FACILITY/PLANT LOCATION:
JAZAN REFINERY &ECONOMIC CITY
DESCRIPTION OF WORK:
PVC installation for Service Water
DATE:
CONTRACTOR:
TR/RAPCO
REVISION: 0
Sl. Identify Hazards & Assess
Risk
Identify Hazards &
Assess Risk
Risk
level
Controls to Eliminate/Reduce Risk
1 Pre-task briefing and inspection Untrained person
Absence off permit
Hand injury during lifting/Slips,
Trips
Poor illumination
Uncertified forklift operator
Forklift not Inspected/
maintenance
Planning of lifting
Medium Ensure that the pre task briefing is given out in a language
understood by the work force, have it translated.
Ask question regarding the briefing to get feedback from
the staff, this ensures full comprehension.
Issue any required PPE and must include both hearing
protection as well as dust inhalation protection.
Forklift must be certified by a third party.
The person assigned for the job must be competent and
authorized
Always obtain the permit prior to start the work
Proper hand gloves must be worn always
Always maintain good housekeeping in the working area
2 Lifting of materials Serious injury or property
damage due to unsafe lifting
Lifting over personnel
Hand injury
Pinch point
Injury to personnel due to
unsafe access
Medium Flagman should wear visible (orange) vest.
Cautious of the pinch point and hands off from the pinch
point when setting down the materials.
Apropriate hand gloves must be worn while working.
3 PVC Transfer by manual and Pipe layout Falling Medium Proper PPE must be worn at all times
FACILITY/PLANT LOCATION:
JAZAN REFINERY &ECONOMIC CITY
DESCRIPTION OF WORK:
PVC installation for Service Water
DATE:
CONTRACTOR:
TR/RAPCO
REVISION: 0
Slipping
Tripping
Hand injury
Back pain
Monitoring and supervision of supervisor and safety is required
Use safe access and egress and must kept always that free from
obstruction
Maintain good position for manual lifting
TBM must conduct prior to start work
4 PVC Cutting by hand tools and Fixing
manually
Hand injury
Skin and eyes damaged
Fire
Medium Proper/specific tools for specific job required
Proper PPE must be worn, such as hand gloves and
respirator/dust mask
Proper storage and disposal of chemical as per MSDS
MSDS for chemical use must available in the area
Eye wash and First Aid Kit exist at the work area
Closely supervision of the supervisor/safety officer
Fire extinguisher must keep at the work place
5 Housekeeping Trip
Slip
Fall
Tripping hazards
Medium Materials properly stored
Maintain good housekeeping in work area and mainly free from
obstruct the Walk ways
Do not throw any liquids in the ground
Ensure use correct PPE’s all the times
6 Completion of the activity Slip
Trip and
Fall hazards
Hand injury
Medium All the materials to be shifted to the storage area.
All the materials including the tools to be removed from the area.
Proper housekeeping to be done
Ensure use correct PPE’s all times
Emergency contact
Numbers
TECNICAS REUNIDAS CONTACT NO.
Caner Cihan– Construction Manager 0500174341
Hakan Ayata – HSE Manager 0500605496
FACILITY/PLANT LOCATION:
JAZAN REFINERY &ECONOMIC CITY
DESCRIPTION OF WORK:
PVC installation for Service Water
DATE:
CONTRACTOR:
TR/RAPCO
REVISION: 0
Edgar Arada– HSE Superintendent 0541505823
Angel Marques – QA/QC Inspector 0502760610
Yousif Ali – Site Superintendent 0561792587
RAPCO
Samson David –Site Manager 0505799498
Cirilo Garrino – HSE Manager 0536322607
REQUIRED SAFETY EQUIPMENT
Hard Hats Other Gloves Face Shield Hand Tools & Power ToolsCranes
Safety Glass
Work Vest
Goggles
Compactor
Steel Toe Boots
Safety Harness
Barricades
Lifting Gear
Cotton Gloves
Self Retracting Lifeline (SRL)
Fire Extinguihsers
Air Hoist/Man Rider
Other Equipments/Materials
FACILITY/PLANT LOCATION:
JAZAN REFINERY &ECONOMIC CITY
DESCRIPTION OF WORK:
PVC installation for Service Water
DATE:
CONTRACTOR:
TR/RAPCO
REVISION: 0
Participated Date: Sign Approved by Date: Sign
Samson David
[Site manager]
Cirilo Garrino
[HSE Manager]
Hakan Ayata
[HSE Manager]
Caner Cihan
[Construction Manager ]