide and generally available in length of 30 m,
50m, 100m.

It is not affected by change of temperature therefore, it is used
when high degree of precision is required.

Accessories for Linear Measurements

Accessories for Linear Measurements
3

° Ranging rods are used for ranging some
intermediate points on the survey line.

° Ranging rods are generally 2 to 3 m in
length and are painted with alternate bands
of black or white or red and white colour
with length of each equalizing 20 cm.

° The location of any survey station can be
known from long distances only by means of
ranging rods.

+ If the distance is too long, a rod of length
4.0 to 6.0 m is used and is called ranging

pole. Fig. 1.1 Ranging Rod

Accessories for Linear Measurements
3. Ranging Rods:

Accessories for Linear Measurements
4.

° The offset rod is similar to ranging rod with the
exception that instead of the flag, a hook is
provided at the top for pushing and pulling the
chain or the tape.

° It is also used for measuring small offsets

re}

Accessories for Linear Measurements
Ranging Rods and Offset Rods:

Fig. 12.7 Ranging rod

Narrow slit

Black or Red
bands

White bands.

tad

Fig. 12.8. Offset rod

Accessories for Linear Measurements

al

Arrows are made of tempered steel wire
of diameter 4 mm.

one end of the arrow is bent into ring of
diameter 50 mm and the other end is
pointed.

lts overall length is 400 mm.

Arrows are used for counting the number
of chains while measuring a chain line.

An arrow is inserted into the ground after
every chain length measured on the
ground.

Accessories for Linear Measurements

° Pegs are made of timber or steel and they are used to mark the
position of the station or terminal points of a survey line.
° Generally, pegs are 15 cm long and are driven into the ground

with the help of a hammer.

!
l

Accessories for Linear Measurements

7. Plumb Bob:

° Plumb-bob is used to transfer points on
the ground.

° It is also used for fixing the instruments
exactly over the station point marked on
the ground by checking the centre of the
instrument whether coincides with the
centre of the peg or station not, by
suspending the plumb-bob exactly at the
centre of the instrument under it.

° Plumb bob is thus used as centring aid in
theodolites and plane table.

Accessories for Linear Measurements
8. Line Ranger:

° It is an optical instrument used for locating
a point on a line and hence useful for
ranging.

It consists of two isosceles prisms placed one

over the other and fixed in an instrument

with handle.

° The diagonals of the prisms are silvered so
as to reflect the rays.

° Its advantage is it needs only one person
to range.

° The instrument should be occasionally

tested by marking three points in a line

and standing on middle point observing

the coincidence of the ranging rods.

Accessories for Linear Measurements

8. Line Ranger:

+ |f the images of the two ranging rods do not appear in the same line,
one of the prism is adjusted by operating the screw provided for it.

Accessories for Linear Measurements
E

To locate point C on line AB (ref. Fig.) the surveyor holds the instrument in hand
and stands near the approximate position of C.

+ If he is not exactly on line AB, the ranging rods at A and B appear separated as
shown in Fig. (b).

» The surveyor moves to and from at right angles to the line AB till the images of
ranging rods at A and B appear in a single line as shown in Fig. (c).

° It happens only when the optical square is exactly on line AB.

*_ Thus the desired point C is located on the line AB.

Accessories for Linear Measurements

Three different types of cross staffs used for setting perpendicular offsets.
All cross staffs are having two perpendicular lines of sights.
The cross staffs are mounted on stand.

First line of sight is set along the chain line and without disturbing setting right
angle line of sight is checked to locate the object.

Cross staff

Accessories for Linear Measurements

9)

° With open cross staff (Fig(a)) it is possible to set perpendicular
only, while with French cross staff (Fig(b)), even 45° angle can be
set.

° Adjustable cross staff can be used to set any angle also, since there
are graduations and upper drum can be rotated over lower drum.

Accessories for Linear Measurements
10. Cro

° With open cross staff (Fig(a)) it is possible to set perpendicular
only, while with French cross staff (Fig(b)), even 45° angle can be
set.

Adjustable cross staff can be used to set any angle also, since there
are graduations and upper drum can be rotated over lower drum.

Chain Surveying

° Chain surveying is the type of surveying in which only
linear measurements are taken in the field.

° This type of surveying is done for surveying of small
extent to describe the boundaries of plots of land and to
locate the existing feature on them.

° It is the method of surveying in which the area is divided
into network of triangles and the sides of the various
triangles are measured directly in the field with a chain
or a tape and no angular measurements are taken.

Principle of Chain Surveying

° Triangulation is the principle of chain surveying.

» The principle of chain surveying is to divide the area
into a number of triangles of suitable sides. As a
triangle is the only simple plane geometrical figure
which can be plotted from the length of the three sides
even if the angles are not known. A network of triangles
is preferred to chain surveying.

° If the area to be surveyed is triangle in shape and if the
lengths and sequence of its three sides are recorded,
the plan of the area can be easily drawn.

Principle of Chain Surveying

Principle of Chain Surveying

Principle of Chain Surveying

Principle of Chain Surveying

cr pe

| angle

Terms related to Chain Surveying
Survey Stations:

Survey stations are the points at the beginning and at the end of a
chain line they may also occur at any convenient position on the
chain line.

Such station may be:
° Main Stations
° Subsidiary Stations

° Tie Stations

Terms related to Chain Surveying
Survey Stations:

° Main Stations: Main Station Stations along the boundary of an
area as controlling points are known as ‘Main Stations’. The main
stations are denoted by A.

Subsidiary Stations: Stations which are on the main survey lines
or any other survey lines are known as ‘Subsidiary Stations’
these stations are taken to run subsidiary lines for dividing the
area into triangles, for checking the accuracy of triangles and
for locating interior details.

Tie Stations: These stations are also subsidiary stations taken on
the main survey lines. Lines joining the stations are known as ‘Tie
lines’. Tie lines are taken to locate interior details.

Terms related to Chain Surveying

Terms related to Chain Surveying

Survey Lines:

° Main Survey Lines: The line joining the main stations are
called main survey lines or chain lines. The main survey lines
should cover the whole area to be surveyed.

° Base Lines: The line on which the framework of the survey is
built is known as ‘Base line”. It is the most important line of the
survey. Generally the longest of the main survey lines is
considered as the base line. This lines should be taken through
fairly level ground, and should be measured very carefully and
accurately.

Terms related to Chain Surveying

Survey Lines:

» Check Lines: The line joining the apex point of a triangle to
some fixed points on its base is known as ‘Check line’. It is taken
to check the accuracy of the triangle. Sometimes this line helps to
locate interior details.

° Tie Line: A line joining tie stations is termed as a tie line. It is
run to take the interior details which are far away from the main
lines and also to avoids long offsets. It can also serve as check
line.

Selection of Survey Station

The following points should be considered while selecting survey
stations:

° It should be visible from at least two or more stations.

* As far as possible main lines should run on level ground.

° All triangles should be well conditioned (No angle less than 30°).
° Main network should have as few lines as possible.

° Each main triangle should have at least one check line.

° Obstacles to ranging and chaining should be avoided.

* Sides of the larger triangles should pass as close to boundary
lines as possible.

° Trespassing and frequent crossing of the roads should be
avoided.

Operation in Chain Surveying

The following operations are involved in chain surveying.

1. Chaining
2. Ranging
3. Offsetting

These three operations are done simultaneously during
chain Surveying.

Operation in Chain Surveying

1. Chaining:
Chaining on Level Ground

» The method of taking measurement with the help of
chain or tape is termed as chaining.

Chaining involves following operations
a) Fixing the stations

b) Unfolding the chain

c) Ranging

d) Measuring the distance (Survey Line)
e) Folding the Chain

Operation in Chain Surveying

1. Chaining:
a) Fixing of Station

Stations are first of all marked with pegs and ranging rods to
make them visible.

b) Unfolding of a Chain

° To open a chain, the strap is unfastened and the two brass
handles are held in the left hand and the bunch is thrown
forward with the right hand.

* Then one chainmen moves forward by holding the other
handle until the chain is completely extended.

Operation in Chain Surveying

i
c) Ranging:

The process of establishing intermediate points on a straight
line between two end points is known as ranging. Ranging must
be done before a survey line is chained.

Operation in Chain Surveying

Ranging
Rapid Sweep with right hand Move considerable towards left
Slow Sweep with right hand Move slowly towards left
Right arm extended Continuously move towards left
Right arm up and move to the right Plumb the rod towards left
Rapid Sweep with left hand Move considerable towards right
Slow Sweep with left hand Move slowly towards right
Left arm extended Continuously move towards right
Left arm up and move to the right Plumb the rod towards right

Both hand above head and brought Ranging is correct
down

Both arm extended horizontally Fix the ranging rod
and brought down quickly

Operation in Chain Surveying
1. Chaining:

d) Measuring the distance (Survey Line):

° Two persons are required in this operation, i.e. Leader and
Follower.

+ The chainman at the forward end of the chain who drags the
chain forward, is known as the leader

+ The chainmen at the rear end of the chain, who holds the
zero end of the chain at the station, is known as the follower.

° To chain the line, the leader moves forward by dragging the
chain line and taking with him ranging rod and ten arrows.

° The follower stands at the starting station by holding the
other end of the chain.

Operation in Chain Surveying
1. Chaining:

d) Measuring the distance (Survey Line):

When the chain is fully extended, the leader holds the
ranging rod vertically at arms length.

The follower directs the leader to move his rod to the left or
right until the ranging rod is exactly in the line.

Then the follower holds the zero end of the chain by touching
the station peg.

The leader stretches the chain by moving it up and down with
both hands, and finally place it on the line.

He then inserts an arrow on the ground at the end of the
chain and mark it with cross.

Again the leader moves forward by dragging the chain with
nine arrows and the ranging rod.

Operation in Chain Surveying
1. Chaining:

d) Measuring the distance (Survey Line):

° At the end of the chain, he fixes another arrow as before, As
the leader moves further, the follower picks the arrow which
were inserted by the leader.

During chaining the surveyor or an assistant should conduct
the ranging operation. In this way, chaining is continued, when
all the arrows are inserted the leader has non left with him,
the follower hands over to the leader.

To measure the fractional length, the leader should drag the
chain beyond the station and the follower should hold the
zero end of the chain at last arrow, then odd links should be
counted.

Operation in Chain Surveying
1.
d) Measuring the distance (Survey Line):

A. Level Ground

Forward Ranging

Operation in Chain Surveying
1. Chaining:

d) Measuring the distance (Survey Line):

Operation in Chain Surveying
1. Chaining:
e) Folding of Chain:

To fold the chain, a chainmen should move forward by pulling the chain
at the middle.

Then the two halves of the chain will come side by side. After this,
commencing from the central position of the chain, two pairs of links are
taken at a time with the right hand and placed on the left hand
alternately in both directions.

Finally the two brass handles will appear at top. The bunch should be
then fastened by the strap.

Operation in Chain Surveying
2. Ranging:
° When a survey line is longer than a chain length, it

is necessary to align intermediate points on chain
line so that the measurements are along the line.

° The process of locating intermediate points on
survey line is known as ranging.

° There are two methods of ranging viz.,
i. Direct Ranging and

ii. Indirect/Reciprocal Ranging.

Operation in Chain Surveying
2:
i. Direct Ranging

+ If the first and last points are intervisible this method is possible.

* Stations A and B in which an intermediate point C is to be
located.

° Point C is selected at a distance slightly less than a chain length.

fb) Sectional view

Operation in Chain Surveying
2:

i. Direct Ranging
° At points A and B ranging rods are fixed.

Operation in Chain Surveying

2:
i. Direct Ranging

+ The assistant holds another ranging rod near C.

* Surveyor positions himself approximately 1 m behind station A and looking
along line AB directs the assistant to move at right angles to the line AB till he
aligns the ranging rod along AB.

Operation in Chain Surveying

2:
i. Direct Ranging

* Then surveyor instructs the assistant to mark that point and stretch the chain
along AC.

Operation in Chain Surveying

2:
i. Indirect/Reciprocal Ranging

* Due to intervening ground, if the ranging rod at B is not visible from station A,
reciprocal ranging may be resorted.

+ Figure shows this scheme of ranging.

Operation in Chain Surveying
2:

i. Indirect/Reciprocal Ranging
* It needs two assistants one at point M and another at point N, where from those points
both station A and station B are visible. It needs one surveyor at A and another at B.

* To start with M and N are approximately selected, say M1 and N1. Then surveyor
near end A ranges person near M to position M2 such that AM2N1 are in a line.

* Then surveyor at B directs person at N, to move to N2 such that BN2M2 are in a line.

° The process is repeated till AMNB are in a line.

TTTTTIT;
N
8

la) Sectional view

(b) Plan view

Operation in Chain Surveying
2:

i. Indirect/Reciprocal Ranging
* It needs two assistants one at point M and another at point N, where from those points
both station A and station B are visible. It needs one surveyor at A and another at B.

* To start with M and N are approximately selected, say M1 and N1. Then surveyor
near end A ranges person near M to position M2 such that AM2N1 are in a line.

* Then surveyor at B directs person at N, to move to N2 such that BN2M2 are in a line.

° The process is repeated till AMNB are in a line.

TTTTTIT;
N
8

la) Sectional view

(b) Plan view

Testing and Adjustment of Chain

° During continuous use, the length of a chain gets altered. Its
length is shortened chiefly due to the bending of links. Its length
is elongated either due to stretching of the links and joints and
opening out of the small rings.

For accurate work it is necessary to test the chain time to time.
The chain can be thus tested by a steel tape or by a standard
chain. Sometimes, it is convenient to have a permanent test
gauge established where the chain is tested.

When the length of a chain is measured at a pull of 8 kg at 20
degree C the length of the chain should measure 20 m + 5 mm
and 30 m + 8 mm for 20 m and 30 m long chain shall be
accurate to within 2 mm.

Testing and Adjustment of Chain

Following measures are taken to adjust the length of a chain.
1. If chain is found to be too long
It can be adjusted by;
* Closing up the joints of the rings if found to be opened out
° Reshaping damaged rings
* Removing one or more small rings
+ Adjusting the links at the end.

2. If the chain is found to be too short
+ Straightening the bent links
* Opening the joints of the rings
* Replacing one or more small circular rings by bigger ones.
* Inserting new rings where necessary.

+ Adjusting the links at the end.

Operation in Chain Surveying

3.

Offsetting:

Lateral measurements to chain lines for locating
ground features are known as offsets.

For this purpose perpendicular or oblique offsets may
be taken.

If the object to be located (say road) is curved more
number of offsets should be taken.

For measuring offsets tapes are commonly used.

Operation in Chain Surveying

3
|. Perpendicular Offsets

» The offsets which are taken
perpendicular to the chain line are
termed as perpendicular offsets.

* These offsets are taken by holding
zero end of the tape at the object
and swinging the tape on the chain
line.

° The shortest distance measured
from object to the chain line is
usually the perpendicular offset. — Chain line

Operation in Chain Surveying
3
Il. Oblique Offsets

° Oblique distance is always
greater than perpendicular
distance.

° All the offsets which are not
taken at the right angle to chain
line are known as oblique
offsets.

Operation in Chain Surveying
3

For setting perpendicular offsets any one of the following
methods are used:

(i) Swinging:

(ii) Using cross staffs:

(iii) Using optical or prism square.

Operation in Chain Surveying
3.16

|

Operation in Chain Surveying

IN
(i) Swinging

.

Surveyor swings the
tape on chain line and
selects the point on

chain where offset

distance is the least and
notes chain reading as
well as offset reading
in a field book on a
neat sketch of the
object.

Operation in Chain Surveying

(i) Swinging
* Surveyor swings the tape on chain line and selects the point on chain where |
‘is the least and notes chain reading as well as offset reading in |

eat sketch of the object. |

Operation in Chain Surveying

3. Offsetting:
(ii) Using Cross Staff:

° Three different types of cross staffs used for setting
perpendicular offsets. All cross staffs are having two
perpendicular lines of sights.

* The cross staffs are mounted on stand.

* First line of sight is set along the chain line and without
disturbing setting right angle line of sight is checked to locate
the object.

Operation in Chain Surveying

3. Offsetting:
(ii) Using Cross Staff:

+ With open cross staff (Fig(a)) it is possible to set
perpendicular only, while with French cross staff (Fig(b)), even
45° angle can be set.

° Adjustable cross staff can be used to set any angle also, since
there are graduations and upper drum can be rotated over
lower drum.

Operation in Chain Surveying

3. Offsetting:
(ii) Using Optical Square and Prism Square:

° An optical square is also used for setting out right angles.

° lt consist of a small circular metal box of diameter 5 cm and
depth 1.25 cm.

* It has a metal cover which slides round the box to cover the slits.

* The following are the internal arrangements of the optical
square.

1. A horizon glass H is fixed at the bottom of the metal box. The lower half
of the glass is unsilvered and the upper half is silvered.

2. A index glass | is also fixed at the bottom of the box which is completely
silvered.

3. The angle between the index glass and horizon glass is maintained at

450.

Operation in Chain Surveying

3.

(ii) Using Optical Square and Prism
Square:

4. The opening ‘e’ is a pinhole for eye E,
‘b’ is a small rectangular hole for
ranging rod B, ‘P’ is a large rectangular
hole for object P.

5. The line EB is known as horizon sight and
IP as index sight.

HORIZON

6. The horizon glass is placed at an angle ii

of 120% with the horizon sight. The
index glass is placed at an angle of
105° with the index sight.

7. The ray of light from P is first reflected
from |, then it is further reflected from H,

after which it ultimately reaches the eye
E

Operation in Chain Surveying
3

(ii) Using Optical Square and Prism Square:

HOR a

Operation in Chain Surveying

3. Offsetting:

(ii) Using Optical Square and Prism Square:
Principle:
According to the principle of reflecting surfaces, the angle
between the first incident ray and the last reflected ray is twice
the angle between the mirrors. In this case, the angle between
the mirrors is fixed at 450. So, the angle between the horizon
sight and index sight will be 900.

Setting up the perpendicular by optical square

a. The observer should stand on the chain line and
approximately at the position where the perpendicular is to
be set up.

Operation in Chain Surveying

3. Offsetting:
(ii) Using Optical Square and Prism Square:
b. The optical square is held by the arm at the eye level. The
ranging rod at the forward station B is observed through the
unsilvered portion on the lower part of the horizon glass.

c. Then the observer looks through the upper silvered portion
of the horizon glass to see the image of the object P.

d. Suppose the observer finds that the ranging rod B and the
image of object P do not coincide. The he should move
forward or backward along the chain line until the ranging
rod B and the image of P exactly coincide

e. At this position the observer marks a point on the ground to
locate the foot of the perpendicular.

Operation in Chain Surveying

%, Oblique Offset

av D2 / Perpendicular Offset
ig 2, erpe

à /
Ba, N A

dee NS.

Sa Fr =

elec Navi

ses 12,13 are the chain-edge( Where offset meets perpendicular to chain)
d12,d13 are the offset distances

wt1, wt2, B11, B12, B31 and B21 are the references/ oblique offset from permanent
structure i.e. Water Tank, Buildings, electric towers

T refers to offset taken at tree( shouldn't consider reference, however it is oblique
offset)

Legends or Coding Office Work |

12,3, „12,13 are the chain-edge( Where offset meets perpendicular to chain}

d1,d2,d3,.. ,d12,d13 are the offset distances

wtı, wt2, B11, B12, B31 and B21 are the references/ oblique offset from permanent Le ends .

structure i.e. Water Tank, Buildings, electric towers 8 id

T refers to offset taken at tree( shouldn’t consider reference, however it is oblique Pole

offset) Tree ?
Building/Home EX
Water Tank O

TT
7 aol ee

2 [A
do |d6 |d5 |d3 hy

re

Area calculation: approximate estimation of surveyed land Office Work

Area calculation: approximate estimation of surveyed land Office Work

Calculated Area in meter square

Tape Correction

. Correction for temperature
. Correction for Sag

. Correction for tension

. Correction for Altitude

. Correction for slope

. Correction for alignment

NO GQ BR © ND —

. Correction for standard length

Tape Correction

1. Correction for Temperature:

The length of the tape increases while the temperature is
increased and decreases if the temperature is lowered.

C,=al (t=t)

Where
L = measured length of a line
t = mean temperature during measurement in oc.
ts = nominal temperature of standardization.
Ct = correction due to temperature
= co-efficient of linear expansion.(6.5*10-60 F) or 11.2*10-60 C

Tape Correction

2. Correction for Sag:

When the tape is suspended from two support in air,
is assumes the shape of centenary.

Where

Cs = Correction for sag

w = weight per unit length

| = measured length of open

p = pull applied during measurement

Tape Correction

3. Correction for Tension:

If the pull applied to the tape during measurements is more than it is
standardized its length increase and the measured distance become less than
the actual.

(Correction for tensions is there for positive.)
| P-Ps | L
Let

P = the tension of pull at field (N).

Ps = standardized tension. (N).

L = length measured.

A = Cross — sectional of steel band

E = Young's modulus of elasticity of the steel bond.
Cten = Correction for tension

Tape Correction

3. Correction for Altitude:
If the surveying is connected to the functional mapping of the country,
the distance will need to be reduced to the common datum at that
system normally.

E (ground)

The correction for altitude for
surface work is negative & positive
for tunneling work or mining work
below MSL.

Obstacles in

En

Obstacles in Chaining
A chain line may be interrupted in the following
situations:
1. When chaining is free, but vision is obstructed

2. When chaining is obstructed, but vision is free

3. When chaining and vision both are obstructed

Obstacles in Chaining

1. When chaining is free, but vision is obstructed

Such problems arises when a rising ground or a
jungle area interrupts the chain line. Here the end
stations are not inter-visible. There may be two
cases:

Case |: Both ends may be visible from intermediate points
on the line.

Case Il: Both ends may not be visible from any intermediate
point.

Obstacles in Chaining

_ase |: The end stations may be visible from some

interne points on the rising ground. In this case, Reciprocal
ranging is resorted to, and the chaining is done by the stepping
method.

Obstacles in Chaining

The end stations are not visible from intermediate
points when a forest area comes across the chain line. In this
case, the obstacle may be crossed over using a random line as
explained below.

BY similarity of triangle

BB1_CC1

AB1+*CC1
AC1

Obstacles in Chaining

Let AB be the line whose length is required. From A run a
line(AB1), called a random line, in any convenient direction, but as
nearly towards B as can be judged and continue it until the point B is
visible from B1. chain the line to Bl where BB1 is perpendicular to
AB1 and measure BB1. Then,

= 2 2
ne v(4B1) ae BY similarity of triangle

BB1 :CC1

AB1 AC1

AB1+ CC1
AC1

BB1=

Obstacles in Chaining

If any other length AC1 is measured along ABl a point C
is located on the line AB by measuring the perpendicular distance
C1C=(AC1 /AB1)XB1B. In this manner a sufficient number of
points can be located. The line is then cleared and the distance

measured.

Obstacles in Chaining

2. When chaining is obstructed, but vision is free
When a pond plantation, tank, river, etc. The
problem is to find the distance between two
convenient points on the chain line on either side
of the obstacle. There are two cases :

Case l: In which it is possible to chain round obstacle

e.g. a pond, a bend in the river, etc.

Case Il: In which it is not possible to chain round the
obstacle, e.g. a river.

Obstacles in Chaining

2. When chaining is obstructed, but vision is free

Case |: In which it is possible to chain round obstacle

e.g. a pond, a bend in the river, etc.

(a) Select two convenient points A and B on the chain line PR
and on either side of the obstacle(fig.3.38). Erect equal

perpendicular AC and BD by the 3, 4, 5 method ,or the
optical square and measure the length CD. Then AB=CD

Obstacles in Chaining

In which it is possible to chain round obstacle
e.g. a pond, a bend in the river, etc.

) As before select A and B. Set out a perpendicular AB of
such a length that CB clears the obstacle, and measure AB
and CB.

Then AC=V(BC2-AB2).

Obstacles in Chaining

2. When chaining is obstructed, but vision is free

Case |: In which it is possible to chain round obstacle

e.g. a pond, a bend in the river, etc.

(c) The measurement may be effected
by constructing a right angled triangle.
Select a point A(fig.3.40) on the chain
line on one side of the obstacle and set
out AC to clear the obstacle. At C erect
a perpendicular CB with the optical
Square to clear the obstacle, and
determine the point B on the Chain line
on the other side. Measure AC and CB.

Then , AB=VAC2+CB2

Obstacles in Chaining

2. When chaining is obstructed, but vision is free

Case |: In which it is possible to chain round obstacle

e.g. a pond, a bend in the river, etc.

(d) Select two convenient points A and B
on the chain line PR on opposite sides
of the obstacle(fig.3.41). Select a point
C so that AC and BC Clear the obstacle.
Produce the line AC to E so that CE=AC.
Similarly, continue BC to D so that CD
equals to BC. Measure DE. The triangles
CDE and CBA being equal in all
respects, AB=DE.

Obstacles in Chaining

In which it is not possible to chain round the obstacle,
e.g. a river.
(a) Select two points A and B on the

chain line PR on opposite banks of the
river.

Set out a perpendicular AD and bisect
it at C mid point of AD.

At D erect a perpendicular DE and
mark the point E in line with C and B.
Measure DE.

Since the triangles ABC, CED are
similar,

Hence AB=DE

Obstacles in Chaining

In which it is not possible to chain round the obstacle,
e.g. a river.
IE) , Select two points A

and B on the chain line PR on either side
of the river.

Mark another point E on the chain line.
At A and E erect perpendiculars AC
and ED such that D, C and B are in the
same line.

Measure AC, AE, and ED.

If a line CF is drawn parallel to AE,

meeting ED in F, the triangles ABC and
CFD are similar.

Obstacles in Chaining

In which it is not possible to chain round the obstacle,
e.g. a river.
Therefore,
AB/AC=CF/FD
but
CF=AE and FD=ED-AC
or AB/AC=AE/(ED-AC)
whence,

BA=(ACXAE) /(ED-AC)

Obstacles in Chaining

In which it is not possible to chain round the obstacle,
e.g. a river.

(c) As before select two points A and
B. Set off a perpendicular AD at A.

With a cross staff or an optical
square, erect a perpendicular to DB
at D, cutting the chin line at C.

Measure AD and AC.

Since the triangles ABD and ACD
are similar,

AB/AD=AD/AC.

Hence, AB=AD2/CA

Obstacles in Chaining

In which it is not possible to chain round the obstacle,
e.g. a river.

(d) If a box sextant is available, the
following method may be use.

Fix two points A and B as before.

At A erect a perpendicular AC of any

convenient length so that the triangle
ABC is well conditioned.

Measure AC, and the angle ACB with
the box sextant.

The distance AB may then be calculated
from

AB = AC tan /_ACB = AC tan

Obstacles in Chaining

In which it is not possible to chain round the obstacle,
e.g. a river.

(e) This method is used when a survey
line crosses a river obliquely.

Set out line AE at a convenient angle
with the survey line PR and range point
D in line with E and A, making AD=AE.
Using an optical square, set out
perpendiculars DB and EC to the line DE
at D and E, intersecting the survey line
PR at B and C respectively.

Measure AC. The triangles ADB and

AEC being congruent, the required
length AB is equal to AC.

Obstacles in Chaining

3. When chaining and vision both are obstructed

In this case the problem consists in prolonging the line beyond the obstacle
and determining the distance across it. A building is a typical example of
this class of obstacle.

Choose point A and B on the chain line PR. At A and B erect
perpendiculars AE and BF of equal length. Check the diagonals BE and
AF, which should be equal and also EF, which should be equal to AB.
Prolong the line EF past the obstacle and select two points G and H on it.
At G and H set out perpendiculars GC and HD equal in length to AE. The
points C and D are obviously on the chain line PR and BC= FG.

Great care must be taken in setting
out the perpendiculars very
accurately and to see that their
lengths are exactly equal.

Thank You !
Tags