STAMP Training


Slide Content

Project monitoring IN DMRC THROUGH STAMP - System for Tracking And Monitoring Projects INTRODUCTION CGM/PROJECT

2 STAMP will monitor Progress of all the Contract Packages of Civil & System Works of DMRC Phase-IV Project – Line 7(Extn.), Line 8(Extn.), Line 10, Patna Metro Project and all future Projects of DMRC. STAMP will also monitor issues of work front availability such as Land availability, Tree Transplantation, Shifting of Services and Design Status. Revenue Operation Date (ROD) of each Corridor/Line shall also be monitored through STAMP from Tender Preparation stage to final completion stage of all the Contract Packages of all disciplines of that Corridor/Line. Physical Progress – Planned vs Actual - can be viewed as on date, one month before and Forecast for future months. Past and Present Progress at any stage of the Project/Package can be viewed. All the above features can be viewed on 3D BIM Models . Financial Progress – Planned vs Actual – can be viewed for each contract package for various disciplines and for each corridor. STAMP will be available on cloud , can be operated from any location and accessible to all stakeholders . STAMP – System for Tracking And Monitoring Projects

STAMP – System for Tracking And Monitoring Projects Agency: M/s Mansycom-Nadhi-Excelize consortium. Features: Integration with Primavera schedules (Time Plan). Progress Updation from field through Mobile app. Role based Graphical Dashboards for Project monitoring . Integration with BIM 360 Design Models. Hosting of software on cloud for easy access of data. Provision for Backing up of Data on cloud & on-premises servers .

STAMP - PROCESS FLOW & RESPONSIBILITY MATRIX 4