FACILITY/PLANT LOCATION:
JAZAN REFINERY &ECONOMIC CITY
DESCRIPTION OF WORK:
PVC installation for Service Water
DATE:
CONTRACTOR:
TR/RAPCO
REVISION: 0
Sl. Identify Hazards & Assess
Risk
Identify Hazards &
Assess Risk
Risk
level
Controls to Eliminate/Reduce Risk
1 Pre-task briefing and inspection Untrained person
Absence off permit
Hand injury during lifting/Slips,
Trips
Poor illumination
Uncertified forklift operator
Forklift not Inspected/
maintenance
Planning of lifting
Medium Ensure that the pre task briefing is given out in a language
understood by the work force, have it translated.
 Ask question regarding the briefing to get feedback from
the staff, this ensures full comprehension.
Issue any required PPE and must include both hearing
protection as well as dust inhalation protection.
Forklift must be certified by a third party.
The person assigned for the job must be competent and
authorized
Always obtain the permit prior to start the work
Proper hand gloves must be worn always
Always maintain good housekeeping in the working area
2 Lifting of materials Serious injury or property
damage due to unsafe lifting
Lifting over personnel
Hand injury
Pinch point
Injury to personnel due to
unsafe access
Medium Flagman should wear visible (orange) vest.
Cautious of the pinch point and hands off from the pinch
point when setting down the materials.
Apropriate hand gloves must be worn while working.


3 PVC Transfer by manual and Pipe layout Falling Medium Proper PPE must be worn at all times

FACILITY/PLANT LOCATION:
JAZAN REFINERY &ECONOMIC CITY
DESCRIPTION OF WORK:
PVC installation for Service Water
DATE:
CONTRACTOR:
TR/RAPCO
REVISION: 0
Slipping
Tripping
Hand injury
Back pain
Monitoring and supervision of supervisor and safety is required
Use safe access and egress and must kept always that free from
obstruction
Maintain good position for manual lifting
TBM must conduct prior to start work
4 PVC Cutting by hand tools and Fixing
manually
Hand injury
Skin and eyes damaged
Fire
Medium Proper/specific tools for specific job required
Proper PPE must be worn, such as hand gloves and
respirator/dust mask
Proper storage and disposal of chemical as per MSDS
MSDS for chemical use must available in the area
Eye wash and First Aid Kit exist at the work area
Closely supervision of the supervisor/safety officer
Fire extinguisher must keep at the work place
5 Housekeeping Trip
Slip
Fall
Tripping hazards
Medium Materials properly stored
Maintain good housekeeping in work area and mainly free from
obstruct the Walk ways
Do not throw any liquids in the ground
Ensure use correct PPE’s all the times
6 Completion of the activity Slip
Trip and
Fall hazards
Hand injury
Medium All the materials to be shifted to the storage area.
All the materials including the tools to be removed from the area.
Proper housekeeping to be done
Ensure use correct PPE’s all times
Emergency contact
Numbers
TECNICAS REUNIDAS CONTACT NO.
Caner Cihan– Construction Manager 0500174341
Hakan Ayata – HSE Manager 0500605496

FACILITY/PLANT LOCATION:
JAZAN REFINERY &ECONOMIC CITY
DESCRIPTION OF WORK:
PVC installation for Service Water
DATE:
CONTRACTOR:
TR/RAPCO
REVISION: 0
Edgar Arada– HSE Superintendent 0541505823
Angel Marques – QA/QC Inspector 0502760610
Yousif Ali – Site Superintendent 0561792587
RAPCO
Samson David –Site Manager 0505799498
Cirilo Garrino – HSE Manager 0536322607
REQUIRED SAFETY EQUIPMENT
Hard Hats Other Gloves Face Shield Hand Tools & Power ToolsCranes 
Safety Glass

Work Vest

Goggles

Compactor
 
Steel Toe Boots

Safety Harness

Barricades

Lifting Gear
 
Cotton Gloves

Self Retracting Lifeline (SRL)

Fire Extinguihsers

Air Hoist/Man Rider

Other Equipments/Materials

FACILITY/PLANT LOCATION:
JAZAN REFINERY &ECONOMIC CITY
DESCRIPTION OF WORK:
PVC installation for Service Water
DATE:
CONTRACTOR:
TR/RAPCO
REVISION: 0
Participated Date: Sign Approved by Date: Sign
Samson David
[Site manager]
Cirilo Garrino
[HSE Manager]
Hakan Ayata
[HSE Manager]
Caner Cihan
[Construction Manager ]