KICK OFF MEETING
CPA Mainline Revitalization and
Structure Reinforcement
About us
PT. Meindo Elang Indah is one of the leading EPCI contractors in
Indonesia, providing fully integrated solutions in Engineering,
Procurement, Construction and Installation services for the
Petrochemical, Energy and upstream Oil and Gas Industry.
Founded in 1987, Meindo commenced its Engineering and
Construction business in 1991 as petrochemical contractor before
venturing into the upstream Oil and Gas sector. We clinched our first
project (Peciko I) in 1997 for Total E&P Indonesie. Since then, we
have successfully managed more than 150 Oil and Gas in Indonesia.
With over 30 years of experience, Meindo has built our local
presence as leader in topside, jacket and module fabrication and
onshore/offshore pipeline installation in Indonesia.
CONTRACTOR’S PROFILE
CONTENTS
1
2
3
4
Project Scope
of Work
Project Key
Personnel
HSEQA/QC
5
Yard
MEINDO
PROJECT SCOPE OF WORK
Gas Lift Compressor
HEOR Compressor
3 LP Separators
Gas Compressor
Metering & Export Line
Location Platform CPA – Process Area
PROJECT SCOPE OF WORK
CPA Mainline Revitalization and Structure Reinforcement
S
STRUCTURE The structural work shall include but not limited to
fabrication and installation extension platform, pipe
support, handrail, stair and ladder, trolley beam,
lifting structure, etc.
P
PIPING The piping fabrication and installation work shall include, but not be limited to welding joint, including cutting, beveling, flushing assistance, spading/de-spanding, hydrostatic test, leak test (including valve test), other piping work required by COMPANY.
B
BLASTING and PAINTING The blasting and painting work shall including, but not be limited to surface preparation, blasting work, painting/coating application and inspection
PROJECT SCOPE OF WORK CPA Mainline Revitalization and Structure Reinforcement
PROJECT
BACKGROUND
PROJECT
OBJECTIVE
EXPECTED
RESULTS
PROJECT SCOPE OF
WORK Project Background In the context of construction maintenance
and for repairs or modifications to the main
pipeline in the CPA (HGL – Gas Compressor).
And also for structural strengthening in the
area Gas Compressor
PROJECT SCOPE OF WORK Project Objectives The purpose of this work is to provide COMPANY with
general construction services for construction maintenance,
repair of CPA main lines or modifications and structural
repairs or modifications necessary to support COMPANY’s
operations in CPA
PROJECT SCOPE OF
WORK Expected Results The expected result of this work is to be able
to complete the mainline installation work
(HGL – Gas Compressor) and strengthen the
platform structure in the Gas Compressor
area safely, securely and with quality
PROJECT KEY PERSONNEL
CPA Mainline Revitalization and Structure Reinforcement
HP
RM
Heber Pangaribuan
Project Manager
Ronald Abel Marthin Sirait
Site Manager
IS
HC
Ilham Sihaloho
Planner
Hanna Cynthia
Project Engineer
W
MS
Wahyudin
Manager QA/QC
M.Solihin
HSE Lead
HSE PROJECT HSE KPI
LEADING INDICATORS - INPUT
Periodical 100% MCU program 1
New Worker / Per 6 bulan 100% HSE Induction 2
Internal & External As per training schedule HSE Training 3
Site / Yard 30 /Month Observation Card (CerMat / Teliti Card) 4
Site / Yard Monthly HSE Reward 5
Site / Yard Biweekly Equipment & Tools Inspection 6
Site / Yard Daily Tool Box Meeting 7
Yard Weekly Weekly Safety Talk 8
LEGGING INDICATORS - OUTPUT
REMARK TARGET DESCRIPTION No
0 Fatality 1
0 LTIFR 2
0 TRIR 3
0 Environmental Breach 4
HSE PROJECT HSE KPI
LEADING INDICATORS - INPUT
As per schedule / Refer to CPY Tentative Emergency Drill / Exercise 9
Yard / Site Bimonthly HSES Campaign 10
Yard Bimonthly HSE Coordination Meeting 11
SM/PM,HSE Lead Bimonthly Management Site Visit 12
HSE Lead PM & Corporate 2x /Year Senior Management Visit 13
Corporate, PM, PMT 2x /Year HSE Committee Meeting (OHSEC) 14
Yard 2x /Year Project Internal Audit 15
Tentative 2x /Year Subcontractor Audit 16
Site Biweekly Site Hygiene & Sanitation Inspection 17
Site Daily
Daily Check Up Worker
(Blood pressure & Temperature etc.)
18
HSE PROCEDURE & MOU HSE PROCEDURE •Project Health Safety and Environment Plan
•Emergency Response Plan & Bridging Document
•Waste Management Plan
MOU/PERJANJIAN KERJASAMA & PERIJINAN
•Clinic Maju Sejahtera (Handil)
•Hospital Siloam Balikpapan
•Temporary storage permit for waste & hazard ous waste (B3Permit for Transportation
and Collect of Hazardous and Toxic Substances (B3)
PT. Sinar Bintang Albar & BES.
HSE ENVIRONMENTAL & WASTE CONTROL ENVIRONMENTAL : • Housekeeping program
• Hazardous material handling:
- Trained worker
- MSDS provided
- Storage & Spill kit WASTE SEGREGATION
Burnable
Waste
Food
Waste
Hazardous
Waste
Scrap
metal
WASTE HANDLING (Comply to CPY & Government Regulation)
• Assignment of Environmental Officer.
• Collect of wastes includes record and report
•Temporary storage (includes legal permit for temporary hazardous waste)
Transportation facilities as a carrier and collect of hazardous and toxic waste
provided by PT. Sinar Bintang Albar.
HSE EMERGENCY RESPONSE PLAN & PERMIT TO WORK 1. Project Emergency & medevac plan
implementation.
2. Bridging Emergency & medevac plan
3. ER-Team (Trained).
4. Emergency equipment & tools.
5. First Aid Clinic
6. Ambulance stand by
7. Sea Truck stand by
8. Hospital (MOU) / RS Samboja, Siloam
9. Emergency Exercise/Drill.
PTW MATRIX & IMPLEMENTATION
CPY PTW SYSTEM CTR PTW SYSTEM ACTIVTY / LOCATION
√ Fabrication Yard / Workshop
√ Site / Field
EMERGENCY RESPON PLAN
PERMIT TO WORK (Workshop & Fabrication)
YARD INFORMATION
ANNUAL THROUGHPUT
MAXIMUM LOADOUT CAPACITY
TOTAL AREA
SKIDWAYS
WATER DEPTH
16.000 TONS
2.500 TONS
16.6 HA
180m x 15.5 m
100m x 18m
5m
Covered Workshop 10.000m²
Covered Warehouse 4.000m²
Assembly Area 30.000m²
Welding Capability SMAW, FCAW, TIG, SAW
Crawler Cranes 110 to 500T lifting capacity
Gantry Cranes 5 TO 20T workshop and outdoor
Thank you CPA Mainline Revitalization and
Structure Reinforcement