FACILITY/PLANT LOCATION:
JAZAN REFINERY &ECONOMIC CITY
Job Hazard Analysis (JHA)
DESCRIPTION OF WORK:
Asphalt Concrete on Road Works
DATE:
CONTRACTOR:
TR/RAPCO
REVISION: 0
Sl.Job Step Identify Hazards & Assess RiskRisk
level
Controls to Eliminate/Reduce Risk
1 Work Preparation Equipment not displayed Inspection or
third party certificate
Incompetent personnel
Damage to property or injury to personnel
Caught in Between
Slip
Tripping Hazard
Medium Check ad ensure all equipment devices to be use that must
be having a valid third party certificate.
Only competent/certified and trained person allowed
operating the heavy equipment.
Work Permit and other pertinent document shall be secured
before any work commence.
 No permit no work policy. Only trained employee for this
particular task shall be allowed.
Foot/Hand protection must be use in all activities and use
proper tools.
Clear the area of unnecessary obstruction.
Walking & working surfaces must be cleaned and not
slippery.
And proper barricading and signages must be in place prior
to commence the activity.
Proper work supervision is must
TBM must be conducted prior to start work
2 Prime coat spreading Slippery
Hot asphalt prime coat
Caught in between
High Ensure area is secure by barricade and signage
Assigned flagman to control vehicles and personnel entering
the area.
Kept away from the moving equipment or asphalt

FACILITY/PLANT LOCATION:
JAZAN REFINERY &ECONOMIC CITY
Job Hazard Analysis (JHA)
DESCRIPTION OF WORK:
Asphalt Concrete on Road Works
DATE:
CONTRACTOR:
TR/RAPCO
REVISION: 0
Without MSDS
Fire hazards
equipment
Provide MSDS for the asphalt chemical ingredients
Ensure Fire extinguisher available at the working area
3 Transporting and placing
of asphalt concrete
mixture, using heavy
equipment
Incident due to failure of not following
Procedure
Struck by moving equipment
Unauthorized personnel
Smoke Inhalation
High Complied with the proper procedure and met the entire safety
requirement prior to start work.
Ensure only certified or competent person allowed on the area
Unauthorized person kept out from the area
Ensure flagman is always guide the moving equipment
Ask crew for final input and if they are clear on their
assignment, where they should be and what they should be
doing.
Ensure all the unauthorized personnel kept away from the
barricaded workplace area
Ensure proper PPE must be worn
Proper work supervision is must
TBM must be conducted prior to start work
4 Asphalt concrete mixing
and laying
Struck by moving equipment High Double check all the part of equipment to ensure that will
be safe to use
Assigned flagman at the working area
Closely monitoring and supervision is required
5 Supervision Poor supervision Medium Ensure that supervisor/foreman and safety must closely
monitoring/supervision during hydro test execution
6 Completion of the activitySlip Medium All the materials to be shifted to the storage area.

FACILITY/PLANT LOCATION:
JAZAN REFINERY &ECONOMIC CITY
Job Hazard Analysis (JHA)
DESCRIPTION OF WORK:
Asphalt Concrete on Road Works
DATE:
CONTRACTOR:
TR/RAPCO
REVISION: 0
Trip and
Hand injury
All the materials including the tools to be removed from the
area.
Proper housekeeping to be done
Ensure use correct PPE’s all times
Emergency
contact
Numbers
TECNICAS REUNIDAS CONTACT NO.
Caner Cihan– Construction Manager 0500174341
Hakan Ayata – HSE Manager 0500605496
Edgar Arada– HSE Superintendent 0541505823
Angel Marques – QA/QC Inspector 0502760610
Yousif Ali – Site Superintendent 0561792587
RAPCO
Bhavani Shankar –Site Manager 0505799498
Cirilo Garrino – HSE Manager 0536322607
REQUIRED SAFETY EQUIPMENT
Hard HatsOther GlovesFace ShieldHand Tools & Power ToolsCranes
Safety Glass

Work Vest

Goggles

Compactor


FACILITY/PLANT LOCATION:
JAZAN REFINERY &ECONOMIC CITY
Job Hazard Analysis (JHA)
DESCRIPTION OF WORK:
Asphalt Concrete on Road Works
DATE:
CONTRACTOR:
TR/RAPCO
REVISION: 0
Steel Toe Boots

Safety Harness

Barricades

Lifting Gear

Cotton Gloves

Self Retracting Lifeline (SRL)

Fire Extinguihsers

Air Hoist/Man Rider

Other Equipments/Materials

Participated Date: Sign Approved by Date: Sign
Bhavani Shankar [Site manager] Caner Cihan [Construction Manager ]
Cirilo Garrino [HSE Manager] Hakan Ayata [HSE Manager]