General principles
Abbreviations
A) General accepted abbreviations, such as, but ot mit, It instead of
international, “Co” instead of "Company’ "kgs or “ks” instead of "klograms”
kos," instead of Industry" o Industrie‘, “Lt instood of “Limited,
“imi instead of ‘manufacturer of “mt instead of “metric tons" may be used
in documents in substitution for a word or vee verso A credit that includes an
‘abbreviation in ta est alow a document t show the same abbreviation or any
‘other abbreviation that has the same meaning, oo show th completo sping
ofthe word or viceversa.
AD 0. Vigulos (Le. slash morts © may result in different meanings and should
not bo used asa substitute fora werd. I, neverthlas, a vigulo e used and
9 contest is apparent, this will oo the use of one or more ofthe options.
For example, condition in credit stating “Red/ Black/Blue" with no further
latiication wil mean only Red or ony Black or any Blue or any combination
cof them,
b. no use oa comma when indicating a range of datain a credit auch as pots
ct loading or discharge or counts origin, may result in iferent meanings
fond should not be used as a substitute ora Worf nevertheless, comma is
used and ne content is apparent ths wil allow the uve of one x more ofthe
‘options, For example, when a craft allows portal shipment and indicates the
porto leading information os “Hamburg, Rotterdam, Antwerp with no further
Clarification. tis wil mean only Hamburg or only Rotterdam or nly Antwerp
ot any combination of them.
Certificates, certifications, declarations and statements
43) When a certificate certification, declaration or statement i required by a cred,
ls tobe signed.
A Winethera certificate, certification, declaration or statement needs tobe dated
wi dopend on the type of certificate, certification, declaration or statement that
has been requested, ts required wording and the wording thet appears within
the document
For example when a credit requires the presentation of a certificate issued by
the comio or is agent stating thatthe vessels no mote than 25 years od, the
certificate may evidence compliance by indicating
12 tho date or yor the vessel was bul. and such dat or yer Is no more than
25 years prior tothe det of shipment o the yer in which shipment was
affected which case a date of ssuonce ls not necessary ot
the wording as stated inthe credit in which coso a date of esvance is
recive, therobycertityng that os ofthat date the vessel was not more than |
25 years ola,
121 maton Coorer a Gamma 060)