FACILITY/PLANT LOCATION:
JAZAN REFINERY &ECONOMIC CITY
DESCRIPTION OF WORK:
HAND BRUSH PAINTING
DATE:
CONTRACTOR:
TR/RAPCO
REVISION: 0
Sl. Job Step Identify Hazards &
Assess Risk
Risk
level
Controls to Eliminate/Reduce Risk
1 Work planning prior to start In competent person
Poor planning
Non- compliances to PPE
requirement
Permit To Work Only
Do not start any work preparation until signed permit is in hand
All involved departments and contractor shall have a joint
Inspection and a meeting prior start the job
Survey work area and address safe work method .hazards and
Precaution
JSA must be followed and to be explained to all employees
During TBT prior to start of activities and it must be made
Available at the site
2 Site preparations Un authorized person entry
Poor access
Tripping slipping hazardous
Medium work location must be barricaded and signboard shall be placed
prior to start area must be clean and tidy
work materials and tools properly stored
TBT shall be conducted prior to start
3 Painting storage Chemical spill
Fire& explosion
Chemical reaction
High Provide proper shelter for chemical storage
Fire extinguisher required
MSDS must be required at Paint storage area
DO not keep any unnecessary materials in the paint storage area
Spill kit shall be required on site
4 Hand brush paintings Chemical spill
Oxygen deficiency
Vomiting
Skin damage
High Proper PPE must be worn spatially chemical protection mask and
Hand gloves [including respirator]
Before take a food/ drinking water hand must be wash
Proper supervision required
FACILITY/PLANT LOCATION:
JAZAN REFINERY &ECONOMIC CITY
DESCRIPTION OF WORK:
HAND BRUSH PAINTING
DATE:
CONTRACTOR:
TR/RAPCO
REVISION: 0
5
House keeping
Fire
Person injury
Poor access
Tripping slipping falling hazard
Medium
Fire extinguisher keep at work place
Access free from obstruction
Work location must be clean and tidy
Materials properly stored
Unnecessary materials remove from the location and avoid
Slipping tripping falling hazard
6 Permit closeout Before ending shift area surround check
Permit receiver closeout daily permit
7 Emergency contact
Numbers
TECNICAS REUNIDAS CONTACT NO.
Caner Cihan– Construction Manager 0500174341
Hakan Ayata – HSE Manager 0500605496
Edgar Arada– HSE Superintendent 0541505823
Angel Marques – QA/QC Inspector 0502760610
Yousif Ali – Site Superintendent 0561792587
RAPCO
Samson David –Site Manager 0505799498
Salim KA – HSE Manager 0583431641
FACILITY/PLANT LOCATION:
JAZAN REFINERY &ECONOMIC CITY
DESCRIPTION OF WORK:
HAND BRUSH PAINTING
DATE:
CONTRACTOR:
TR/RAPCO
REVISION: 0
REQUIRED SAFETY EQUIPMENT
Hard Hats Other Gloves Face Shield Hand Tools & Power ToolsCranes
Safety Glass
Work Vest
Goggles
Compactor
Steel Toe Boots
Safety Harness
Barricades
Lifting Gear
Cotton Gloves
Self Retracting Lifeline (SRL)
Fire Extinguihsers
Air Hoist/Man Rider
Other Equipments/Materials
Participated Date: Sign Rew by Date Sign Approved by Date: Sign
Samson david
[Site manager]
Salim. ka
Habib
[Safety
Supervisor]
Ganesh
[supervisor]