FACILITY/PLANT LOCATION:
JAZAN REFINERY &ECONOMIC CITY
DESCRIPTION OF WORK:
PVC Installation/Plumbing Works
DATE:
CONTRACTOR:
TR/RAPCO
REVISION: 0
Sl. Job Step Identify Hazards &
Assess Risk
Risk
level
Controls to Eliminate/Reduce Risk
1 Site Preparations Personal Injury
Property Damage
Poor access
Tripping
Slipping
hazardous
Medium Before Star the work conduct the Tool box Talk Meeting
Should be drinking water provided at work location.
Ensure First Aid kit should be available always during the
work period.
Ensure emergency contact numbers should be displayed
Access should check before Transporting
Work area must be clean from all obstructions
Area should barricading
Check the work permit with valid date
2 Housekeeping at work area Tripping Hazards
Personal Injury
Medium Maintain good housekeeping in work area and mainly free
from obstruct the Walk way
Do not throw any liquids in the floor/Ground
3 PVC Pipe Tie –in
Personal Injury
Property Damage
Inhalation and
Skin contact
Medium Ensure Trained and Designated Fabricator Should fabricate
the spools
Ensure Arrangement for sufficient passage of Exhaust
Ensure Continues supervisor Required
Ensure Grind M/C and Cutting M/C in good condition and
color coded (Inspection done).
Ensure enough space required for fabrication.
Ensure in case rain / sand storm will comes we should
Page1
FACILITY/PLANT LOCATION:
JAZAN REFINERY &ECONOMIC CITY
DESCRIPTION OF WORK:
PVC Installation/Plumbing Works
DATE:
CONTRACTOR:
TR/RAPCO
REVISION: 0
proper cover the electricals and Electrical Equipments.
Ensure while raining all outside work activity will be stop.
4 Temporary Electrical Cables Electrical Shock
Fire
Property damage
High Temporary Maintenance Electrical Cables take above the
ground level
Main Distribution Box should itself MCB & RCCB is
required.
Every day Electrical Supervisor, Electrician
Should check the electrical D.B and equipments.
Ensure check the inspection visibly, monthly should
record.
Before ending shift area surround check
Permit receiver closeout daily permit
Cleaning of Laminated Joints Cut Injury
Eye Injury
Medium Ensure while cleaning use hand gloves
Ensure while cleaning the spirituals fall down in eyes.
Ensure continues supervision required
5 Support Cutting & Grinding Disk breaking
flying of sparks causing
Injury
Fire Injury to workers by
slipping/ Electric shock /
Property Damage due to
electrical fire
High Ensure check the Hot work permit with valid date
Ensure Before start any hot works inform to Safety Dept.
Ensure Gas free certification permit received from safety
then only start the hot work
Ensure before start any Existing headers work check the
pipe line should be isolate.
Provide proper Fire Extinguisher (ABC)
Ensure proper PPE should use Welding Helmet, apron, Etc.
Page2
FACILITY/PLANT LOCATION:
JAZAN REFINERY &ECONOMIC CITY
DESCRIPTION OF WORK:
PVC Installation/Plumbing Works
DATE:
CONTRACTOR:
TR/RAPCO
REVISION: 0
Use proper fire blanket in the Hot Work area
Ensure Arrangement for sufficient passage of air
Ensure work area always keep clean and tidy.
Ensure hot work area fire watch required
Ensure any flammable liquid in welding area remove (or)
properly secured then start the hot work job
Ensure Electrical cables are good condition
Check the Grinding machine in good condition
Ensure grinding m/c have safety guard and handle
Any electrical problems inform to maintenance Electrician
or Electrical Supervisor
Maintain good housekeeping
6 Fabrication spools Hydro TEST
Pressuring
Bursting High Ensure Hydro testing area should be barricade
Ensure Provide CAUTION and Danger Sign
Boards
Ensure pressurize Slowly
Ensure provide Safety Pressure relief valve
Ensure use calibrated pressure gauge certified
by third party.
Ensure do not over pressure
Ensure use safe access
7 De pressurizing Bursting
collapse of Pipe
High Ensure Open vent line valve Highest Position
Ensure Drain Water slowly to avoid generation of vacuum
Page3
FACILITY/PLANT LOCATION:
JAZAN REFINERY &ECONOMIC CITY
DESCRIPTION OF WORK:
PVC Installation/Plumbing Works
DATE:
CONTRACTOR:
TR/RAPCO
REVISION: 0
Ensure collect Drain water in separate Tank or Inform to
operation supervisor to drain in drain line.
Emergency Contact
Numbers
TECNICAS REUNIDAS CONTACT NO.
Caner Cihan– Construction Manager 0500174341
Hakan Ayata – HSE Manager 0500605496
Jenesh – HSE Superintendent 0515086133
Edgar Arada– HSE Superintendent 0541505823
Angel Marques – QA/QC Inspector 0502760610
Yousif Ali – Site Superintendent 0561792587
RAPCO
Samson David –Site Manager 0505799498
Cirilo Garrino – HSE Manager 0536322607
REQUIRED SAFETY EQUIPMENT
Hard Hats Other Gloves Face Shield Hand Tools & Power ToolsCranes
Page4
FACILITY/PLANT LOCATION:
JAZAN REFINERY &ECONOMIC CITY
DESCRIPTION OF WORK:
PVC Installation/Plumbing Works
DATE:
CONTRACTOR:
TR/RAPCO
REVISION: 0
Safety Glass
Work Vest
Goggles
Compactor
Steel Toe Boots
Safety Harness
Barricades
Lifting Gear
Cotton Gloves
Self Retracting Lifeline (SRL)
Fire Extinguihsers
Air Hoist/Man Rider
Other Equipments/Materials
Participated Date: Sign Approved by Date: Sign
Bhavani Shankar
[Site manager]
Cirilo Garrino
[HSE Manager]
Hakan Ayata
[HSE Manager]
Caner Cihan
[Construction Manager ]