Manual tuberias pvc ribloc

2,288 views 28 slides Oct 23, 2019
Slide 1
Slide 1 of 28
Slide 1
1
Slide 2
2
Slide 3
3
Slide 4
4
Slide 5
5
Slide 6
6
Slide 7
7
Slide 8
8
Slide 9
9
Slide 10
10
Slide 11
11
Slide 12
12
Slide 13
13
Slide 14
14
Slide 15
15
Slide 16
16
Slide 17
17
Slide 18
18
Slide 19
19
Slide 20
20
Slide 21
21
Slide 22
22
Slide 23
23
Slide 24
24
Slide 25
25
Slide 26
26
Slide 27
27
Slide 28
28

About This Presentation

manual de trabajo tuberas rib look


Slide Content

INDUSTRIA COLOMBIANA
Fecha última Edición
Nueva Edición 2009/06/24
2008/06/10
Condiciones de Instalación
y Diseño RIB LC® y RIB STEL®

O E
IMPRIME ELEMENTOS PUBLICITARIOS
Bogotá D.C.

Condiciones de Instalación
y Diseño RIB LC y RIB STELO E® ®
40 2
CALIDAD CERTIFICADA
NTC 4764LCO
RIB
®
Fecha: Marzo de 2009
Ubicación: Vía Cajicá – Zipaquirá
Cundinamarca -Colombia
Obra: Viaducto Portachuelo
Características: Viaducto PortachueloRIB LC® 654 mm
Longitud: 3000 m
Licita: Devinorte
Construye: Civilia
Descripción:
Innovando en Colombia con este sistema constructivo de
puentes, Diseñador y Constructor, utilizan la tubería RIB
LC® como aligeramiento de las losas principales del
viaducto.
Las tuberías son ensambladas previamente para ser hizadas
posteriormente y localizadas exactamente sobre la parrilla.
Para este proyecto las tuberías se fabrican con requisitos
especiales de longitud y diámetro exterior y se suministraron
tapones herméticos para el proceso de
llenado. El desperdicio es nulo.
Con esta metodología, en obra se han optimizado los
procesos constructivos y se está contribuyendo a la
protección del medio ambiente el no promover
aligeramientos de origen vegetal.
O
O
Ficha Técnica

+
+
+
+
+
+
+
+
+
+
+
+
+
+
+Ventajas de la Unión 17
+Altura de Relleno Mínimo para el Equipo de Compactación 17
+
+
+
+
+
+
+Detalle conexión de pozos de inspección 25
+Granulometría de materiales 26
+Mantenimiento, Colocación de la Unión en la Obra 26
+Mantenimiento, Procedimiento para el corte del tubo en la obra 27
+Diseño Hidráulico RIB LC y RIB STEL 28
+
+
Ventas del sistema RIB LC® y RIB STEL® 4
Presentación y Rotulado de tubería RIB LC® y RIB STEL® 5
Oportunidades ambientales del sistema RIB LC® y RIB STEL® 5
Especificaciones técnicas de la tubería RIB LC® y RIB STEL® 6
Diámetros internos y Rendimiento cemento-solvente y limpiador 6
Accesorios de PVC RIB LC® y RIB STEL® 8
Cargue de Tubería RIB LC® y RIB STEL® 8
Descargue de Tubería 11
Almacenamiento de tubería 12
Instalación de la tubería 13
Elaboración de la Zanja 14
Cimentación 15
Colocación de la tubería RIB LC® y RIB STEL® 16
Unión de la Tubería 16
Zona de atraque y relleno inicial 18
Relleno Final 19
Instalación de sillas de derivación 20
Instalación de derivación en tubería RIB LC® y RIB STEL® 21
Condiciones específicas dependiendo de la altura de relleno 22
Conexión de Tuberías RIB LC® y RIB STEL®a pozos de inspección 24
® ®
Anexo 1: Ficha Técnica 40
Anexo 2:Certificados de Calidad 41
O E
O E
O E
O E
O E
O E
O E
O E
O E
O E
Tabla de Contenido
CALIDAD CERTIFICADA
NTC 4764
2 39
LCO
RIB
®
Propiedades Mecánicas de los Tubos RIB STEL PS 46E®
+ ®
+TABLA 2. Diámetros internos RIB STEL® Rendimiento cemento-solvente y limpiador 7
+TABLA 3. Cargue de Tubería RIB LC® 9
+TABLA 4. Almacenamiento de la tubería ® 12
+TABLA 5. Instalación de la tubería ® 13
+TABLA 6. Altura de Relleno Mínimo para el Equipo de Compactación 17
+TABLA 7. Zona de Atraque y Relleno Inicial 19
+TABLA 8. ® ®
+
+ ® ® 28
+TABLA 11. ® ® 28
+TABLA 12. Tabla de Caudales y Velocidades según Manning 29
+TABLA 13. Propiedades Mecánicas de los Tubos RIB LC® 37
+ ®
+ ®
TABLA 1. Diámetros internos RIB LC Rendimiento cemento-solvente y limpiador 6
RIB LC
RIB LC y RIB STEL
Conexión de Tuberías RIB LC y RIB STELa pozos de inspección 25
TABLA 9. Granulometría de materiales 26
TABLA 10. Diseño Hidráulico RIB LC y RIB STEL
Diseño Hidráulico RIB LC y RIB STEL
TABLA 14. Propiedades Mecánicas de los Tubos RIB STEL PS 10 38
TABLA 15. Propiedades Mecánicas de los Tubos RIB STEL PS 46 39
O
E
O
O
O E
O E
O E
O E
O
E
E
Indice de Tablas
Diametro
Interno
Diametro
Externo
Momento de
Inercia
Rigidez del
Tubo
Area de la
Pared
Peso
mm mm mm4/mm PS (kN/m2) m2/m
kg/m
500 566 1.104 1.183,43 0,00511 21,1
550 616 1.104 896,89 0,00511 23,2
600 666 1.104 695,87 0,00511 25,3
650 716 1.285 641,00 0,00511 27,4
700 766 1.285 515,94 0,00511 29,5
750 816 1.285 421,41 0,00511 31,6
800 866 1.285 348,63 0,00511 33,8
825 891 1.285 318,47 0,00511 34,8
850 916 2.607 591,89 0,00527 38,2
900 966 2.607 500,20 0,00527 40,4
950 1016 2.607 426,52 0,00527 42,7
975 1041 2.607 395,06 0,00527 43,8
1000 1066 3.816 536,59 0,00729 56,8
1050 1116 3.816

464,60 0,00729 59,7
1100 1193 5.471

580,46 0,00810 87,1
1125 1218 5.471

543,15 0,00810 89,1
1150 1243 5.471

508,97 0,00810 91,1
1200 1293 5.471

448,75 0,00810 95,0
1250 1343 5.471

397,67 0,00810 99,0
1275 1368 5.471

375,02 0,00810 101,0
1300 1393 7.126

461,17 0,00810 103,0
1350 1443 7.126

412,37 0,00810 106,9
1400 1493 7.126

370,23 0,00810 110,9
1450 1543 7.953

372,38 0,00810 114,8
1500 1593 7.953

336,74 0,00810 118,8

Tubería Perfilada de PVC






Los Tubos y Accesorios de PVC RIB LC® están diseñados y garantizados para uso
en Alcantarillados como:
+Sistema para la recolección
+Conducción y disposición final de las aguas residuales y/o de las aguas lluvias
+Para la rehabilitación de tuberías en alcantarillados existentes.
Otros Usos:
Cruces Viales
Sustitución de canales de riego
Entubamiento de cauces superficiales
Tanques de Agua
Formaleta para columnas
Aligeramiento de puentes
Juntas frías en la construcción de pantallas
Los Tubos de PVC RIB LC® y RIB STEL® se fabrican empleando compuesto de PVC
Rígido Tipo I, Grado I (12454), como lo especifica la norma NTC-369 (ASTM D-1784),
cumpliendo con los requisitos establecidos en la NTC 4764 que tiene como
antecedentes la norma DIN 16961 partes 1 y 2 y la norma ASTM F794 para uso en
Alcantarillados. Adicionalmente cumplen con los requisitos establecidos en el
reglamento técnico del sector de agua potable y saneamiento básico RAS 2000.
Igualmente cumple con los requisitos del Reglamento de tuberías del MAVDT
expedido en la Resolución 1166 de 2006 y 1127 de 2007
El sistema RIB LC® se basa en la extrusión de un perfil machihembrado
longitudinal; mediante un práctico proceso de fabricación, las bandas de perfil son
introducidas en equipos donde se conforma el tubo mediante un desarrollo
helicoidal, cuyos traslapes son mecánicamente asegurados por medio del
machimbre y químicamente fusionados mediante una solución de cemento solvente
de PVC.
La tecnología RIB LC® facilita incorporar externamente un fleje de acero
galvanizado, integrándolo mecánicamente al perfil de PVC, para conformar tuberías
de grandes diámetros manteniendo sus cualidades de bajo peso y fácil instalación.
El resultado es un ente estructural muy versátil llamado RIB STEL® .
O
O E
O
O
E
+
+
+
+
+
+
+

CALIDAD CERTIFICADA
NTC 4764
38 3
LCO
RIB
®
Propiedades Mecánicas de los Tubos RIB STEL PS 10E®
Diametro
Interno
Diametro
Externo
Momento de
Inercia
Rigidez del
Tubo
Area de la
Pared
Peso
mm mm mm4/mm PS (kN/m2) m2/m
kg/m
500 550 531 569,34 0,00498 16,2
550 600 531 431,49 0,00498 17,9
600 650 531 334,78 0,00498 19,5
650 700 531 264,94 0,00498 21,1
700 750 531 213,25 0,00498 22,7
750 800 531 174,18 0,00498 24,3
800 850 531 144,10 0,00498 26,0
825 875 531 131,63 0,00498 26,8
850 916 1.402 318,26 0,00511 35,86
900 966 1.402 268,96 0,00511 37,97
950 1016 1.402 229,34 0,00511 40,08
975 1041 1.402 212,42 0,00511 41,14
1000 1066 1.402 197,13 0,00511 42,19
1050 1116 1.402 170,68 0,00511 44,30
1100 1166 1.402 148,76 0,00511 46,41
1125 1191 1.402 139,20 0,00511 47,47
1150 1216 1.402 130,44 0,00527 48,52
1200 1266 2.607 213,89 0,00527 50,63
1250 1316 2.607 189,54 0,00527 56,12
1275 1341 2.607

178,75

0,00527 57,25
1300 1366 2.607

168,75

0,00527 58,37
1350 1416 2.607

150,90

0,00527 60,61
1400 1466 2.607

135,48

0,00527 62,86
1450 1516 2.607

122,09

0,00527 65,10
1500 1566 2.607

110,40

0,00527 67,35
1550 1643 3.816

146,60

0,00729 88,06
1600 1693 3.816

133,42

0,00729 90,90
1650 1743 3.816

121,76

0,00729 93,74
1700 1793 3.816

111,43

0,00729 96,58
1750 1843 3.816

102,23

0,00729 99,42
1800 1893 3.816

94,02

0,00729 102,26
1850 1943 3.816

86,67

0,00729 105,10
1900 1993 3.816

80,06

0,00729 107,94
1950 2043 3.816

74,10

0,00729 110,78
2000 2093 7.126

128,32

0,00810 158,77
2050 2143 7.126

119,23

0,00810 162,74
2100 2193 7.126

110,98

0,00810 166,71
2150 2243 7.126

103,47

0,00810 170,68
2200 2293 7.126

96,63

0,00810 174,65
2250 2343 7.126

90,37

0,00810 178,62
2300 2393 7.126

84,64

0,00810 182,59
2350 2443 7.126

79,39

0,00810 186,56
2400 2493 7.126

74,56

0,00810 190,53
2450 2543 7.126

70,12

0,00810 194,50
2500 2593 7.126

66,02

0,00810 198,47

+ Única tubería flexible para alcantarillado fabricada en
PVC con refuerzo en acero.
+ Facilidad en el manejo durante el cargue, transporte,
descargue y almacenamiento por su bajo peso.
+ Tubería para alcantarillado con un amplio rango de
diámetros y longitudes.
+Única tubería para alcantarillado con uniones
herméticas químicamente soldadas, garantizando la
estanqueidad frente a movimientos telúricos o
asentamientos diferenciales del suelo a través del
tiempo, gracias a la combinación de flexibilidad-
integridad (ver anexo 1).
+Alta resistencia a efectos corrosivos y abrasivos
disminuyendo los costos de mantenimiento y
prolongando la vida útil de los proyectos. Además
óptimo comportamiento en suelos ácidos y alcalinos.
+ Alto rendimiento durante el proceso de instalación
disminuyendo costos y tiempo.
+ Fácil instalación aún en lugares de muy difícil acceso.
+ Mayor relación beneficio costo con respecto a otros
sistemas utilizados en alcantarillado.
+Uniones incorporadas y bajo costo cuando se requieren
adicionales.
+Amplia gama de accesorios.
Ventajas del Sistema RIB LC y RIB STELO E® ®
CALIDAD CERTIFICADA
NTC 4764
4 37
Tunja, Colector Jordán
El Yopal, Emisario Final
LCO
RIB
®
Propiedades Mecánicas de los Tubos RIB LCO ®
Diametro
Interno
Diametro
Externo
Momento de
Inercia
Rigidez del
Tubo
Area de la
Pared
Peso
mm mm mm4/mm PS (kN/m2) m2/m
kg/m




160 174 8,05 266,00 0,00196 1,7
200 214 8,05 138,56 0,00196 2,1
225 239 8,05 98,07 0,00196 2,4
250 264 8,05 71,93 0,00196 2,6
275 296 31,96 215,62 0,00323 4,3
300 321 31,96 166,78 0,00323 4,7
325 346 31,96 131,65 0,00323 5,1
350 371 31,96 105,73 0,00323 5,5
375 396 31,96 86,19 0,00323 5,9
400 421 31,96

71,19

0,00323 6,3
425 446 91,16

169,61

0,00356 7,8
450 482 91,16

143,15

0,00356 6,7
475 507 91,16

121,91

0,00356 8,3
500 532 91,16

104,68

0,00356 8,7
525 557 118,51

117,72

0,00434 11,8
550 582 118,51

102,51

0,00434 12,4
575 607 118,51

89,81

0,00434 12,9
600 637 118,51

79,13

0,00434 13,5
700 748 302,82

127,75

0,00648 24,0
750 798 302,82

104,01

0,00648 25,7
800 848 302,82

85,80

0,00648 27,4
850 898 302,82

71,61

0,00648 29,1
900 948 486,26

93,28

0,00792 42,4
975 1023 486,26

73,67

0,00792 45,9
1000 1048 486,26

68,37

0,00792 47,0

Presentación
Oportunidades ambientales del sistema yRIB LCO ®
+Color amarillo.
+Longitud de elementos: 6.00 m (se puede hacer en longitudes especificadas por el cliente, desde 1.00 m hasta 13.00 m con
incremento en múltiplos de 0.50 m ).
+Diámetros desde 6” (160 mm) hasta 100” (2500 mm), con incrementos de 1” (25 mm ).
+El uso del sistema RIB LC® y RIB STEL® permite cuidar el ambiente teniendo en cuenta que el material es reciclable
y bajo condiciones controladas en DURMAN es posible fabricar nuevamente tubería con características ampliamente
satisfactorias contribuyendo con la minimización de aspectos ambientales generados por nuestra actividad sin afectar la
calidad que nos caracteriza en el mercado.
O E
RIB STELE®
SERIE PS 10: DURMAN IND. COL PVC 12454 3 4764 PS 10 psi PVC ALCANTARILLADO RESOLUCIÓN 1166
PERFIL XX AMARILLO LOTE XX DD-MM-AAAA.
LOTE DE FORMADO: DI XX” XX mm LOTE XX.
NUEVA SERIE PS 46: DURMAN IND. COL PVC 12454 3 4764 PS 46 psi PVC ALCANTARILLADO RESOLUCIÓN
1166 PERFIL XX AMARILLO LOTE XX DD-MM-AAAA.
LCO
RIB
LCO
RIB
Rotulado
CALIDAD CERTIFICADA
NTC 4764
36 5
LCO
RIB
®

Tabla de Caudales y Velocidades Según Manning
Pend.
%
D = 2250mm
D = 90
D = 2300mm
D = 90
D = 2350mm
D = 94
D = 2400mm
D = 96
D = 2450mm
D = 98
D = 2500mm
D = 100
V(m/s) Q(l/s) V(m/s) Q(l/s) V(m/s) Q(l/s) V(m/s) Q(l/s) V(m/s) Q(l/s) V(m/s) Q(l/s)
6.00% - - - - - - - - - - - -
5.50% - - - - - - - - - - - -
5.00% - - - - - - - - - - - -
4.50% - - - - - - - - - - - -
4.00% - - - - - - - - - - - -
3.50% - - - - - - - - - - - -
3.00% - - - - - - - - - - - -
2.90% - - - - - - - - - - - -
2.80%

-

-

- - - - - - - - - -
2.70%

-

-

-

-

-

-

-

-

-

- - -
2.60%

-

-

-

-

-

-

-

-

-

- - -
2.50%

-

-

-

-

-

-

-

-

-

- - -
2.40%

-

-

-

-

-

-

-

-

-

- - -
2.30%

-

-

-

-

-

-

-

-

-

- - -
2.20%

-

-

-

-

-

-

-

-

-

- - -
2.10%

-

-

-

-

-

-

-

-

-

- - -
2.00%

-

-

-

-

-

-

-

-

-

- - -
1.90%

-

-

-

-

-

-

-

-

-

- - -
1.80%

-

-

-

-

-

-

-

-

-

- - -
1.70%

9.93

39,291

-

-

-

-

-

-

-

- - -
1.60%

9.63

38,118

9.77

40,418

9.91

42,804

-

-

-

- - -
1.50%

9.32

36,907

9.46

39,135

9.60

41,445

9.73

43,838

9.87

46,31610.0048,880
1.40%

9.01

35,656

9.14

37,808

9.27

40,040

9.40

42,352

9.53

44,7469.6647,223
1.30%

8.68

34,359

8.81

36,433

8.93

38,583

9.06

40,811

9.19

43,1189,3145,505
1.20%

8.34

33,011

8.46

35,003

8.58

37,070

8.71

39,210

8,83

41,4278.9543,720
1.10%

7.98

31,605

8.10

33,513

8.22

35,491

8.33

37,541

8.45

39,6638.5641,858
1.00%

7.61

30,135

7.72

31,954

7.84

33,840

7.95

35,794

8.06

37,8178.1739,910
0.90%

7.22

28,588

7.33

30,314

7.43

32,103

7.54

33,957

7.64

35,8767.7537,862
0.80%

6.81

26,953

6.91

28,580

7.01

30,267

7.11

32,015

7.21

33,8257.3035,697
0.70%

6.37

25,212

6.46

26,734

6.56

28,312

6.65

29,947

6.74

31,6406.8333,391
0.60%

5.90

23,342

5.98

24,751

6.07

26,212

6.16

27,726

6.24

29,2936.3330,914
0.50%

5.38

21,308

5.46

22,595

5.54

23,928

5.62

25,310

5.70

26,7415.7728,221
0.40%

4.81

19,059

4.89

20,209

4,96

21,402

5.03

22,638

5.10

23,9185.1625,242
0.30%

4.17

16,505

4.23

17,502

4.29

18,535

4.35

19,605

4.41

20,7134.4721,860
0.20%

3.40

13,477

3.45

14,290

3.50

15,134

3.55

16,008

3.60

16,9123.6517,848
0.10%

2.41

9,529

2.44

10,105

2.48

10,701

2.51

11,319

2.55

11,9592.5812,621
0.09%

2.28

9,040

2.32

9,586

2.35

10,152

2.38

10,738

2.42

11,3452.4511,973
0.08%

2.15

8,523

2.18

9,038

2.22

9,571

2.25

10,124

2.28

10,6962.3111,288
0.07%

2.01

7,973

2.04

8,454

2.07

8,953

2.10

9,470

2.13

10,0052.1610,559
0.06%

1.86

7,381

1.89

7,827

1.92

8,289

1.95

8,768

1.97

9,263 2.009,776
0.05%

1.70

6,738

1.73

7,145

1.75

7,567

1.78

8,004

1.80

8,456 1.838,924
0.04%

1.52

6,027

1.54

6,391

1.57

6,768

1.59

7,159

1,61

7,563 1.637,982
0.03%

1.32

5,219

1.34

5,535

1,36

5,861

1,38

6,200

1,40

6,550 1.416,913
0.02%

1.08

4,262

1.09

4,519

1.11

4,786

1,12

5,062

1,14

5,348 1.155,644
0.01%

0.76

3,013

0.77

3,195

0.78

3,384

0,79

3,579

0,81

3,782 0.823,991
0.0095%

0.74

2,937

0.75

3,114

0.76

3,298

0,77

3,489

0,79

3,686 0.803,890
0.0090%

0.72

2,859

0.73

3,031

0.74

3,210

0,75

3,396

0.76

3,588 0.773,786
0.0085%

0.70

2,778

0.71

2,946

0.72

3,120

0,73

3,300

0.74

3,487 0.753,680
0.0080%.

0.68

2,695

0.69

2,858

0.70

3,027

0,71

3,202

0.72

3,382 0.733,570
0.0075%

0.66

2,610

0.67

2,767

0.68

2,931

0.69

3,100

0.70

3,275 0.713,456
0.0070%

0.64

2,521

0.65

2,673

0.66

2,831

0.66

2,995

0.67

3,164 0.683,339
0.0065%

0.61

2,430

0.62

2,576

0.63

2,728

0.64

2,886

0,65

3,049 0.663,218
0.0060%

0.59

2,334

0.60

2,475

0.61

2,621

0.62

2,773

0,62

2,929 0.633,091
0.0055%

0.56

2,235

0.57

2,370

0.58

2,510

0.59

2,655

0,60

2,805 0.612,960
0.0050%

0.54

2,131

0.55

2,259

0.55

2,393

0,53

2,531

0,58

2,674 0.582,822
0.0045%

0.51

2,021

0.52

2,144

0.53

2,270

0.53

2,401

0.54

2,537 0.552,677
0.0040%

0.48

1,906

0.49

2,021

0.50

2,140

0.50

2,264

0.51

2,392 0.522,524
0.0035%

0.45

1,783

0.46

1,890

0.46

2,002

0.47

2,118

0.48

2,237 0.482,361
0.0030%

-

-

-

-

-

-

-

-

-

- 0,452,186

CALIDAD CERTIFICADA
NTC 4764
Especificaciones técnicas de la tubería yRIB LCO ®
Diámetros Reales Internos :
Desde 160 mm hasta 2500 mm, incrementando cada 25 mm.

Rigidez :

Rugosidad :
Coeficiente de Rugosidad, Manning n=0.009

Velocidad Mínima : 0.45 m/s
Velocidad Máxima : 10.0 m/s
Unión :
Duración :
Sistema hermético de soldadura química
RIB STELE®



Diametros internos Rendimiento cemento-solvente y limpiadorRIB LCO ®

6 35
LCO
RIB
®
TABLA 1
Tabla de Caudales y Velocidades Según Manning
SERIE PS 10: valores superiores a 10 psi cumpliendo con la norma
NTC (ASTM F 794, DIN 16961 1 y 2)
NUEVA SERIE PS 46: valores superiores a 46 psi cumpliendo con
la norma NTC 4764 (ASTM F 794, DIN 16961 1 y 2)
50 años bajo una condición normal de uso y mantenimiento.
DIÁMETRO NOMINAL
LIMPIADOR
mm Pulgadas
1/8 gal 1/64 gal1/4 gal 12 oz 1/4 gal
CEMENTO SOLVENTE
NÚMERO DE UNIONES POSIBLES
160
200
225
250
275
300
325
350
375
400
425
450
475
500
525
550
575
6
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
14
11
7
9
6
5
5
4
4
4
3
3
3
3
3
3
2
28
22
14
18
12
11
10
9
8
8
7
7
6
6
6
6
5
2
2
1
1
1
1
0
0
0
0
0
0
0
0
0
0
0
15
12
8
9
6
6
5
5
4
4
4
4
3
3
3
3
3
41
32
21
26
17
16
15
14
13
12
11
10
10
9
9
8
8
Tubería serie PS 46, DI 1800 mm doble refuerzo.
Pend.
%

D = 1900mm
D = 76

D = 1950mm
D = 78

D = 2000mm
D = 80

D = 2050mm
D = 82

D = 2100mm
D = 84

D = 2150mm
D = 86
D = 2200mm
D = 88

V(m/s)

Q(l/s)

V(m/s)

Q(l/s)

V(m/s)

Q(l/s)

V(m/s)

Q(l/s)

V(m/s)

Q(l/s)

V(m/s)

Q(l/s)V(m/s)Q(l/s)
6.00%

-

-

-

-

-

-

-

-

-

-

-

- - -
5.50%

-

-

-

-

-

-

-

-

-

-

-

- - -
5.00%

-

-

-

-

-

-

-

-

-

-

-

- - -
4.50%

-

-

-

-

-

-

-

-

-

-

-

- - -
4.00%

-

-

-

-

-

-

-

-

-

-

-

- - -
3.50%

-

-

-

-

-

-

-

-

-

-

-

- - -
3.00%

-

-

-

-

-

-

-

-

-

-

-

- - -
2.90%

-

-

-

-

-

-

-

-

-

-

-

- - -
2.80%

-

-

-

-

-

-

-

-

-

-

-

- - -
2.70%

-

-

-

-

-

-

-

-

-

-

-

- - -
2.60%

-

-

-

-

-

-

-

-

-

-

-

- - -
2.50%

-

-

-

-

-

-

-

-

-

-

-

- - -
2.40%

-

-

-

-

-

-

-

-

-

-

-

- - -
2.30%

-

-

-

-

-

-

-

-

-

-

-

- - -
2.20%

-

-

2.10%

9.86

27,820

-

-

-

-

-

-

-

-

-

- - -
2.00%

9.62

27,150

9.79

29,097

9.95

31,130

-

-

-

-

-

- - -
1.90%

9.37

26,463

9.54

28,361

9,70

30.341

9,86

32,407

-

-

-

- - -
1.80%

9.12

25,757

9.28

27,604

9,44

29.532

9,60

31,542

9,75

33,636

9.91

35,814 - -
1.70%

8.87

25.031

9.02

26,826

9.18

28,700

9.33

30.654

9.48

32,688

9.63

34,8059.7837,005
1.60%

8,60

24,284

8.75

26,025

8,90

27.843

9.05

29,738

9.20

31,712

9.34

33.7669.4935,900
1.50%

8.33

23,513

8.47

25,199

8.62

26.959

8.76

28,794

8.90

30,705

9.04

32,6939.1834,760
1.40%

8.05

22,715

8.19

24,345

8.33

26,045

8.47

27,818

8.60

29,664

8,74

31,5858.8733,582
1.30%

7.75

21,889

7.89

23,459

8.02

25.098

8.16

26,806

8.29

28,585

8,42

30.4368.5532,360
1.20%

7.45

21,030

7.58

22,539

7.71

24.113

7.84

25,754

7.96

27,463

8,09

29.2428.2131,091
1.10%

7.13

20,135

7.26

21.579

7.38

23.086

7,50

24,658

7.62

26,294

7.75

27.9977.8729,767
1.00%

6.80

19,198

6.92

20,575

7.04

22.012

7,15

23,510

7,27

25,075

7,39

26,6947.5028,382
0.90%

6.45

18,213

6.56

19.519

6.68

20,882

6.79

22,304

6.90

23,784

7.01

25,3247,1126.925
0.80%

6.08

17,171

6.19

18.403

6.29

19,688

6,40

21,028

6.50

22,424

6.61

23,8766,7125.385
0.70%

5.69

16.062

5.79

17.214

5.89

18.417

599

19,670

6.08

20.976

6.18

22,3346.2723,746
0.60%

5.27

14,871

5.36

15.937

5.45

17,050

5.54

18,211

5.63

19,420

5.72

20,6775.8121,984
0.50%

4.81

13,575

4,89

14.549

4,98

15,565

5,06

16,624

5.14

17,728

5.22

18,8765.3020,069
0.40%

4.30

12,142

4.38

13.013

4.45

13,922

4.52

14,869

4.60

15,856

4.67

16,8834,7417,950
0.30%

3.73

10,515

3.79

11.269

3.85

12,056

3.92

12,877

3.98

13,732

4.04

14,6214.1115,545
0.20%

3.04

8,586

3.09

9.201

3.15

9,844

3,20

10,514

3.25

11,212

3.30

11,9383.3512,693
0.10%

2.15

6,071

2.19

6,506

2.23

6,961

2.26

7,435

2,30

7,928

2.34

8,4412.378,975
0.09%

2.04

5,759

2.08

6,172

2.11

6,604

2.15

7,053

2.18

7,521

2.22

8,0082.258,515
0.08%

1.92

5,430

1.96

5,819

1.99

6,226

2.02

6,650

2.06

7,091

2.09

7,5502.128,028
0.07%

1.80

5,079

1.83

5,444

1.86

5,824

1.89

6,220

1.92

6,633

1.95

7,0631.987,509
0.06%

1.67

4,703

1.69

5,040

1.72

5,392

1.75

5,759

1.78

6,141

1.81

6,5391.846,952
0.05%

1.52

4,293

1.55

4,601

1.57

4,922

1.60

5,257

1.63

5,606

1.65

5,9691.686,346
0.04%

1.36

3,840

1.38

4,115

1.41

4,402

1.43

4,702

1.45

5,014

1.48

5,3391.505,676
0.03%

1.18

3,325

1.20

3,564

1.22

3,813

1.24

4,072

1.26

4,342

1.28

4,6241.304,916
0.02%

0.96

2,715

0.98

2,910

1,00

3.113

1,01

3,325

1.03

3,546

1.04

3,7751.064,014
0.01%

0.68

1,920

0.69

2,057

0,70

2.201

0.72

2,351

0.73

2,507

0.74

2,6690.752,838
0.0095%

0.66

1,871

0.67

2,005

0.69

2,145

0.70

2,291

0.71

2,444

0.72

2,6020.732,766
0.009%

0.65

1,821

0.66

1,952

0.67

2,088

0.68

2,230

0.69

2,378

0.70

2,5320.712,693
0.0085%0.631,7700.641,8970.652,0290.662,1680.672,3110.682,4610.692,617
0.008% 0.611,7170.621,8400.631,9690.642,1030.652,2420.662,3880.672,539
0.0075%0.591,6630.601,7820.611,9060.622,0360.632,1710.642,3120.652,458
0.007% 0.571,6060.581,7210.591,8420,601,9670.612,0980.622,2330.632,375
0.0065%0.551,5480.561,6590.571,7750.581,8950.592,0210.602,1520.602,288
0.006% 0.531,4870.541,5940.551,7050.551,8210.561,9420.572,0680.582,198
0.0055%0.501,4240.511,5260.521,6320.531,7440.541,8590.551,9800.562,105
0.005% 0.481,3580.491,4550.501,5560.511,6620.511,7730.521,8880.532,007
0.0045%0.461,2880.461,3800.471,4770.481,5770.491,6820.501,7910.501,904
0.004% - - - - 0.451,3920.451,4870.461,5860.471,6880.471,795
0.0035% - - - - - - - - - - - - - -
0.003% - - - - - - - - - - - - - -

CALIDAD CERTIFICADA
NTC 4764
Diámetros internos Rendimiento cemento-solvente y limpiadorRIB STELE ®
TABLA 2
34 7
LCO
RIB
®
Tabla de Caudales y Velocidades Según Manning
DIÁMETRO NOMINAL
LIMPIADOR
mm Pulgadas
1/8 gal 1/64 gal1/4 gal 12 oz 1/4 gal
CEMENTO SOLVENTE
NÚMERO DE UNIONES POSIBLES
500
525
550
575
600
625
650
675
700
725
750
775
800
825
850
875
900
925
950
975
1000
1025
1050
1075
1100
1125
1150
1175
1200
1225
1250
1275
1300
1325
1350
1375
1400
1425
1450
1475
1500
1525
1550
1575
1600
1625
1650
1675
1700
1725
1750
1775
1800
1825
1850
1875
1900
1925
1950
1975
2000
2025
2050
2075
2100
2125
2150
2175
2200
2225
2250
2275
2300
2325
2350
2375
2400
2425
2450
2475
2500
3
3
3
2
1
1
1
1
1
1
1
1
1
1
1
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
6
6
6
5
2
2
2
2
2
2
2
2
2
2
2
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
3
3
3
3
2
2
2
2
2
2
2
2
2
2
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
9
9
8
8
7
7
6
6
6
6
5
5
5
5
5
5
4
4
4
4
4
4
4
4
4
3
3
3
3
3
3
3
3
3
3
3
3
3
3
3
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
1
1
1
1
1
1
1
1
1
1
1
1
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
37
38
39
40
41
42
43
44
45
46
47
48
49
50
51
52
53
54
55
56
57
58
59
60
61
62
63
64
65
66
67
68
69
70
71
72
73
74
75
76
77
78
79
80
81
82
83
84
85
86
87
88
89
90
91
92
93
94
95
96
97
98
99
100
Pend.
%
D = 1550mm
D = 62
D = 1600mm
D = 64

D = 1650mm
D = 66

D = 1700mm
D = 68

D = 1750mm
D = 70

D = 1800mm
D = 72

D = 1850mm
D = 74

V(m/s) Q(l/s) V(m/s)

Q(l/s)

V(m/s)

Q(l/s)

V(m/s)

Q(l/s)

V(m/s)

Q(l/s)

V(m/s)

Q(l/s)

V(m/s)

Q(l/s)

6.00% - - -

-

-

-

-

-

-

-

-

-

-

-
5.50% - - -

-

-

-

-

-

-

-

-

-

-

-
5.00% - - -

-

-

-

-

-

-

-

-

-

-

-

4.50% - - -

-

-

-

-

-

-

-

-

-

-

-

4.00% - -

-

-

-

-

-

-

-

-

-

-

-

3.50% - - -

-

-

-

-

-

-

-

-

-

-

-

3.00% - - -

-

-

-

-

-

-

-

-

-

-

-

2.90% - - -

-

-

-

-

-

-

-

-

-

-

-

2.80% 9.9418,666

-

-

-

-

-

-

-

-

-

-

-

-

2.70% 9.7618,329

9.97

19,949

-

-

-

-

-

-

-

-

-

-

2.60% 9.5717,987

9.78

19,576

9.98

21,250

-

-

-

-

-

-

-

-

2.50% 9.3917,637

9.59

19,196

9.79

20,837

9,98

22,564

-

-

-

-

-

-

2.40% 9.2017,281

9.40

18,808

9.59

20,416

9.78

22,108

9.97

23,885

-

-

-

-

2.30% 9.0016,917

9.20

18,412

9.39

19,986

9.58

21,642

9.76

23,382

9.95

25,206

-

-

2.20% 8.8116,545

9.00

18,007

9.18

19,547

9.37

21,167

9.55

22,868

9.73

24,652

9.91

26,520

2.10% 8.6016,165

8.79

17,593

8.97

19,098

9.15

20,680

9.33

22,342

9.51

24,085

9.68

25,911

2.00% 8.4015,775

8.58

17,169

8.75

18,637

8.93

20,182

9.10

21,804

9.28

23,505

9.45

25,286

1.90% 8.1815,376

8.36

16,734

8.53

18,165

8.70

19,671

8.87

21,252

9.04

22,910

9.21

24,646

1.80% 7.9714,966

8.14

16,288

8.31

17,681

8.47

19,146

8.64

20,685

8.80

22,298

8.96

23,989

1.70% 7.7414,544

7.91

15,829

8.07

17,183

8.23

18,607

8.39

20,102

8.55

21,670

8.71

23,313

1.60% 7.5114,110

7.67

15,356

7.83

16,670

7.99

18,051

8.14

19,502

8.30

21,023

8.45

22,617

1.50% 7.2713,662

7.43

14,869

7.58

16,140

7.73

17,478

7.88

18,882

8.03

20,356

8.18

21,899

1.40% 7.0313,199

7.18

14,365

7.32

15,593

7.47

16,885

7.62

18,242

7.76

19,665

7.91

21,156

1.30% 6.7712,718

6.91

13,842

7.06

15,026

7.20

16,271

7.34

17,579

7.48

18,950

7.62

20,386

1.20% 6.5012,220

6.64

13,299

6.78

14,436

6.92

15,633

7.05

16,889

7.19

18,207

7.32

19,587

1.10% 6.2311,699

6.36

12,733

6.49

13,822

6.62

14,967

6.75

16,170

6.88

17,432

7.01

18,753

1.00% 5.9411,155

6.06

12,140

6.19

13,179

6.31

14,271

6.44

15,417

6.56

16,620

6.68

17,880

0.90% 5.6310,582

5.75

11,517

5.87

12,502

5.99

13,538

6.11

14,626

6.22

15,767

6.34

16,963

0.80% 5.319,977

5.42

10,859

5.54

11,787

5.65

12,764

5.76

13,790

5.87

14,866

5.98

15,992

0.70% 4.979,333

5.07

10,157

5.18

11,026

5.28

11,940

5.39

12,899

5.49

13,906

5.59

14,960

0.60% 4.608,641

4.70

9,404

4.80

10,208

4.89

11,054

4.99

11,942

5.08

12,874

5.18

13,850

0.50% 4.207,888

4.29

8,585

4.38

9,319

4.47

10,091

4.55

10,902

4.64

11,752

4.72

12,643

0.40% 3.767,055

3.84

7,678

3.92

8,335

3.99

9,026

4.07

9,751

4.15

10,512

4.23

11,308

0.30% 3.256,110

3.32

6,650

3.39

7,218

3.46

7,816

3.53

8,445

3.59

9,103

3.66

9,793

0.20% 2.664,989

2.71

5,429

2.77

5,894

2.82

6,382

2.88

6,895

2.93

7,433

2.99

7,996

0.10% 1.883,527

1.92

3,839

1.96

4,167

2.00

4,513

2.04

4,875

2.07

5,256

2.11

5,654

0.09% 1.783,346

1.82

3,642

1.86

3,954

1.89

4,281

1.93

4,625

1.97

4,986

2.00

5,364

0.08% 1.683,155

1.72

3,434

1.75

3,727

1.79

4,036

1.82

4,361

1.86

4,701

1.89

5,057

0.07% 1.572,951

1.60

3,212

1.64

3,487

1.67

3,776

1.70

4,079

1.74

4,397

1.77

4,731

0.06% 1.452,732

1.49

2,974

1.52

3,228

1.55

3,496

1.58

3,777

1.61

4,071

1.64

4,380

0.05% 1.332,494

1.36

2,715

1.38

2,947

1.41

3,191

1.44

3,447

1.47

3,716

1.49

3,998

0.04% 1.192,231

1.21

2,428

1.24

2,636

1.26

2,854

1.29

3,084

1.31

3,324

1.34

3,576

0.03% 1.031,932

1.05

2,103

1.07

2,283

1.09

2,472

1.12

2,670

1.14

2,879

1.16

3,097

0.02% 0.841,578

0.86

1,717

0.88

1,864

0.89

2,018

0.91

2,180

0.93

2,350

0.94

2,529

0.01% 0.591,115

0.61

1,214

0.62

1,318

0.63

1,427

0.64

1,542

0.66

1,662

0.67

1,788

0.0095%0.581,087

0.59

1,183

0.60

1,284

0.62

1,391

0.63

1,503

0.64

1,620

0.65

1,743

0.0090%0.561,058

0.58

1,152

0.59

1,250

0.60

1,354

0.61

1,463

0.62

1,577

0.63

1,696

0.0085%0.551,0280.561,1190.571,2150.581,3160.591,4210.601,5320.621,648
0.0080%0.53 998 0.541,0860.551,1790.561,2760.581,3790.591,4870.601,599
0.0075%0.51 966 0.531,0510.541,1410.551,2360.561,3350.571,4390.581,548
0.0070%0.50 933 0.511,0160.521,1030.531,1940.541,2900.551,3910.561,496
0.0065%0.48 899 0.49 979 0.501,0620.511,1510.521,2430.531,3400.541,442
0.0060%0.46 864 0.47 940 0.481,0210.491,1050.501,1940.511,2870.521,385
0.0055% - - 0.45 900 0.46 977 0.471,0580.481,1430.491,2330.501,326
0.0050% - - - - - - 0.451,0090.461,0900.461,1750.471,264
0.0045% - - - - - - - - - - - - 0.451,199
0.0040% - - - - - - - - - - - - - -
0.0035% - - - - - - - - - - - - - -
0.0030% - - - - - - - - - - - - - -

CALIDAD CERTIFICADA
NTC 4764
Accesorios de PVC y
Cargue de tubería
RIB LCO ®
RIB LCO ®

La tecnología RIB LCpermite la fabricación de una amplia variedad de accesorios
ensamblados, los cuales se fabrican a partir de la tubería cumpliendo con todos los
requisitos exigidos como parte del sistema de Alcantarillado, con el correspondiente
apoyo a la norma DIN de donde nace el producto.
Esta tecnología permite suministrar accesorios RIB LC®y RIB STEL® en los
diámetros que el cliente requiera tales como:
Codos en ángulos de 11.25º, 22.5º, 45º y 90º.
Derivaciones Tee y Tee reducidas a 90°.
Derivaciones Yee y Yee reducidas a 45°.
Derivaciones en otros ángulos de 10°, 30°, 60° ó cualquier otro requerido.
Tapones.
Sillas de derivación de 45º y 90º. (Para RIB LC® y RIB STEL®, para conexión de
tubería RIB LC® o Sanitaria).
Para conducciones en grandes diámetros se pueden hacer cambios de dirección en
secciones secantes que dan la apariencia y el comportamiento de una curva de
radio amplio.
O
O E
O E
O
®

Ù
Ù
Ù
Ù
Ù
Ù
1. 2.Inicie el cargue de la tubería colocándola
uniformemente sobre la plataforma del vehículo
hasta completar la primera fila. Determine el
espacio libre entre la pared del tubo y la
carrocería. Coloque estructuras de madera.
Dichas estructuras o separadores deben tener el
área suficiente para evitar punzonamiento en la
pared de la tubería o el rompimiento de las tees.
Como mínimo serán colocadas en tres zonas,
ubicados a 1m, 3m y 5m medidos desde el espigo
del tubo sujetándolos o anclándolos a la
carrocería para evitar el movimiento o el
ovalamiento de los tubos durante el transporte.
Continué colocando otra fila de tubería de tal forma
que se logre mantener cada tubo completamente
apoyado sobre la corona del tubo inferior.
RIB STELE®
8 33
LCO
RIB
®
Tabla de Caudales y Velocidades Según Manning
Pend.
%

D = 1200mm
D = 48

D = 1250mm
D = 50

D = 1300mm
D = 52

D = 1350mm
D = 54

D = 1400mm
D = 56

D = 1450mm
D = 58
D = 1500mm
D = 60

V(m/s)

Q(l/s)

V(m/s)

Q(l/s)

V(m/s)

Q(l/s)

V(m/s)

Q(l/s)

V(m/s)

Q(l/s)

V(m/s)

Q(l/s) V(m/s) Q(l/s)
6.00%

-

-

-

-

-

-

-

-

-

-

-

- - -
5.50%

-

-

-

-

-

-

-

-

-

-

-

- - -
5.00%

-

-

-

-

-

-

-

-

-

-

-

- - -
4.50%

-

-

-

-

-

-

-

-

-

-

-

- - -
4.00%

-

-

-

-

-

-

-

-

-

-

-

- - -
3.50%

9.37

10,546

9.62

11,759

9.88

13,056

-

-

-

-

-

- - -
3.00%

8.67

9,764

8.91

10,887

9.15

12,087

9.38

13,367

9,61

14,728

984

16,173 - -
2.90%

8.53

9,600

8.76

10,704

8.99

11,884

9.22

13,142

9.45

14,481

9.67

15,9019,8917,406
2.80%

8.38

9,433

8.61

10,518

8.84

11,677

9.06

12,914

9.28

14,229

9.50

15,6249.7217,103
2.70%

8.23

9,263

8.45

10,328

8.68

11,467

8,90

12,681

9.12

13,972

9.33

15,3439.5516,795
2.60%

8.07

9,090

8.30

10,135

8.51

11,252

8.73

12,444

8.95

13,711

9.16

15,0569.3716,481
2.50%

7.92

8,913

8.13

9,938

8.35

11,034

8.56

12,202

8.77

13,445

8.98

14,7649.1916,161
2.40%

7.76

8,733

7.97

9,737

8.18

10,811

8.39

11,956

8.60

13,173

8.80

14,4659.0015,834
2.30%

7.59

8,549

7.80

9,532

8.01

10,583

8.21

11,704

8.41

12,896

8.61

14,1618.8115,501
2.20%

7.43

8,361

7.63

9,323

7.83

10,351

8.03

11,447

8.23

12,612

8.42

13,8508.6215,160
2.10%

7.25

8,169

7.45

9,109

7.65

10,113

7.85

11,184

8.04

12,322

8.23

13,5318.4214,811
2.00%

7.08

7,972

7.28

8,889

7.47

9,869

7.66

10,914

7,85

12,025

8.03

13,2058.2214,455
1.90%

6.90

7,770

7.09

86,641

7.28

9,619

7.46

10,638

7.65

11,721

7.83

12,8718.0114,089
1.80%

6.72

7,563

6.90

8,433

7.08

9,363

7.27

10,354

7.44

11,408

7.62

12,5277.7913,713
1.70%

6.53

7,350

6.71

8,195

6.89

9,099

7.06

10,062

7.23

11,087

7.41

12,1757.5713,326
1.60%

6.33

7,131

6.51

7,951

6.68

8,827

6.85

9,762

7.02

10,756

7,18

11,8117.3512,929
1.50%

6.13

6,904

6,30

7,698

6.47

8,547

6.63

9,452

6.80

10,414

6.96

11,4367.1112,518
1.40%

5.92

6,670

6.09

7,437

6.25

8,257

6.41

9,131

6.56

10,061

6.72

11,0486.8712,094
1.30%

5.71

6,427

5.87

7,167

6.02

7,957

6.17

8,799

6.33

9,695

6.48

10,6466.6211,654
1.20%

5.48

6,175

5.64

6,885

5.78

7,645

5.93

8,454

6.08

9,315

6.22

10,2296.3611,196
1.10%

5.25

5,912

5.40

6,592

5.54

7,319

5.68

8,094

5.82

8,918

5.96

9,7936.0910,720
1.00%

5.01

5,637

5.14

6,285

5.28

6,778

5.42

7,717

5.55

8,503

5.68

9,3375.8110,221
0.90%

4.75

5,348

4.88

5,963

5.01

6,620

5.14

7,321

5.26

8,067

5.39

8,8585.519,696
0.80%

4.48

5,042

4.60

5,622

4.72

6,242

4.84

6,903

4.96

7,606

5.08

8,3525.209,142
0.70%

4.19

4,716

4.30

5,259

4.42

5,839

4.53

6,457

4.64

7,114

4.75

7,8124.868,551
0.60%

3.88

4,367

3.98

4,869

4.09

5,406

4.19

5,978

4.30

6,587

4.40

7,2334.507,917
0.50%

3.54

3,986

3.64

4,445

3.73

4,935

3.83

5,457

3.92

6,013

4.02

6,6034.117,227
0.40%

3.17

3,565

3.25

3,975

3,34

4,414

3.42

4,881

3.51

5,378

3.59

5,9063.676,464
0.30%

2.74

3,088

2.82

3,443

2.89

3,822

2.97

4,227

3.04

4,657

3.11

5,1143.185,598
0.20%

2.24

2,521

2.30

2,811

2.36

3,121

2.42

3,451

2.48

3,803

2.54

4,1762.604,571
0.10%

1.58

1,783

1.63

1,988

1.67

2,207

1.71

2,440

1.75

2,689

1.80

2,9531.843,232
0.09%

1.50

1,691

1.54

1,886

1.58

2,094

1.62

2,315

1.66

2,551

1.70

2,8011.743,066
0.08%

1.42

1,594

1.46

1,778

1.49

1,974

1.53

2,183

1.57

2,405

1.61

2,6411.642,891
0.07%

1.32

1,491

1.36

1,663

1.40

1,846

1.43

2,042

1.47

2,250

1.50

2,4701.542,704
0.06%

1.23

1,381

1.26

1,540

1.29

1,709

1.33

1,890

1.36

2,083

1.39

2,2871,422,504
0.05%

1.12

1,261

1.15

1,405

1.18

1,560

1.21

1,726

1.24

1,901

1.27

2,0881.302,285
0.04%

1.00

1,127

1.03

1,257

1.06

1,396

1.08

1,543

1.11

1,701

1.14

1,8671.162,044
0.03%

0.87

976

0.89

1,089

0.91

1,209

0.94

1,337

0.96

1,473

0.98

1,6171.011,770
0.02%

0.71

797

0.73

889

0.75

987

0.77

1,091

0.78

1,203

0.80

1,3210.821,445
0.01%

0.50

564

0.51

629

0.53

698

0.54

772

0.55

850

0.57

934 0.581,022
0.0095%

0.49

549

0.50

613

0.51

680

0.53

752

0.54

829

0.55

910 0.57 996
0.0090%

0.47

535

0.49

596

0.50

662

0.51

732

0.53

807

0.54

886 0.55 970
0.0085%0.46 520 0.47 579 0.49 643 0.50712 0.51 784 0.52 861 0.54 942
0.0080%0.45 504 0.46 562 0.47 624 0.48690 0.50 761 0.51 835 0.52 914
0.0075% -1 0.45 544 0.46 604 0.47668 0.48 736 0.49 809 0.50 885
0.0070% - - - - - 0.45646 0.46 711 0.48 781 0.49 855
0.0065% - - - - - - 0,45 686 0,46 753 0.47 824
0.0060% - - - - - - - 0.45 792
0.0055% - - - - - - - - - - - - - -
0.0050% - - - - - - - - - - - - - -
0.0045% - - - - - - - - - - - - -
0.0040% - - - - - - - - - - - - -
0.0035% - - - - - - - - - - - - -
0.0030% - - - - - - - - - - - - -

CALIDAD CERTIFICADA
NTC 4764
1. 2.Instale sobre la plataforma repisas de acuerdo al
diámetro. Como mínimo coloque 4 repisas por tubo
distribuidas uniformemente.
Traslade la tubería hasta la plataforma del
vehículo.
Cargue de tubería RIB STELE®
32 9
LCO
RIB
®
Tabla de Caudales y Velocidades Según Manning Cargue de tuberíaRIB LCO ®
3. 4. Después de colocar cada fila de tuberías por
diámetro, utilice 3 talanqueras (repisas)
distribuidas aproximadamente a 1.5 metros a
partir del extremo de los tubos y apóyelos
uniformemente sobre la carrocería del
vehículo. Continué ubicando filas adicionales
como se presenta:
Continúe el procedimiento utilizando una
horqueta para ubicar correctamente los tubos
en el nivel superior, evitando roce entre ellos
hasta completar el espacio del vehículo sin
permitir su ovalamiento.
Diámetro Número de filas
160 mm 4 Filas
3 Filas
2 Filas
200 mm - 275 mm
300 mm - 575 mm
TABLA 3
Pend.
%

D = 850mm
D = 34

D = 900mm
D = 36

D = 950mm
D = 38

D = 1000mm
D = 40

D = 1050mm
D = 42

D = 1100mm
D = 44

D = 1150mm
D = 46

V(m/s)

Q(l/s)

V(m/s)

Q(l/s)

V(m/s)

Q(l/s)

V(m/s)

Q(l/s)

V(m/s)

Q(l/s)

V(m/s)

Q(l/s)V(m/s) Q(l/s)
6.00%

9.74

5,505

-

-

-

-

-

-

-

-

-

-

- -
5.50%

9.33

5,271

9.69

6,139

-

-

-

-

-

-

-

-

- -
5.00%

8.90

5,026

9.24

5,853

9.58

6.761

9.91

7,752

-

-

-

-

- -
4.50%

8.44

4,768

8.77

5,553

9.09

6,414

9.40

7,354

9.72

8,376

-

-

- -
4.00%

7.96

4,495

8.27

5,235

8.57

6.047

8.87

6,933

9.16

7,897

9.45

8,9409.7310,065
3.50%

7.44

4,205

7.73

4,897

8.02

5.656

8.29

6,486

8.57

7,387

8.84

8,3629.109,415
3.00%

6.89

3,893

7.16

4,534

7.42

5,237

7.68

6,004

7.93

6,839

8.18

7,7428.438,716
2.90%

6.77

3,827

7.04

4,458

7.30

5,149

7.55

5,904

7.80

6,724

8.04

7,6128.298,570
2.80%

6.66

3,761

6.92

4,380

7.17

5,059

7.42

5,801

7.66

6,607

7.91

7,4798.148,421
2.70%

6.54

3,693

6.79

4,301

7.04

4,968

7.28

5,696

7.53

6,488

7.76

7,3458.008,269
2.60%

6.41

3,624

6.66

4,221

6.91

4,875

7.15

5,590

7.38

6,367

7.62

7,2077.858,114
2.50%

6.29

3,554

6.53

4,139

6.77

4,781

7.01

5,481

7.24

6,243

7.47

7,0677.697,957
2.40%

6.16

3,482

6.40

4,055

6.64

4,684

6.87

5,371

7.10

6,117

7.32

6,9257.547,796
2.30%

6.03

3,408

6.27

3,970

6.50

4,585

6.72

5,257

6.95

5,988

7.16

6,7797.387,632
2.20%

5.90

3,334

6.13

3,882

6.35

4,485

6.58

5,142

6.79

5,856

7.01

6,6307.227,464
2.10%-

5.76

3,257

5.99

3,793

6.21

4,381

6.42

5,024

6.64

5,722

6.85

6,4777.057,293
2.00%

5.63

3,178

5.84

3,702

6.06

4,276

6.27

4,903

6.48

5,584

6.68

6,3216.887,117
1.90%

5.48

3,098

5.70

3,608

5.91

4,168

6.11

4,778

6.31

5,442

6.51

6,1616.716,937
1.80%

5.34

3,015

5.54

3,512

5.75

4,056

5.95

4,651

6.14

5,297

6.34

5,9976.536,752
1.70%

5.19

2,930

5.39

3,413

5.59

3,942

5.78

4,520

5.97

5,148

6.16

5,8286.346,561
1.60%

5.03

2,843

5.23

3,311

5.42

3,824

5.61

4,385

5.79

4,994

5.98

5,6546.166,366
1.50%

4.87

2,753

5.06

3,206

5.25

3,703

5.43

4,246

5.61

4,836

5.79

5,4745.966,163
1.40%

4.71

2,659

4.89

3,097

5.07

3,577

5.25

4,102

5.42

4,672

5.59

5,2895.765,954
1.30%

4.54

2,563

4.71

2,984

4.88

3,447

5.05

3,953

5.22

4,502

5.39

5,0965.555,738
1.20%

4.36

2,462

4.53

2,867

4.69

3,312

4.86

3,798

5.02

4,325

5.18

4,8965.335,513
1.10%

4.17

2,357

4.33

2,745

4.49

3,171

4.65

3,636

4.80

4,141

4.95

4,6885.105,278
1.00%

3.98

2,247

4.13

2,618

4.28

3,023

4.43

3,467

4.58

3,948

4.72

4,4704.875,032
0.90%

3.77

2.132

3.95

2,483

4.06

2,868

4.21

3,289

4.34

3,746

4.48

4,2404.624,774
0.80%

3.56

2,010

3.70

2,341

3.83

2,704

3.97

3,101

4.10

3,532

4.23

3,9984.354,501
0.70%

3.33

1,880

3.46

2,190

3.58

2,530

3.71

2,900

3.83

3,303

3.95

3,7404.074,210
0.60%

3.08

1,741

3.20

2,028

3.32

2,342

3.43

2,685

3.55

3,058

3.66

3,4623.773,898
0.50%

2.81

1,589

2.92

1,851

3.03

2,138

3.13

2,451

3.24

2,792

3.34

3,1613.443,558
0.40%

2.52

1,421

2.61

1,655

2.71

1,912

2.80

2,193

2.90

2,497

2.99

2,8273.083,183
0.30%

2.18

1,231

2.26

1,434

2.35

1,656

2.43

1,899

2.51

2,163

2.59

2,4482.672,756
0.20%

1.78

1,005

1.85

1,171

1.92

1,352

1.98

1,550

2.05

1,766

2.11

1,9992.182,251
0.10%

1.26

711

1.31

828

1.35

956

1.40

1,096

1.45

1,249

1.49

1,4131.541,591
0.09%

1.19

674

1.24

785

1.29

907

1.33

1,040

1.37

1,185

1.42

1,3411.461,510
0.08%

1.13

636

1.17

740

1.21

855

1.25

981

1.30

1,117

1.34

1,2641.381,423
0.07%

1.05

595

1.09

693

1.13

800

1.17

917

1.21

1,045

1.25

1,1831.291,331
0.06%

0.97

551

1.01

641

1.05

741

1.09

849

1.12

967

1.16

1,0951.191,233
0.05%

0.89

503

0.92

585

0.96

676

0.99

775

1.02

883

1.06

999 1.091,125
0.04%

0,80

450

0.83

524

0.86

605

0.89

693

0.92

790

0.94

894 0.971,006
0.03%

0.69

389

0.72

453

0.74

524

0.77

600

0.79

684

0.82

774 0.84 872
0.02%

0.56

318

0.58

370

0.61

428

0.63

490

0.65

558

0.67

632 0.69 712
0.01%

-

-

-

-

-

-

-

-

0.46

395

0.47

447 0.49 503
0.01%

-

-

-

-

-

-

-

-

0.45

385

0.46

436 0.47 491
0.01%

-

-

-

-

-

-

-

-

-

-

0.45

424 0.46 477
0.01%

-

-

-

-

-

-

-

-

-

-

-

-

0.45 464
0.01%

-

-

-

-

-

-

-

-

-

-

-

-

- -
0.01% - - - - - - - - - - - - - -
0.01% - - - - - - - - - - - - - -
0.01% - - - - - - - - - - - - - -
0.01% - - - - - - - - - - - - - -
0.01% - - - - - - - - - - - - - -
0.01% - - - - - - - - - - - - - -
0.00% - - - - - - - - - - - - - -
0.00% - - - - - - - - - - - - - -
0.00% - - - - - - - - - - - - - -
0.00% - - - - - - - - - - - - - -

7. 8.Asegure la tubería a la plataforma por medio de
correas anchas de lona por el contorno del
Rectifique la tensión de todos las correas.
CALIDAD CERTIFICADA
NTC 4764






10 31
LCO
RIB
®
Tabla de Caudales y Velocidades Según Manning
3.
5.
4.
6.
Levante el tubo y colóquelo en la plataforma del
vehículo sobre las talanqueras (repisas)
instaladas previamente.
En caso de requerir una fila adicional, instale la
repisa de separación correspondiente.
Rectifique la ubicación de las repisas donde el
taco solo esté en contacto con la pared de
PVC.
Cargue las filas superiores utilizando el equipo
adecuado.
Cargue de tubería RIB STELE®
Pend.

%

D = 500mm

D = 550mm

D = 600mm

D = 650mm

D = 700mm

D = 750mm D = 800mm

V(m/s)

Q(l/s)

V(m/s)

Q(l/s)

V(m/s)

Q(l/s)

V(m/s)

Q(l/s)

V(m/s)

Q(l/s)

V(m/s)

Q(l/s)V(m/s) Q(l/s)
12.50%

9.87

1.930.28

12.00%

9.67

1891.28

11.50% 9.47 1.851.46
11.00% 9.26 1.810.76 9.87 2,335
10.50%
9.05
1.769.13
9.64
2,281
10.00%

8.83

1.726.50

9.41

2.226

9.97

2,807

9.50%

8.61

1.682.78

9.17

2,170

9.72

2.736

9.00%

8.38

1.637.90

8.93

2.112

9.46

2.663

9.98

3.297
8.50%

8.14

1.591.75

8.68

2,052

9,19

2,588

9.70

3,204
8.00%

7,90

1.544.22

8.42

1,991

8,92

2,511

9.41

3,109

9.89

3.788

7.50%

7,65

1.495.19

8,15

1.928

8.64

2.431

9.11

3,010

9.57

3.668

7.00%

7,39

1.444.49

7,87

1,862

8,34

2.349

8,80

2.908

9.25

3.543

9.68

4.259
6.50%

7,12

1.391.95

7,59

1,795

8,04

2263

8,48

2.802

8.91

3.414

9.33

4.1029.744.875
6.00%

6,84

1.337.34

7,29

1,724

7,73

2.175

8.15

2.692

8.56

3,280

8.96

3,9439.364,683
5.50%

6,55

1.280.40

6,98

1,651

7,40

2.082

7,80

2.577

8.20

3,141

8.58

3,7758.964,484
5.00%

6,24

1.220.82

6,65

1,574

7,05

1.985

7.44

2.458

7.82

2,995

8.18

3,5998.544,275
4.50%

5,92

1.158.17

6,31

1,493

6,69

1,883

7,06

2.331

7.41

2,841

7.76

3,4158.104,056
4.00%

5,59

1.091.93

5,95

1.408

6,31

1,776

6,65

2.198

6.99

2,678

7.32

3,2197.643,824
3.50%

5.22

1.021.41

5.57

1.317

5,90

1,661

6,22

2.056

6.85

2,505

6.85

3,0117.153,577
3.00%

4.84

945.64

5.15

1.219

5,46

1.538

5.76

1,904

6.05

2,320

6.34

2,7886.623,312
2.90%

4.76

929.75

5,07

1,199

5.37

1,512

5.67

1,872

5.95

2,281

6.23

2,7416.513,256
2.80%

4,67

913,58

4,98

1.178

5,28

1.486

5.57

1,839

5.85

2,241

6.12

2,6946.393,199
2.70%

4,.59

897.11

4.89

1.157

5,18

1.459

5.47

1,806

5.74

2,201

6.01

2,6456.283,142
2.60%

4.50

880.34

4,80

1.135

5,09

1.432

5.36

1,772

5.64

2,159

5.90

2,5966.163,083
2.50%

4.42

863.25

4,71

1,113

4,99

1.404

5.26

1,738

5,53

2,117

5.79

2,5456.043,023
2.40%

4.33

845.81

4,61

1,091

4,89

1.375

5.15

1,703

5,41

2,075

5.67

2,4945.922,962
2.30%

4.24

828.00

4,51

1,068

4,78

1.346

5.05

1,667

5,30

2,031

5.55

2,4415.792,900
2.20%

4.14

809,80

4.41

1,044

4,68

1.317

4.93

1,630

5,18

1,986

5.43

2,3885.672,836
2.10%

4.05

7.91.18

4.31

1,020

4,57

1.287

4.82

1,593

5,06

1,941

5.30

2,3335.542,771
2.00%

3.95

772.11

4.21

996

4,46

1.256

4,70

1,554

4.94

1,894

5.18

2,2765.402,704
1.90%

3.85

7.52.56

4,10

970

4,35

1.224

4.59

1,515

4.82

1,846

5.04

2,2195.272,635
1.80%

3.75

732.49

3.99

944

4.23

1,191

4,46

1.475

4.69

1,797

4.91

2,1605.132,565
1.70%

3.64

711.85

3.88

918

4.11

1,158

4,34

1.433

4.56

1,746

4.77

2,0994.982,493
1.60%

3.53

690.60

3.76

890

3.99

1,123

4,21

1,390

4.42

1,694

4.63

2,0364.832,419
1.50%

3.42

668.67

3.64

862

3.86

1,087

4,07

1,346

4.28

1,640

4.48

1,9714.682,342
1.40%

3.30

646.00

3.52

833

3.73

1,050

3,94

1,300

4.14

1,585

4.33

1,9054.522,262
1.30%

3.18

622.50

3.39

803

3.60

1,012

3,79

1,253

3.99

1,527

4.17

1,8354.362,180
1.20%

3.06

598.08

3.26

771

3.45

973

3,64

1.204

3.83

1,467

4.01

1,7634.192,094
1.10%

2.93

572.61

3.12

738

3.31

931

3,49

1.153

3.67

1,405

3.84

1,6884.012,005
1.00%

2.79

545.97

2.98

704

3.15

888

3,33

1.099

3.5

1,339

3.66

1,6103.821,912
0.90%

2.65

517.95

2.82

668

2.99

842

3,16

1.043

3.32

1,270

3.47

1,5273.621,814
0.80%

2.50

488.33

2.66

630

2.82

794

2.98

983

3.13

1,198

3.27

1,4403.421,710
0.70%

2.34

456.79

2.49

589

2.64

743

2.78

920

2.92

1,120

3.06

1,3473.201,600
0.60%

2.16

422.90

2.31

545

2.44

688

2.58

851

2.71

1,037

2.83

1,2472.961,481
0.50%

1.97

386.06

2.10

498

2.23

628

2.35

777

2.47

947

2.59

1,1382.701,352
0.40%

1.77

345.30

1.88

445

1.99

561

2.10

695

2.21

847

2.31

1,0182.421,209
0.30%

1.53

299.04

1.63

386

1.73

486

1.82

602

1.91

734

2.00

882 2.091,047
0.20%

1.25

244.16

1.33

315

1.41

397

1.49

492

1.56

599

1.64

720 1.71855
0.10%

0.88

172.65

0.94

223

1.00

281

1.05

348

1.11

423

1.16

509 1.21605
0.09%

0.84

163.79

0.89

211

0.95

266

1.00

330

1.05

402

1.10

483 1.15574
0.08%

0.79

154.42

0.84

199

0.89

251

0.94

311

0.99

379

1.04

455 1.08541
0.07% 0.74144.450.79186 0.83235 0.88291 0.92354 0.97426 1.01506
0.06% 0.68133.730.73172 0.77217 0.81269 0.86328 0.90394 0.94468
0.05% 0.62122.080.67157 0.71199 0.74246 0.78299 0.82360 0.85428
0.04% 0.56109.190.60141 0.63178 0.67220 0.70268 0.73322 0.76382
0.03% 0.4894.560.52122 0.55154 0.58190 0.61232 0.63279 0.66331
0.02% - - - - 0.45126 0.47155 0.49189 0.52228 0.54270
0.01% - - - - - - - - - - - - - -
0.01% - - - - - - - - - - - - - -

CALIDAD CERTIFICADA
NTC 4764

Descargue de tubería
Desmonte la carrocería de uno de los lados. Ubique los planchones en el costado del camión.1. 2.
RIB STELE®




30 11
LCO
RIB
®
Hato Corozal, Emisario Final
Tabla de Caudales y Velocidades Según Manning Descargue de tuberíaRIB LCO ®

1. 2.Utilice una herramienta que le permita direccionar
la tubería en su descargue evitando fricción.
Ubíquese en la plataforma del vehículo para
continuar descargando, manteniendo las
precauciones necesarias protegiendo
3. 4.Solicite ayuda para la recepción del producto
fuera del vehículo evitando golpearlo en toda
su longitud.
Almacene la tubería en un lugar limpio y con
superficie lisa.
+Aliste el equipo o herramientas necesarias como cuerdas y planchones con el personal suficiente para el descargue de la
tubería.
Pend.

%
D = 160mm

D = 200mm

D = 250mm

D = 300mm

D = 350mm

D = 400mm

D = 450mm

V(m/s)

Q(l/s)

V(m/s)

Q(l/s)

V(m/s)

Q(l/s)

V(m/s)

Q(l/s)

V(m/s)

Q(l/s)

V(m/s)

Q(l/s)

V(m/s) Q(l/s)
6.00%

3.20

64.07

3.71

116.16

4.31

210.62

4.87

356.47

5.39

516.62

5.90

737.59

6.381,010
5.50% 3.06 61.34 3.56 111.22 4.13 201.65 4.66 342.49 5.16 494.62 5.64 706.19
6.11966.78
5.00% 2.92 58.49 3.39 106.04 3.93 192.27 4.44 327.91 4.92 471.61 5.38 673.32 5.82921.79
4.50% 2.77 55.48 3.22 100.60 3.73 182.40 4.21 312.65 4.67 447.40 5.11 638.77 5.52874.48
4.00%

2.61

52.31

3.03

94.85

3.52

171.97

3.97

296.60

4.40

421.82

4.81

602.24

5.21824.47
3.50%

2.44

48.93

2.84

88.72

3.29

160.86

3.72

279.64

4.12

394.57

4.50

563.34

4.87771.22
3.00%

2.26

45.30

2.63

82.14

3.05

148.93

3.44

261.58

3.81

365.30

4.17

521.55

4.51714.01
2.90%

2.23

44.54

2.58

80.76

3.00

146.43

3.38

242.18

3.75

359.16

4.10

512.79

4.43702.01
2.80%

2.19

43.77

2.54

79.35

2.94

143.88

3.32

238.10

3.68

352.92

4.03

503.87

4.36689.80
2.70%

2.15

42.98

2.49

77.92

2.89

141.29

3.26

233.96

3.62

346.56

3.95

494.79

4.28677.37
2.60%

2.11

42.17

2.44

76.47

2.84

138.65

3.20

229.75

3.55

340.08

3.88

485.54

4.20664.71
2.50%

2.07

41.36

2.40

74.98

2.78

135.95

3.14

225.45

3.48

333.48

3.81

476.11

4.12651.80
2.40%

2.02

40.52

2.35

73.47

2.73

133.21

3.08

221.07

3.41

326.74

3.73

466.49

4.03638.63
2.30%

1.98

39.67

2.30

71.92

2.67

130.40

3.01

216.61

3.34

319.86

3.65

456.67

3.95625.19
2.20%

1.94

38.80

2.25

70.34

2.61

127.54

2.95

212.05

3.27

312.83

3.57

446.63

3.86611.44
2.10%

1.89

37.90

2,20

68.72

2,55

124.60

2.88

207.39

3.19

305.64

3.49

436.36

3.77597.39
2.00%

1.85

36.99

2.14

67.07

2.49

121.60

2.81

202.62

3.11

298.27

3.40

425.85

3.68582.99
1.90%

1.80

36.05

2.09

65.37

2.43

118.52

2.74

197.74

3.03

290.72

3.32

415.06

3.59568.23
1.80%

1.75

35.09

2.03

63.63

2.36

115.36

2.67

192.73

2.95

282.96

3.23

403.99

3.49553.07
1.70%

1.70

34.10

1.98

61.83

2.29

112.11

2.59

187.59

2.87

274.99

3.14

392.61

3.39537.49
1.60%

1.65

33.08

1.92

59.99

2.23

108.76

2.51

182.30

2.79

266.78

3.04

380.89

3.29521.44
1.50%

1.60

32.03

1.86

58.08

2.15

105.31

2.43

176.86

2.70

258.31

2.95

368.79

3.19504.88
1.40%

1.55

30.95

1.79

56.11

2.08

101.74

2.35

171.24

2.61

249.55

2.85

356.29

3.08487.76
1.30%

1.49

29.82

1.73

54.07

2.01

98.04

2.27

165.44

2.51

240.47

2.74

343.33

2.97470.02
1.20%

1.43

28.65

1.66

51.95

1.93

94.19

2.18

159.42

2.41

231.04

2.64

329.86

2.85451.58
1.10%

1.37

27.43

1.59

49.74

1.85

90.18

2.08

153.16

2.31

221.20

2.52

315.82

2.73432.36
1.00%

1.31

26.16

1.52

47.42

1.76

85.98

1.99

146.64

2.20

210.91

2.41

301.12

2.60412.24
0.90%

1.24

24.81

1.44

44.99

1.67

81.57

1.88

139.82

2.09

200.09

2.28

285.67

2.47391.08
0.80%

1.17

23.39

1.36

42.42

1.57

76.91

1.78

132.64

1.97

188.64

2.15

269.33

2.33368.71
0.70%

1.09

21.88

1.27

39.68

1.47

71.94

1.66

125.06

1.84

176.46

2.01

251.93

2.18334.9
0.60%

1.01

20.26

1.17

36.73

1.36

66.60

1.54

116.98

1.71

163.37

2

233.25

2.02319.32
0.50%

0.92

18.49

1.07

33.53

1.24

60.80

1.40

108.30

1.56

149.13

1.70

212.92

1.84291.49
0.40%

0.83

16.54

0.96

29.99

1.11

54.38

1,26

98.87

1.39

133.39

1.52

190.44

1.65260.72
0.30%

0.72

14,33

0.83

25.97

0.96

47.10

1,09

88.43

1.21

115.52

1.32

164.93

1.43225.79
0.20%

0.58

11.70

0.68

21.21

0.79

38.45

0.89

76.58

1

94.32

1.08

134.66

1.16184.36
0.10%

-

-

0.48

15.00

0.56

27.19

0.63

62.53

0.70

66.70

0.76

95.22

0.82130.36
0.09%

-

-

0.45

14.23

0.53

25.80

0.60

44.21

0.66

63.27

0.72

90.34

0.78123.67
0.08%

-

-

-

-

0.50

24.32

0.56

41.95

0.62

59.65

0.68

85.17

0.74116.60
0.07%

-

-

-

-

0.47

22.75

0.53

39.55

0.58

55.80

1

79.67

0.69109.07
0.06%

-

-

-

-

-

-

0.49

36.99

0.54

51.66

591

73.76

0.64100.98
0.05%

-

-

-

-

-

-

-

34.25

0.49

47.16

0.54

67.33

0.5892.18
0.04%

-

-

-

-

-

-

-

-

-

-

0.48

60.22

0.5282.45
0.03%

-

-

-

-

-

-

-

-

-

-

-

-

0.4571.40
0.02%

-

-

-

-

-

-

-

-

-

-

-

-

- -
0.01%

-

-

-

-

-

-

-

-

-

-

-

-

- -
0.01%

-

-

-

-

-

-

-

-

-

-

-

-

- -
0.01%

-

-

-

-

-

-

-

-

-

-

-

-

- -
0.01%

-

-

-

-

-

-

-

-

-

-

-

-

- -
0.01% - - - - - - - - - - - - - -
0.01% - - - - - - - - - - - - - -
0.01% - - - - - - - - - - - - - -
0.01% - - - - - - - - - - - - - -
0.01% - - - - - - - - - - - - - -
0.01% - - - - - - - - - - - - - -
0.01% - - - - - - - - - - - - - -
0.00% - - - - - - - - - - - - - -
0.00% - - - - - - - - - - - - - -

CALIDAD CERTIFICADA
NTC 4764
Almacenamiento de la tuberíaRIB LCO ®
ÿ
ÿ
ÿ
ÿ
Verificar que el terreno sea uniforme, libre de piedras, troncos u
objetos similares.
Los tubos deben quedar apoyados en toda su extensión.
Se debe coordinar el plan de abastecimiento con base en la
programación y rendimientos reales en obra, para así evitar
almacenar tubería expuesta a la intemperie por espacio
superior a 3 días. Caso contrario se debe acondicionar un sitio
para proteger la tubería de la acción de los rayos ultravioleta (luz
del sol), condición que aplica para cualquier marca y tipo de
tubería y accesorios de PVC.
Almacene según el diámetro de la tubería, tal como se indica a
continuación.
DIÁMETRO DE LA TUBERÍA
(mm)
NÚMERO DE FILAS A
ALMACENAR
160 - 325 4
350 - 525
550 - 900
> = 925
3
2
1
El adecuado trato y el seguimiento que a la tubería se le dé es clave
para una deseable minimización del desperdicio.
TABLA 4





12 29
LCO
RIB
®
Tabla de Caudales y Velocidades Según Manning


Amarre las cuerdas de uno de los extremos del planchón,
abrazando el tubo con el objeto de controlar su descenso.
Suelte la cuerda lentamente controlando el descenso del tubo.3. 4.
Descargue de tuberíaRIB STELE®
Pend.
%
V(m/s) Q(l/s) V(m/s) Q(l/s) V(m/s) Q(l/s) V(m/s) Q(l/s) V(m/s) Q(l/s) V(m/s) Q(l/s) V(m/s) Q(l/s)
35.00%7.73154.748.97280.56 - - - - - - - - - -
34.50%7.67153.638.91278.55 - - - - - - - - - -
34.00%7.62152.518.84276.52 - - - - - - - - - -
33.50%7.56151.398.78274.48 - - - - - - - - - -
33.00%7.51150.258.71272.43 - - - - - - - - - -
32.50%7.45149.118.64270.35 - - - - - - - - - -
32.00%7.39147.968.58268.279.95486.40 - - - - - - - -
31.50%7.33146.808.51266.169.87482.59 - - - - - - - -
31.00%7.27145.638.44264.049.80478.74 - - - - - - - -
30.50%7.22144.458.37261.909.72474.86 - - - - - - - -
30.00%7.16143.268.30259.759.64470.95 - - - - - - - -
29.50%7.10142.068.23257.579.56467.01 - - - - - - - -
29.00%7.04140.858.16255.389.47463.04 - - - - - - - -
28.50%6.98139.638.09253.179.39459.03 - - - - - - - -
28.00%6.91138.408.02250.949.31454.99 - - - - - - - -
27.50%6.85137.167.95248.699.23450.91 - - - - - - - -
27.00%6.79135.917.88246.429.14446.79 - - - - - - - -
26.50%6.73134.647.81244.139.06442.63 - - - - - - - -
26.00%6.66133.377.73241.818.97438.44 - - - - - - - -
25.50%6.60132.087.66239.488.88434,2 - - - - - - - -
25.00%6.53130.787.58237.128.80429.929.95 - - - - - - -
24.50%6.47129,467.50234.738.71425.609.83699.10 - - - - - -
24.00%6.40128.147.43232.338.62421.239.73692.07 - - - - - -
23.50%6.33126.797.35229.898.53416.829.63684.97 - - - - - -
23.00%6.27125.447.27227.438.44412.379.53677.80 - - - - - -
22.50%6.20124.077.19224.958.35407.869.42670.55 - - - - - -
22.00%6.13122.687.11222.448.25403.309.32663.22 - - - - - -
21.50%6.06121.287.03219.898.16398.699.21655.81 - - - - - -
21.00%5.99119,866.95217.328.06394.039.10648.32 - - - - - -
20.50%5.92118.426.86214.727.97389.319.00640.739.97954.93 - - - -
20.00%5.84116.976.78212.087.87384.538.89633.069.85943.21 - - - -
19.50%5.77115.506.70209.427.77379.708.77625.299.72931.35 - - - -
19.00%5.70114.016.61206.717.67374.808.66617.439.60919.33 - - - -
18.50%5.62112.506.52203.987.57369.838.55609.469.47907.15 - - - -
18.00%5.54110.976.43201.207.46364.808.43601.399.34894.81 - - - -
17.50%5.47109.426.34198.397.36359.708.31593.219.21882.29 - - - -
17.00%5.39107.846.25195.537.25354.528.19584.919.08869.609.921,242 - -
16.50%5.31106.246.16192.637.15349.278.07576.498.94856.719.781,223 - -
16.00%5.23104.626.06189.697.04343.947.95567.958.81843.639.631,204 - -
15.50%5.14102,975.97186.716.93338.527.82559.288.67830.359.481,186 - -
15.00%5.06101.305.87183.676.81333.027.69550.478.53816.849.321,166 - -
14.50%4.9899.605.77180.586.70327.427.57541.528.38803.119.161,1479.911.569.75
14.00%4.8997.875.67177.446.58321.727.43532.428.24789.159.011,1279.741.542.44
13.50%4.8096.105.57174.246.46315.937.30523.168.09774.938.841,1069.571.514.65
13.00%4.7194.315.47170.996.34310.027.16513.737.94760.448.681,0869.391.486.34
12.50%4.6292.475.36167.676.22304.007.02504.137.78745.678.511,0659.201.457.47
12.00%4.5390.615.25164.286.09297.866.88494.347.63730.618.341,0439.021.428.03
11.50%4.4388.705.14160.825.97291.596.74484.357.47715.228.161,0218.831.397.96
11.00%4.3386.755.03157.295.84285.186.59474.157.30699.507.98998.708.631.367.23
10.50%4.2384.754.91153.675.70278.626.44463.737.13683.427.80975.748.441.335.8
10.00%4.1382.714.79149.975.56271.916.28453.076.96666.957.61952.228.231.303.6
9.50% 4.0380.624.67146.175.42265.026.12442.156.79650.067.42928.118.021.270.6
9.00% 3.9278.474.55142.275.28257.955.96430.956.61632.727.22903.367.811.236.71
8.50% 3.8176.264.42138.265.13250.685.79419.466.42614.907.02877.917.591.201.86
8.00% 3.7073.984.29134.134.98243.205.62407.646.23596.546.81851.697.361.165.98
7.50% 3.5871.634.15129.874.82235.485.44395.476.03577.606.59824.657.131.128.95
7.00% 3.4669.204.01125.474.65227.495.26382.915.83558.016.37796.696.891.090.67
6.50% 3.3366,683,87120,914.49219.225.07369,935,61337.716.14767.716.641.051.00
D = 160mm D = 200mm D = 250mm D = 300mm D = 350mm D = 400mm D = 450mm

CALIDAD CERTIFICADA
NTC 4764
Instalación de la tubería yRIB LCO ®
El óptimo comportamiento de las tuberías flexibles incluye respetar ciertos anchos de zanja mínimos. A continuación se
presenta un cuadro resumen de las dimensiones de la zanja para cada uno de los diámetros de acuerdo con nuestra
experiencia en el análisis de los resultados de diferentes instalaciones, así como también los modelos de distribución de cargas
y esfuerzos en los que se basa la tecnología de tuberías flexibles instalados en condiciones de zanja.
RIB STELE ®
El objetivo está en lograr las mismas condiciones y grados
de compactación en todo el contorno de la tubería. Estos
valores pueden cambiar, disminuir o aumentar, de acuerdo
con el criterio del diseñador (previo estudio de suelos), en
circunstancias donde se utilizan técnicas especiales de
construcción o donde los suelos naturales son sustituidos.
En condiciones críticas tales como: profundidad y suelos de
muy mala calidad, el ancho de la zanja (lc) se incrementará
según las condiciones del sitio, hasta un máximo de dos
veces el diámetro externo de la tubería. Anchos mayores no
retribuyen beneficios adicionales en la respuesta
estructural de la tubería.
Es necesario aumentar el relleno sobre la corona del tubo
(lo) cuando las cargas vivas están aplicadas a muy poca
profundidad o muy cerca del relleno mínimo.
*
**
***
Di
(mm) I
b I
c ** I
o ***
>150 300 100 150 150
>300 450 100 200 150
>450 900 150 300 150
>900 1500 150 350 200
>1500 2000 150 0.25xDe 300
VALORES
RECOMENDADOS * (mm)
=
=
=
=
=
TABLA 5
E2= Módulo de rigidez material de préstamo
E3= Módulo de rigidez de los materiales de la
pared de la excavación.
Esquema de cargas y presiones
Prisma de distribución
de cargas vivas
Resultante de cargas
aplicadas
Carga por el peso
del terreno menos el
efecto de arco
Efecto del empuje pasivo
del terreno y su efecto de
equilibrio
Efecto del empuje de las paredes
de la zanja (menor que el material
de entorno)
Presión hacia arriba en el
fondo de zanja
28 13
LCO
RIB
®
Comportamiento Hidráulico
Donde
Condiciones de Flujo Máximo
Ecuación I
Ecuación II
Ecuación III
Debido a que y se fabrica a partir
del PVC, ofrece la gran ventaja de poseer un bajo
coeficiente de rugosidad, permitiendo así un
comportamiento más económico en las instalaciones.
Los coeficientes recomendados para RIB LC y
®
, según el Estándar Australiano AS2200-1978
®
“Design Chartsfor Water Supply and Sewerage" son:
D = diámetro interno (m)
Q = caudal máximo (metro cúbico por segundo
3
m/s)
Manning: n = 0.009
n = coeficiente de rugosidad ”n” de Manning
Nosotros recomendamos para Hazen
S = pendiente de conducción (m/m)
Williams C = 150
V = velocidad del agua en el tubo (m/s)
Colebrook - White: k =0.0015mm
La velocidad máxima de flujo para las tuberías RIB LC
®
y es de 10 m/s.
®
Velocidad mínima para alcantarillados sanitarios = 0,45
m/s y para alcantarillados pluviales = 0,75 m/s
En ductos circulares el máximo caudal se logra cuando el
calado es de 93.8%, es decir, el tubo no va lleno. Los
diferentes problemas de Flujo en Tuberías a canal abierto
para condiciones de Flujo máximo, se pueden resumir
en:
!Conocido el caudal de diseño, la pendiente y el factor
de rugosidad, calcular el diámetro.
!Conocidos el diámetro, la pendiente y el factor de
rugosidad, calcular la velocidad.
!Conocidos el diámetro, la pendiente y el factor de
rugosidad, calcular el caudal máximo.
En alcantarillado pluvial, sin embargo, es más frecuente
considerar el tubo lleno (esto trae mayor seguridad).
Los tablas continuas se pueden utilizar para obtener el
caudal y la velocidad del agua, conocida la pendiente y el
diámetro del tubo RIB LC y
® ®
RIB LC
® ®O
O
O
O
RIB STEL,

RIB
STEL
RIB STEL
RIB STEL
E
E
E
E
8
3
1/2
1.548 ÷
ø
ö
ç
è
æ
=
S
nQ
D
÷
÷
ø
ö
ç
ç
è
æ
=
n
SD
V
1/22/3
0.399
÷
÷
ø
ö
ç
ç
è
æ
=
n
SD
Q
1/28/3
0.312
Peso Peso
mm plg kg/mlmm plg kg/ml
250 10 78,4 250 10 2,6
300 12 97,6 275 11 4,3
350 14 115,2 350 14 6,1
400 16 149,6 375 15 6,6
450 18 200,8 400 16 6,7
500 20 260,0 450 18 8,8
600 24 392,0 550 22 10,7
700 27 508,0 625 25 15,9
800 30 636,0 700 28 27,5
900 36 792,0 800 32 33,0
1000 40 996,0 900 36 33,4
1100 44 1.116,0 1000 40 39,4
1200 48 1.312,0 1050 42 41,3
1300 52 1.456,0 1150 46 44,6
1400 56 1.556,0 1250 50 48,4
1500 60 1.784,0 1350 54 53,6
1600 64 2.032,0 1400 56 56,1
1700 68 2.300,0 1500 60 61,9
1800 72 2.576,0 1600 64101,3
2000 80 3.184,0 1750 70110,6
2150 86 3.580,0 1900 76119,9
2300 92 4.000,0 2000 80126,1
COMPORTAMIENTO HIDRAULICO COMPARATIVO
Tubería en CONCRETOEquivalencia en RIB LOC®,
Diámetro Diámetro
TABLA 10
TABLA 11
Diseño Hidráulico y

RIB LCO ® RIB STELE®

Elaboración de la zanja
Al excavar una zanja, primero se verifica el trazado según planos,
la pendiente longitudinal y el ancho requerido. Se recomienda
iniciar desde el descole, lo que significa que la dirección del
proceso de excavación irá en contra flujo, de aguas abajo hacia
aguas arriba.
Se debe usar tablestacados, entibación, apuntalamiento o
pantallas en la zanja por seguridad buscando proteger al
personal de derrumbes, u otras condiciones inestables del suelo
y como prevención para evitar daños en cimentaciones de
edificios vecinos, vías o alteraciones que puedan afectar el
ambiente.
Al presentarse agua en la excavación de la zanja será necesario
drenarla para mantener la estabilidad del sitio. Cuando se
excava se debe controlar el nivel freático, asegurándose que se
mantenga por debajo del fondo de la excavación para prevenir la
salida de material entre el tablestacado o el apuntalamiento
exponiendo las paredes de la zanja. El agua deberá ser
controlada en la zanja antes y durante la instalación de la
tubería, manteniendo el control durante la instalación del
recubrimiento y la colocación de suficiente relleno previendo la
flotación de la tubería (análisis de boyancia o flotación).
Para prevenir la perdida del soporte natural, los métodos de
drenaje deberán ser usados minimizando el traslado de finos
y la creación de cavernas en el terreno natural. En ocasiones
puede ser necesario usar un geotextil para limitar la
migración de finos.
Los materiales, como la gravilla o triturado, utilizados para la
cimentación de la tubería permiten el drenaje de las aguas
subterraneas.
!Si el nivel de agua es bajo por tener aportaciones pequeñas,
se puede evacuar por medio de bombas sumergibles
situadas en el punto más bajo.
!Si las aportaciones de agua son mayores, además de utilizar
bombas en los puntos bajos, será necesario colocar un
drenaje “francés” en la parte inferior de la solera de la
instalación, conformado por grava con una granulometría
20/40, ayudado con tubería de drenaje para trabajar en
seco. (Analizar si se requiere de Geotextil).
14 27
CALIDAD CERTIFICADA
NTC 4764LCO
RIB
®
Bogotá D.C., Barrio San Carlos Suba
Villavicencio, Plan Maestro de Alcantarillado Sanitario
7 8
9 10
11 12
7.
8.
9.
10.
11.
12.
Aplique uniformemente soldadura en la
zona de la tubería.
Continúe la aplicación de la soldadura en la unión en un
extremo del lado donde se ubica la vena separadora.
Coloque la unión en el tubo llevando a tope los dos
extremos y sujétela en la parte inferior.
Doble la unión en forma de un corazón para introducirla
en su totalidad.
Distribuya los posibles excesos de soldadura en todo el
borde de la unión.
Coloque el parche en la zona donde empalman los dos
extremos de la banda.
RIB LC
®O
Mantenimiento, Procedimiento para el corte del tubo en obra
1.
2.
3.
4.
5.
6.
Determine la longitud de tubería a cortar.
+
Mida la distancia entre cada una de las
Tee´s en forma tangencial al eje en
alguno de los extremos del Tubo.
+
Marque la distancia medida en la zona a
cortar y continúe demarcando la tubería
siempre trasladando la marca a la
siguiente Tee del lado derecho.
+
Comience el corte empleando un
serrucho de diente pequeño, buscado la
siguiente marca.
+
Recorra todo el perímetro del tubo hasta
finalizar el corte, manteniendo la
dirección conformada por las marcas
realizadas.
+
Limpie la rebaba del corte.
21 3
4 5 6

CALIDAD CERTIFICADA
NTC 4764
Cimentación
!Si las aportaciones de agua son muy elevadas se debe analizar la inclusión del
sistema “well-point”, consistente en tuberías perforadas a ambos lados de la zanja
que absorben el agua del terreno bajando el nivel freático en la zona controlando de
no secar demasiado la zona para evitar que construcciones vecinas sufran
hundimientos .
Adicional a lo anterior es importante anotar que cuando el nivel freático es muy alto, la
migración de material fino desde la pared de la zanja al material de atraque puede
ocurrir, causando una reducción en el soporte lateral del tubo.
Para prevenir la migración de finos se puede utilizar un geotextil no tejido punzonado por
agujas o uno monofilamento, este deberá envolver totalmente el material de atraque de
la tubería.
Con respecto a la cimentación, al encontrar suelos muy malos será necesario hacer una
sobre-excavación y reemplazar el material por uno de mayor capacidad portante, o en su
defecto colocar una geomalla Biaxial combina con geotextil no tejido para mejorar la
capacidad portante.
Es importante aclarar que la tubería ,
al igual que todas las tuberías termoplásticas, es una tubería
flexible y su comportamiento depende del material de atraque
y el ancho de la zanja, y en menos proporción del tipo de
cimentación que seutilice. La función primordial de esta es en

realidad la de ofrecer un apoyo firme, continuo y homogéneo
donde se pueda colocar convenientemente la tubería,
retirando cualquier objeto extraño que pueda impedirlo. Así
como permitir distribuir la resultante vertical de las cargas
totales.
La cimentación se debe elaborar colocando una capa continua
de material selecto con un espesor mínimo de 10 cm,
preferiblemente gravilla o triturado. Esto permite absorber
o eliminar las irregularidades que siempre quedan en el
fondo de la zanja al ejecutar su excavación.
RIB LC yRIB STEL
® ®O E
En caso de que se encuentre un material poco consistente en
el fondo de la zanja, se recomienda sustituir por lo menos
20 cm, dependiendo de la magnitud del problema, con
material granular hasta lograr una buena consistencia.
26 15
LCO
RIB
®
El Yopal, Emisario Final
Mantenimiento, Colocación de la Unión en Obra
1
5
2
6
3 4
Funza, Centro Logístico La Cofradía
Funza, Centro Logístico La Cofradía

Granulometría de materiales
La tabla contigua permite tener criterios para
seleccionar los materiales de atraque y relleno
inicial, la decisión de uso o no depende de su
consecución cerca de la obra.
El interés es dar herramientas de criterio más no son
obligatorios.

TABLA 9
Nombre del MaterialTamiz mm Recebo B600 Recebo B400 Grava Triturado
3"75.000
2 ½"63.000
2"50.000 100
1 ¾"45.000 100
1 ½"37.500 100 100 10090 - 100
1 ¼"31.500 90 - 10070 - 95
1"25.000 70 - 100 75 - 9585 - 9050 - 70
¾"19.000 60 - 90 50 - 6535 - 40
½"12.500 30 - 4015 - 25
3
/
8"9.500 40 - 75 40 - 7515 - 30 0 - 5
No 44.750 30 - 60 30 - 60 0 - 5
No 82.360
No 102.000 20 - 50 20 - 45
No 161.180
No 300.600
No 400.425 oct-30 15 - 30
No 500.300
No 1000.150
No 2000.075 may-15 5 - 20
Arena Gruesa
Arena Media
Arena Fina
Grava Gruesa
Grava Fina
La versatilidad del sistema permite utilizar
tubos en longitudes variables según necesidades
disminuyendo los desperdicios de las obras.
Tenga a mano todos los elementos necesarios para
habilitar el nuevo espigo: sección de tubería con corte
perpendicular, perfil unión soldadura ,
limpiador Durman, flexómetro, serrucho, brocha,
escuadra y marcador .

Rectifique el diámetro interno del Tubo.
Determine el perímetro del tubo para calcular la
longitud de la unión multiplicando el diámetro del tubo
por (3.1416).

Corte la unión perpendicularmente en el lugar
marcado.
Limpie la sección de unión con limpiador de PVC.
Limpie la zona del tubo donde se colocará la unión.
RIB LC®
RIB LC®
O
O
1.
2.
3.
4.
5.
6.

Unión de la tubería
La unión que se practica entre los tubos
RIB STELse logra
mediante fusión química utilizando
cemento solvente de PVC lo que
garantiza un sistema hermético, a la vez
que impide la penetración de raíces que
causaría obstrucción en los conductos.
RIB LC®y ®

Las tuberías RIB LC® y RIB
STEL® poseen en uno de sus
extremos una banda de unión
interna, la cual cumple la función de
espigo, en su empalme tiene un
refuerzo rectangular el cual debe
ubicarse en la parte superior del tubo
al instalarse.
O
O
E
E
Por su bajo peso este tipo de tubería puede ser colocada fácilmente sin tener
que hacer uso de medios mecánicos
Para bajar los tubos al fondo de la zanja, si ésta no es muy profunda, y si la
tubería no tiene fleje metálico (diámetros de 475mm o menos), se puede
hacer con solo dos personas, ayudadas con elementos como sogas planas
para facilitar su movilización.
Para diámetros mayores o para tuberías a profundidades de más de 2.50
metros se recomienda el apoyo en la manipulación de una retroexcavadora
liviana.
+
+
+
Usualmente con dos apoyos a los cuartos medios (ver foto) es suficiente
aún para tuberías pesadas de longitud 6.00 m. Para amarrar e izar la
tubería se pueden usar cuerdas planas tejidas (como las de remolque de
autos) o bien cadenas de acero gruesas (eslabones de 6.35 mm o más).
Cuando es un tubo liviano (diámetros de 650 mm o menos) en una zanja de
dos metros de profundidad o menos, puede colocarse una manila o lazo a
cada extremo del tubo para luego bajarlo lentamente hasta el fondo de la
excavación. Por ningún motivo use cadenas de eslabón pequeño ni cables
metálicos para manipular tubería.
Colocación de la tubería yRIB LCO ®

RIB STELE®
16 25
CALIDAD CERTIFICADA
NTC 4764LCO
RIB
®
Villanueva, Barrio El Mirador
Tunja, Colector Jordán
Detalle conexión de pozos de inspección
El espesor de la banda depende del diámetro de tubo (ver tabla 8) y su ancho
es igual al espesor del muro menos 2 cms, de tal manera que permita la
aplicación un material sellante.
La banda será fijada alrededor del tubo, antes de realizar el empotramiento
del mismo, por medio de zunchos o tortones de alambre. Deberá existir un
traslapo mínimo de 10 cm en los extremos de la banda.
Para la zona interna del pozo se conformará un cordón alrededor del
perímetro del tubo con material sellante elástico o poliuretano del tipo
Sikaflex 221 o similar. Esto garantizará estanqueidad en la transición de los 2
materiales, concreto y PVC. Y para la zona externa se conformará un anillo
utilizando una mezcla de cemento puro y Sika 2.
Como segunda opción para suelos blandos se pueden utilizar las transiciones
de elastoliq Durman aplicando el mismo procedimiento de instalación
descrito anteriormente.

En suelos semirrígidos, o donde se garantice la no presencia de
asentamientos diferenciales se hará un contacto directo de la pared
estructural del tubo con la pared de pozo. Y en la zona interna del pozo se
aplicará un cordón de poliuretano alrededor de la punta del tubo luego de
haber pañetado la pared interna del pozo.
Villavicencio, Plan Maestro de Alcantarillado Sanitario
TABLA 8
mm plg
160 a 425 6” a 17” 9 mm
450 a 650 18” a 26” 11 mm
675 a 975 27” a 39” 12 mm
1000 a 2000 40” a 80” 13 mm
2000 a 3000 82” a 120” 14 mm
Espesor de la espuma de
Polietileno
DIAMETRO
SUELOS BLANDOS SUELOS RIGIDOS
Transiciones Elastoliq

24 17
LCO
RIB
®
Conexión de tuberías y a pozos de inspecciónRIB LCO ®RIB STELE®
+
+
+
Antes de realizar la unión, limpie el espigo y la campana con limpiador de PVC, como mecanismo para acondicionar la
superficie. Rectifique la alineación de los tubos.
Introduzca 1 cm el espigo en la campana.
Aplique una capa uniforme de soldadura* para tecnología RIB LC® y RIB STEL® y proceda a empujar la tubería,
conformando así una unión soldada hermética.
*La soldadura está disponible en dos presentaciones: uso normal y para instalaciones sumergidas, para esta última
presentación debe solicitar mayor información con el Departamento de Desarrollo y Soporte Técnico.
O E
! Mayor durabilidad frente a movimientos
! Hermeticidad
! Durabilidad de la unión al ser del mismo material del tubo
! Facilidad en la instalación
! No hay desperdicio en obra
! Menores perdidas hidráulicas por no presentar resalto
! Mayor superficie de contacto para garantizar hermeticidad
! Bajo costo
Ventajas de la Unión
Altura de Relleno Mínimo para el Equipo de Compactación
CALIDAD CERTIFICADA
NTC 4764
Plancha vibratoria
manual e.g. Ingersoll
Rand VX6.
Hr min > 0.15 m
Rodillo vibratorio
manual e.g. Ingersoll
Rand SX-17 (.85 toneladas)
Hr min > 0.40 m
Aplanadora vibratoria
de 3 toneladas ej.
Vibrol 28W o
Vibrol 32R
Hr >0.55 m
Bulldozer convencional
Hr min > 0.60 m
Mototrailla, Rodillo
Pata de cabra, y/o similar.
Hr min > 0.60 m
TABLA 6
Ib
De
Io
Hr
Ic Ic
Fundación
Cimentación
Zona de Atraque
Relleno Inicial
Relleno Final
Pared de la Zanja
L
Zona de Incidencia
del Soporte Lateral
E3
E2
Material T2
Material T2
7.Para alturas de relleno en Hr > 6.25 m
T2= Gravilla o Triturado
La zona de Atraque y relleno inicial deben estar
compuestas por materiales triturados o granulares
con un tamaño entre ¾” y 1 ½”.
Los anteriores gráficos aplican bajo la utilización de la tubería RIB LC para los diámetros desde 160 mm o 6” hasta 575
®
mm o 23”, y RIB STELdesde 500 mm o 20” hasta 2500 mm o 100”.
®
Recomendaciones para el análisis de tuberías superficiales y/o con cargas superiores a las de autopista, diámetros
excluidos en este modelo.
Para estos casos se deben contemplar algunos parámetros específicos:
-Deflexión en el pavimento por la transmisión de las cargas. Si la tubería es de gran diámetro y el recubrimiento es muy
bajo, de acuerdo con los conceptos de la mecánica estructural, la losa de concreto deberá llevar la gran mayoría de las
solicitaciones estructurales, analizando como losa de carga o como viga plana sobre fundación elástica, definiéndose a
partir de allí el espesor y refuerzo de la misma. Esto es especialmente importante para tuberías de 1500 mm en adelante
con recubrimientos de menos de 0.50 m.
-Efecto de concentración de cargas en el tubo. En tuberías superficiales, con diámetros cuya relación en la fórmula
siguiente sea inferior a 1.0, la carga no se distribuye en toda la proyección horizontal, por lo que se deberán tomar
consideraciones en el diseño del pavimento y el material de cobertura.
Relación diámetro a relleno: D / (1.2*H + 0.30)
Para aplicaciones que no se contemplan en este manual, el departamento de desarrollo y soporte técnico está a las órdenes
de quienes así lo requieran.
O
E
Al instalar la tubería se deberá adoptar un sistema que absorba los movimientos diferenciales y esfuerzos que se pueden
generar entre la tubería y la estructura especialmente al construir redes en suelos blandos.
Este sistema consistirá en la instalación de una banda de material elástico o espuma de polietileno de celda cerrada
alrededor del tramo del tubo a empotrar en el cilindro del pozo.
Longitud de empalme 24 cm

18 23
CALIDAD CERTIFICADA
NTC 4764LCO
RIB
®
Ib
De
Io
Hr
Ic Ic
Fundación
Cimentación
Zona de Atraque
Relleno Inicial
Relleno Final
Pared de la Zanja
L
Zona de Incidencia
del Soporte Lateral
E3
E2
Material T3
Material T2
Ib
De
Io
Hr
Ic Ic
Fundación
Cimentación
Zona de Atraque
Relleno Inicial
Relleno Final
Pared de la Zanja
L
C
Zona de Incidencia
del Soporte Lateral
E3
E2
Material T3
Material T2
T2= Gravilla o triturado
T3= Recebo fino
La zona de Atraque debe ser compuesta por materiales triturados o
granulares con un tamaño entre ¾” y 1 ½” y la zona de relleno inicial por
recebo fino compactado, esta zona inicia a partir de ¾ del diámetro.
5. 6.Para alturas de relleno 3.25 m <Hr 4.75 m= Para alturas de relleno 4.75 m <Hr 6.25 m =
T2= Gravilla o triturado
T3= Recebo fino
La zona de Atraque debe estar compuesta por materiales triturados o
granulares con un tamaño entre ¾” y 1 ½” y la zona de relleno inicial por
recebo fino compactado, esta zona inicia a una altura de la mitad del
diámetro.
+
+
+
+
+Se deberá continuar colocando, el relleno, capa por capa, en
espesores y procesos según se explicó anteriormente, para
conformar la zona de relleno inicial con material selecto
alternando de un lado a otro y compactando cada capa de
material.
Cuando el material de excavación no contenga limo orgánico,
material vegetal, desperdicios o escombros podrá utilizarse para
la conformación de la zona de relleno inicial, previamente
extrayendo los materiales con una granulometría superior 1 ¾”.
+
+
+
+El espesor de cada capa depende principalmente del tipo
material selecto y del equipo de densificación con que se cuente.
Esto con el propósito de proporcionar una acomodación
conveniente de sus partículas. Cuando se utilizan materiales
como triturados o gravas gruesas, por ser muy fácil de acomodar
genera un significativo ahorro en equipo mecánico y en mano de
obra, con el consiguiente mejoramiento de los rendimientos.
Paralelamente provee un conveniente drenaje subterráneo.
+
+Para el caso en el cual la instalación no pueda cumplir con los
rellenos mínimos deberá consultarse con el Departamento de
Desarrollo y Soporte Técnico y así llegar a determinar el material
de atraque.
Para la conformación de la zona de atraque preferiblemente se
debe rellenar con materiales del tipo arena limpia bien gradada
(SW), arena limpia mal gradada (SP) gravas bien o mal gradadas
(GW y GP), piedra quebrada o cualquier subproducto de
triturado entre 6 y 40 mm, teniendo en cuenta que el material y la
manera en que se coloquen van a influir directamente en el
comportamiento mecánico del sistema RIB LC® -Suelo
Si se trata de un material cohesivo o arena o mixto, la
densificación va ser manual se deberá conformar capas de 15
cm aproximadamente. Si se emplea un compactador mecánico o
saltarín las capas deben ser de 25 cm a 30 cm. Si se tratará de
un material cohesivo se deben obtener consolidaciones del 95%
del Próctor Modificado. Si se utiliza arena, gravilla de río o si se
colocará piedra triturada se deberá acomodar el material
homogéneamente hasta llegar a los niveles indicados en la Tabla
5, valor tabulado como (lo).
El contenido de finos (porcentaje que pasa por el tamiz #200)
deberá ser inferior al 25%, y el índice de plasticidad del material
que pasa por el tamiz #40 será menor de 10%.
O
Zona de atraque y relleno inicial
El Yopal, Emisario Final
El Yopal, Emisario Final
Ib
De
Io
Hr
Ic Ic
Fundación
Cimentación
Zona de Atraque
Relleno Inicial
Relleno Final
Pared de la Zanja
L
C
Zona de Incidencia
del Soporte Lateral
E3
E2
Material T3
Material T2
Ib
De
Io
Hr
Ic Ic
Fundación
Cimentación
Zona de Atraque
Relleno Inicial
Relleno Final
Pared de la Zanja
L
Zona de Incidencia
del Soporte Lateral
E3
E2
Material T2
Material T2
3. 4.Para alturas de relleno 0.85m <Hr 3.25m
T2= Gravilla o triturado
T3= Recebo fino
La zona de Atraque debe estar compuesta por materiales triturados
o granulares con un tamaño entre ¾” y 1 ½”, y la zona de relleno
inicial por recebo fino compactado, esta zona inicia a una altura de ¼
del diámetro.
= Para alturas de relleno 0.65 < Hr ¡Ü 0.85 m.
T2=Gravilla o triturado
La zona de Atraque y la zona de relleno inicial debe estar compuesta
por materiales triturados o granulares con un tamaño entre 3/4 y 1½”.
Esta solución aplica para tuberías de hasta 1000 mm o 40”. Para
diámetros mayores o para cargas vehiculares superiores a las de
autopista, es indispensable un diseño que contemple la tubería, el
pavimento y el entorno.
El Yopal, Emisario Final

22 19
CALIDAD CERTIFICADA
NTC 4764LCO
RIB
®


CAPA DE CIMENTACIÓN
ZONA DE
ATRAQUE
Soporte adecuado
debajo del tubo
Incorrectamente
realizado el soporte
debajo del tubo
CAPA DE CIMENTACIÓN
ZONA DE
ATRAQUE

Nota:Para alturas de relleno diferente comunicarse con el departamento de técnicodesarrollo y soporte
Instalación dentro del parámetro máximo de deflexión con valores menores a 7.5% de acuerdo a ASTM D 3034
Esta zona no es recomendada
TABLA 7
Tabla de Altura de Rellenos Máximas dependiendo de los materiales utilizados
para conformar la Zona de Atraque y Relleno Inicial
Densidad
Proctor
Modificado
0,851,001,251,501,752,002,252,502,753,003,253,503,754,004,254,504,755,005,255,505,756,006,256,506,757,007,257,507,758,00
Triturado o Granular Anguloso Clase I 95%
95%
85%
70%
95%
85%
70%
65%
95%
85%
70%
Suelos Orgánicos y Turba Clase V No se acepta en ningún caso este material como material de atraque o relleno inicial
Clasificación del Suelo según ASTM
D2487
Clase II
Clase III
Clase IV
Arenas y Gravas Lavadas
Arenas y Gravas Finas
Limos y Arcillas

Relleno Final
+
+
+Si en el trabajo de compactación se va a emplear un compactador de impacto (saltarín o canguro) se requiere tener cuidado
al densificar la primera capa y no pasar la plancha del compactador exactamente sobre la línea de centro del tubo. En las
capas subsiguientes no se requiere tener cuidado.
Para los casos en que las redes sean instaladas en vías o en pasos vehiculares el material a usar debe tener las características
necesarias para soportar las cargas y evitar el hundimiento de la vía.
Es la zona sobre el tubo, conocida también como relleno final, el material utilizado frecuentemente para conformar esta
zona es material seleccionado proveniente de la excavación. Este relleno se realiza en capas de 25 cm a 30 cm hasta llegar al
nivel deseado, corrientemente se exige una densificación mínima de 90% de Próctor Estándar modificado.
7.Aplique poliuretano del tipo SIKA Flex 221 en todo
el perímetro del empalme hasta rellenar
completamente la sección de la perforación.
8.Conecte la red de la domiciliaria.
Ib
De
Io
Hr
Ic Ic
Fundación
Cimentación
Zona de Atraque
Relleno Inicial
Relleno Final
Pared de la Zanja
L
C
Zona de Incidencia
del Soporte Lateral
E3
E2
Material T2
Material T1
Los siguientes cuadros dependen de la existencia o no de las cargas vivas y del tipo de suelo de excavación. Cuando la altura
de relleno sea menor o igual a 1.5 veces el diámetro, se recomienda un análisis de flotabilidad o boyancia.
Para alturas de relleno 0.45m<Hr¡Ü0.65 m
T1= Concreto
T2= Gravilla o triturado
La zona de Atraque debe estar compuesta por concreto simple con
un f'c = 105 kg/ cm2 y la zona de relleno inicial por materiales
triturados o granulares con un tamaño entre ¾” y 1 ½”, esta zona
inicia a una altura de la mitad del diámetro. Esta solución aplica para
tuberías de hasta 1000mm o 40”. Para diámetros mayores, o para
cargas vehiculares superiores a las de autopista, es indispensable
un diseño que contemple la tubería, el pavimento y el entorno.
Condiciones específicas dependiendo de la altura de relleno
1. 2.
Ib
De
IoHr
Ic Ic
Fundación
Cimentación
Zona de Atraque
Relleno Inicial
Relleno Final
Pared de la Zanja
L
C
Zona de Incidencia
del Soporte Lateral
E3
E2
Material T1
Para alturas de relleno 0.20 m <Hr = 0.45 m
T1= Concreto
La zona de Atraque y relleno inicial deberán estar compuestas por
concreto simple con un fc = 105 kg/cm2. Para la instalación de tuberías
mayores a 500 mm o 20” y menores a 900 mm o 36” es necesario
colocar una malla de fuerzo electro soldada de tipo R7 en la parte
superior de la tubería. Para diámetros mayores, o para cargas
vehiculares superiores a la de autopista, es indispensable un diseño
que contemple la tubería, el pavimento y el entorno. Esta opción puede
ser sustituida por una estructura tipo cárcamo.

20 21
CALIDAD CERTIFICADA
NTC 4764LCO
RIB
®
5.
1.
2.
3.
4.
5.
6.
7.
8.
9.
10.
11.
6.Prepare la sección de tubo de la domiciliaria a la
cual se le ha colocado una unión con una
longitud aproximada de 40 mm y compruebe
funcionalidad. Aplique acondicionador de
superficie sobre el tubo.
Inserte la sección de tubería domiciliaria y aplique
acondicionador SIKA Primer 215 a la zona a
empalmar.
Instalación de Sillas de Derivación
Coloque la silla sobre el tubo y marque en forma
visible el contorno del hueco de la derivación.
Inicie la perforación del tubo a 1 cm del borde
exterior del trazo de la derivación utilizando un
villamarquín.
Continúe la perforación con un serrucho de punta o
caladora elaborando un corte continuo.
Limpie y remueva la rebaba hasta que la superficie
de la tubería quede lisa, retirando todos los
sobrantes.
Ubique la silla en el tubo, rectifique la funcionalidad
del acople y realice marcas exteriores como guía
para el empalme definitivo.
Coloque zunchos plásticos o tortones de alambre
alrededor del tubo.
Aplique el acondicionador de superficie (Sika
Primer 215) en el tubo y en el accesorio,
logrando una superficie adecuada para el pegue
final, deje secar por un tiempo de 5 a 7 minutos.
Aplique el Adhesivo (Sika Flex 221), en un ancho de
1.5cm a partir del borde de la perforación, sobre
el valle del perfil aplicando el adhesivo hasta que
se vea un rebose.
+
+
+
+
+
+
+
Haga una aplicación similar en la silla alrededor de
la derivación a 1.5 cm de su borde.
Coloque la silla sobre el tubo siguiendo las marcas y
ejerza presión sobre ella.
Ajuste los zunchos plásticos o tortones con el fin de
asegurar la silla al tubo.
Nota. Las sillas también pueden ser instaladas con
adhesivo sellante de un solo paso marca
Durman, aplicando el mismo procedimiento
enunciado a excepción del numeral 7.
Instalación de derivación en tubería y RIB LCO ®
3. 4.Retire la sección de pared del tubo y limpie el
perímetro del orificio.
1. 2.Seleccione el lugar de la perforación marcando
sobre la zona de la pared del tubo el lugar de
la conexión domiciliaria.
Con un cincel y un martillo corte el perfil metálico
de la zona a perforar
Con un serrucho de punta corte la pared del tubo
hasta completar el orificio.
RIB STELE®

20 21
CALIDAD CERTIFICADA
NTC 4764LCO
RIB
®
5.
1.
2.
3.
4.
5.
6.
7.
8.
9.
10.
11.
6.Prepare la sección de tubo de la domiciliaria a la
cual se le ha colocado una unión con una
longitud aproximada de 40 mm y compruebe
funcionalidad. Aplique acondicionador de
superficie sobre el tubo.
Inserte la sección de tubería domiciliaria y aplique
acondicionador SIKA Primer 215 a la zona a
empalmar.
Instalación de Sillas de Derivación
Coloque la silla sobre el tubo y marque en forma
visible el contorno del hueco de la derivación.
Inicie la perforación del tubo a 1 cm del borde
exterior del trazo de la derivación utilizando un
villamarquín.
Continúe la perforación con un serrucho de punta o
caladora elaborando un corte continuo.
Limpie y remueva la rebaba hasta que la superficie
de la tubería quede lisa, retirando todos los
sobrantes.
Ubique la silla en el tubo, rectifique la funcionalidad
del acople y realice marcas exteriores como guía
para el empalme definitivo.
Coloque zunchos plásticos o tortones de alambre
alrededor del tubo.
Aplique el acondicionador de superficie (Sika
Primer 215) en el tubo y en el accesorio,
logrando una superficie adecuada para el pegue
final, deje secar por un tiempo de 5 a 7 minutos.
Aplique el Adhesivo (Sika Flex 221), en un ancho de
1.5cm a partir del borde de la perforación, sobre
el valle del perfil aplicando el adhesivo hasta que
se vea un rebose.
+
+
+
+
+
+
+
Haga una aplicación similar en la silla alrededor de
la derivación a 1.5 cm de su borde.
Coloque la silla sobre el tubo siguiendo las marcas y
ejerza presión sobre ella.
Ajuste los zunchos plásticos o tortones con el fin de
asegurar la silla al tubo.
Nota. Las sillas también pueden ser instaladas con
adhesivo sellante de un solo paso marca
Durman, aplicando el mismo procedimiento
enunciado a excepción del numeral 7.
Instalación de derivación en tubería y RIB LCO ®
3. 4.Retire la sección de pared del tubo y limpie el
perímetro del orificio.
1. 2.Seleccione el lugar de la perforación marcando
sobre la zona de la pared del tubo el lugar de
la conexión domiciliaria.
Con un cincel y un martillo corte el perfil metálico
de la zona a perforar
Con un serrucho de punta corte la pared del tubo
hasta completar el orificio.
RIB STELE®

22 19
CALIDAD CERTIFICADA
NTC 4764LCO
RIB
®


CAPA DE CIMENTACIÓN
ZONA DE
ATRAQUE
Soporte adecuado
debajo del tubo
Incorrectamente
realizado el soporte
debajo del tubo
CAPA DE CIMENTACIÓN
ZONA DE
ATRAQUE

Nota:Para alturas de relleno diferente comunicarse con el departamento de técnicodesarrollo y soporte
Instalación dentro del parámetro máximo de deflexión con valores menores a 7.5% de acuerdo a ASTM D 3034
Esta zona no es recomendada
TABLA 7
Tabla de Altura de Rellenos Máximas dependiendo de los materiales utilizados
para conformar la Zona de Atraque y Relleno Inicial
Densidad
Proctor
Modificado
0,851,001,251,501,752,002,252,502,753,003,253,503,754,004,254,504,755,005,255,505,756,006,256,506,757,007,257,507,758,00
Triturado o Granular Anguloso Clase I 95%
95%
85%
70%
95%
85%
70%
65%
95%
85%
70%
Suelos Orgánicos y Turba Clase V No se acepta en ningún caso este material como material de atraque o relleno inicial
Clasificación del Suelo según ASTM
D2487
Clase II
Clase III
Clase IV
Arenas y Gravas Lavadas
Arenas y Gravas Finas
Limos y Arcillas

Relleno Final
+
+
+Si en el trabajo de compactación se va a emplear un compactador de impacto (saltarín o canguro) se requiere tener cuidado
al densificar la primera capa y no pasar la plancha del compactador exactamente sobre la línea de centro del tubo. En las
capas subsiguientes no se requiere tener cuidado.
Para los casos en que las redes sean instaladas en vías o en pasos vehiculares el material a usar debe tener las características
necesarias para soportar las cargas y evitar el hundimiento de la vía.
Es la zona sobre el tubo, conocida también como relleno final, el material utilizado frecuentemente para conformar esta
zona es material seleccionado proveniente de la excavación. Este relleno se realiza en capas de 25 cm a 30 cm hasta llegar al
nivel deseado, corrientemente se exige una densificación mínima de 90% de Próctor Estándar modificado.
7.Aplique poliuretano del tipo SIKA Flex 221 en todo
el perímetro del empalme hasta rellenar
completamente la sección de la perforación.
8.Conecte la red de la domiciliaria.
Ib
De
Io
Hr
Ic Ic
Fundación
Cimentación
Zona de Atraque
Relleno Inicial
Relleno Final
Pared de la Zanja
L
C
Zona de Incidencia
del Soporte Lateral
E3
E2
Material T2
Material T1
Los siguientes cuadros dependen de la existencia o no de las cargas vivas y del tipo de suelo de excavación. Cuando la altura
de relleno sea menor o igual a 1.5 veces el diámetro, se recomienda un análisis de flotabilidad o boyancia.
Para alturas de relleno 0.45m<Hr¡Ü0.65 m
T1= Concreto
T2= Gravilla o triturado
La zona de Atraque debe estar compuesta por concreto simple con
un f'c = 105 kg/ cm2 y la zona de relleno inicial por materiales
triturados o granulares con un tamaño entre ¾” y 1 ½”, esta zona
inicia a una altura de la mitad del diámetro. Esta solución aplica para
tuberías de hasta 1000mm o 40”. Para diámetros mayores, o para
cargas vehiculares superiores a las de autopista, es indispensable
un diseño que contemple la tubería, el pavimento y el entorno.
Condiciones específicas dependiendo de la altura de relleno
1. 2.
Ib
De
IoHr
Ic Ic
Fundación
Cimentación
Zona de Atraque
Relleno Inicial
Relleno Final
Pared de la Zanja
L
C
Zona de Incidencia
del Soporte Lateral
E3
E2
Material T1
Para alturas de relleno 0.20 m <Hr = 0.45 m
T1= Concreto
La zona de Atraque y relleno inicial deberán estar compuestas por
concreto simple con un fc = 105 kg/cm2. Para la instalación de tuberías
mayores a 500 mm o 20” y menores a 900 mm o 36” es necesario
colocar una malla de fuerzo electro soldada de tipo R7 en la parte
superior de la tubería. Para diámetros mayores, o para cargas
vehiculares superiores a la de autopista, es indispensable un diseño
que contemple la tubería, el pavimento y el entorno. Esta opción puede
ser sustituida por una estructura tipo cárcamo.

18 23
CALIDAD CERTIFICADA
NTC 4764LCO
RIB
®
Ib
De
Io
Hr
Ic Ic
Fundación
Cimentación
Zona de Atraque
Relleno Inicial
Relleno Final
Pared de la Zanja
L
Zona de Incidencia
del Soporte Lateral
E3
E2
Material T3
Material T2
Ib
De
Io
Hr
Ic Ic
Fundación
Cimentación
Zona de Atraque
Relleno Inicial
Relleno Final
Pared de la Zanja
L
C
Zona de Incidencia
del Soporte Lateral
E3
E2
Material T3
Material T2
T2= Gravilla o triturado
T3= Recebo fino
La zona de Atraque debe ser compuesta por materiales triturados o
granulares con un tamaño entre ¾” y 1 ½” y la zona de relleno inicial por
recebo fino compactado, esta zona inicia a partir de ¾ del diámetro.
5. 6.Para alturas de relleno 3.25 m <Hr 4.75 m= Para alturas de relleno 4.75 m <Hr 6.25 m =
T2= Gravilla o triturado
T3= Recebo fino
La zona de Atraque debe estar compuesta por materiales triturados o
granulares con un tamaño entre ¾” y 1 ½” y la zona de relleno inicial por
recebo fino compactado, esta zona inicia a una altura de la mitad del
diámetro.
+
+
+
+
+Se deberá continuar colocando, el relleno, capa por capa, en
espesores y procesos según se explicó anteriormente, para
conformar la zona de relleno inicial con material selecto
alternando de un lado a otro y compactando cada capa de
material.
Cuando el material de excavación no contenga limo orgánico,
material vegetal, desperdicios o escombros podrá utilizarse para
la conformación de la zona de relleno inicial, previamente
extrayendo los materiales con una granulometría superior 1 ¾”.
+
+
+
+El espesor de cada capa depende principalmente del tipo
material selecto y del equipo de densificación con que se cuente.
Esto con el propósito de proporcionar una acomodación
conveniente de sus partículas. Cuando se utilizan materiales
como triturados o gravas gruesas, por ser muy fácil de acomodar
genera un significativo ahorro en equipo mecánico y en mano de
obra, con el consiguiente mejoramiento de los rendimientos.
Paralelamente provee un conveniente drenaje subterráneo.
+
+Para el caso en el cual la instalación no pueda cumplir con los
rellenos mínimos deberá consultarse con el Departamento de
Desarrollo y Soporte Técnico y así llegar a determinar el material
de atraque.
Para la conformación de la zona de atraque preferiblemente se
debe rellenar con materiales del tipo arena limpia bien gradada
(SW), arena limpia mal gradada (SP) gravas bien o mal gradadas
(GW y GP), piedra quebrada o cualquier subproducto de
triturado entre 6 y 40 mm, teniendo en cuenta que el material y la
manera en que se coloquen van a influir directamente en el
comportamiento mecánico del sistema RIB LC® -Suelo
Si se trata de un material cohesivo o arena o mixto, la
densificación va ser manual se deberá conformar capas de 15
cm aproximadamente. Si se emplea un compactador mecánico o
saltarín las capas deben ser de 25 cm a 30 cm. Si se tratará de
un material cohesivo se deben obtener consolidaciones del 95%
del Próctor Modificado. Si se utiliza arena, gravilla de río o si se
colocará piedra triturada se deberá acomodar el material
homogéneamente hasta llegar a los niveles indicados en la Tabla
5, valor tabulado como (lo).
El contenido de finos (porcentaje que pasa por el tamiz #200)
deberá ser inferior al 25%, y el índice de plasticidad del material
que pasa por el tamiz #40 será menor de 10%.
O
Zona de atraque y relleno inicial
El Yopal, Emisario Final
El Yopal, Emisario Final
Ib
De
Io
Hr
Ic Ic
Fundación
Cimentación
Zona de Atraque
Relleno Inicial
Relleno Final
Pared de la Zanja
L
C
Zona de Incidencia
del Soporte Lateral
E3
E2
Material T3
Material T2
Ib
De
Io
Hr
Ic Ic
Fundación
Cimentación
Zona de Atraque
Relleno Inicial
Relleno Final
Pared de la Zanja
L
Zona de Incidencia
del Soporte Lateral
E3
E2
Material T2
Material T2
3. 4.Para alturas de relleno 0.85m <Hr 3.25m
T2= Gravilla o triturado
T3= Recebo fino
La zona de Atraque debe estar compuesta por materiales triturados
o granulares con un tamaño entre ¾” y 1 ½”, y la zona de relleno
inicial por recebo fino compactado, esta zona inicia a una altura de ¼
del diámetro.
= Para alturas de relleno 0.65 < Hr ¡Ü 0.85 m.
T2=Gravilla o triturado
La zona de Atraque y la zona de relleno inicial debe estar compuesta
por materiales triturados o granulares con un tamaño entre 3/4 y 1½”.
Esta solución aplica para tuberías de hasta 1000 mm o 40”. Para
diámetros mayores o para cargas vehiculares superiores a las de
autopista, es indispensable un diseño que contemple la tubería, el
pavimento y el entorno.
El Yopal, Emisario Final

24 17
LCO
RIB
®
Conexión de tuberías y a pozos de inspecciónRIB LCO ®RIB STELE®
+
+
+
Antes de realizar la unión, limpie el espigo y la campana con limpiador de PVC, como mecanismo para acondicionar la
superficie. Rectifique la alineación de los tubos.
Introduzca 1 cm el espigo en la campana.
Aplique una capa uniforme de soldadura* para tecnología RIB LC® y RIB STEL® y proceda a empujar la tubería,
conformando así una unión soldada hermética.
*La soldadura está disponible en dos presentaciones: uso normal y para instalaciones sumergidas, para esta última
presentación debe solicitar mayor información con el Departamento de Desarrollo y Soporte Técnico.
O E
! Mayor durabilidad frente a movimientos
! Hermeticidad
! Durabilidad de la unión al ser del mismo material del tubo
! Facilidad en la instalación
! No hay desperdicio en obra
! Menores perdidas hidráulicas por no presentar resalto
! Mayor superficie de contacto para garantizar hermeticidad
! Bajo costo
Ventajas de la Unión
Altura de Relleno Mínimo para el Equipo de Compactación
CALIDAD CERTIFICADA
NTC 4764
Plancha vibratoria
manual e.g. Ingersoll
Rand VX6.
Hr min > 0.15 m
Rodillo vibratorio
manual e.g. Ingersoll
Rand SX-17 (.85 toneladas)
Hr min > 0.40 m
Aplanadora vibratoria
de 3 toneladas ej.
Vibrol 28W o
Vibrol 32R
Hr >0.55 m
Bulldozer convencional
Hr min > 0.60 m
Mototrailla, Rodillo
Pata de cabra, y/o similar.
Hr min > 0.60 m
TABLA 6
Ib
De
Io
Hr
Ic Ic
Fundación
Cimentación
Zona de Atraque
Relleno Inicial
Relleno Final
Pared de la Zanja
L
Zona de Incidencia
del Soporte Lateral
E3
E2
Material T2
Material T2
7.Para alturas de relleno en Hr > 6.25 m
T2= Gravilla o Triturado
La zona de Atraque y relleno inicial deben estar
compuestas por materiales triturados o granulares
con un tamaño entre ¾” y 1 ½”.
Los anteriores gráficos aplican bajo la utilización de la tubería RIB LC para los diámetros desde 160 mm o 6” hasta 575
®
mm o 23”, y RIB STELdesde 500 mm o 20” hasta 2500 mm o 100”.
®
Recomendaciones para el análisis de tuberías superficiales y/o con cargas superiores a las de autopista, diámetros
excluidos en este modelo.
Para estos casos se deben contemplar algunos parámetros específicos:
-Deflexión en el pavimento por la transmisión de las cargas. Si la tubería es de gran diámetro y el recubrimiento es muy
bajo, de acuerdo con los conceptos de la mecánica estructural, la losa de concreto deberá llevar la gran mayoría de las
solicitaciones estructurales, analizando como losa de carga o como viga plana sobre fundación elástica, definiéndose a
partir de allí el espesor y refuerzo de la misma. Esto es especialmente importante para tuberías de 1500 mm en adelante
con recubrimientos de menos de 0.50 m.
-Efecto de concentración de cargas en el tubo. En tuberías superficiales, con diámetros cuya relación en la fórmula
siguiente sea inferior a 1.0, la carga no se distribuye en toda la proyección horizontal, por lo que se deberán tomar
consideraciones en el diseño del pavimento y el material de cobertura.
Relación diámetro a relleno: D / (1.2*H + 0.30)
Para aplicaciones que no se contemplan en este manual, el departamento de desarrollo y soporte técnico está a las órdenes
de quienes así lo requieran.
O
E
Al instalar la tubería se deberá adoptar un sistema que absorba los movimientos diferenciales y esfuerzos que se pueden
generar entre la tubería y la estructura especialmente al construir redes en suelos blandos.
Este sistema consistirá en la instalación de una banda de material elástico o espuma de polietileno de celda cerrada
alrededor del tramo del tubo a empotrar en el cilindro del pozo.
Longitud de empalme 24 cm

Unión de la tubería
La unión que se practica entre los tubos
RIB STELse logra
mediante fusión química utilizando
cemento solvente de PVC lo que
garantiza un sistema hermético, a la vez
que impide la penetración de raíces que
causaría obstrucción en los conductos.
RIB LC®y ®

Las tuberías RIB LC® y RIB
STEL® poseen en uno de sus
extremos una banda de unión
interna, la cual cumple la función de
espigo, en su empalme tiene un
refuerzo rectangular el cual debe
ubicarse en la parte superior del tubo
al instalarse.
O
O
E
E
Por su bajo peso este tipo de tubería puede ser colocada fácilmente sin tener
que hacer uso de medios mecánicos
Para bajar los tubos al fondo de la zanja, si ésta no es muy profunda, y si la
tubería no tiene fleje metálico (diámetros de 475mm o menos), se puede
hacer con solo dos personas, ayudadas con elementos como sogas planas
para facilitar su movilización.
Para diámetros mayores o para tuberías a profundidades de más de 2.50
metros se recomienda el apoyo en la manipulación de una retroexcavadora
liviana.
+
+
+
Usualmente con dos apoyos a los cuartos medios (ver foto) es suficiente
aún para tuberías pesadas de longitud 6.00 m. Para amarrar e izar la
tubería se pueden usar cuerdas planas tejidas (como las de remolque de
autos) o bien cadenas de acero gruesas (eslabones de 6.35 mm o más).
Cuando es un tubo liviano (diámetros de 650 mm o menos) en una zanja de
dos metros de profundidad o menos, puede colocarse una manila o lazo a
cada extremo del tubo para luego bajarlo lentamente hasta el fondo de la
excavación. Por ningún motivo use cadenas de eslabón pequeño ni cables
metálicos para manipular tubería.
Colocación de la tubería yRIB LCO ®

RIB STELE®
16 25
CALIDAD CERTIFICADA
NTC 4764LCO
RIB
®
Villanueva, Barrio El Mirador
Tunja, Colector Jordán
Detalle conexión de pozos de inspección
El espesor de la banda depende del diámetro de tubo (ver tabla 8) y su ancho
es igual al espesor del muro menos 2 cms, de tal manera que permita la
aplicación un material sellante.
La banda será fijada alrededor del tubo, antes de realizar el empotramiento
del mismo, por medio de zunchos o tortones de alambre. Deberá existir un
traslapo mínimo de 10 cm en los extremos de la banda.
Para la zona interna del pozo se conformará un cordón alrededor del
perímetro del tubo con material sellante elástico o poliuretano del tipo
Sikaflex 221 o similar. Esto garantizará estanqueidad en la transición de los 2
materiales, concreto y PVC. Y para la zona externa se conformará un anillo
utilizando una mezcla de cemento puro y Sika 2.
Como segunda opción para suelos blandos se pueden utilizar las transiciones
de elastoliq Durman aplicando el mismo procedimiento de instalación
descrito anteriormente.

En suelos semirrígidos, o donde se garantice la no presencia de
asentamientos diferenciales se hará un contacto directo de la pared
estructural del tubo con la pared de pozo. Y en la zona interna del pozo se
aplicará un cordón de poliuretano alrededor de la punta del tubo luego de
haber pañetado la pared interna del pozo.
Villavicencio, Plan Maestro de Alcantarillado Sanitario
TABLA 8
mm plg
160 a 425 6” a 17” 9 mm
450 a 650 18” a 26” 11 mm
675 a 975 27” a 39” 12 mm
1000 a 2000 40” a 80” 13 mm
2000 a 3000 82” a 120” 14 mm
Espesor de la espuma de
Polietileno
DIAMETRO
SUELOS BLANDOS SUELOS RIGIDOS
Transiciones Elastoliq

CALIDAD CERTIFICADA
NTC 4764
Cimentación
!Si las aportaciones de agua son muy elevadas se debe analizar la inclusión del
sistema “well-point”, consistente en tuberías perforadas a ambos lados de la zanja
que absorben el agua del terreno bajando el nivel freático en la zona controlando de
no secar demasiado la zona para evitar que construcciones vecinas sufran
hundimientos .
Adicional a lo anterior es importante anotar que cuando el nivel freático es muy alto, la
migración de material fino desde la pared de la zanja al material de atraque puede
ocurrir, causando una reducción en el soporte lateral del tubo.
Para prevenir la migración de finos se puede utilizar un geotextil no tejido punzonado por
agujas o uno monofilamento, este deberá envolver totalmente el material de atraque de
la tubería.
Con respecto a la cimentación, al encontrar suelos muy malos será necesario hacer una
sobre-excavación y reemplazar el material por uno de mayor capacidad portante, o en su
defecto colocar una geomalla Biaxial combina con geotextil no tejido para mejorar la
capacidad portante.
Es importante aclarar que la tubería ,
al igual que todas las tuberías termoplásticas, es una tubería
flexible y su comportamiento depende del material de atraque
y el ancho de la zanja, y en menos proporción del tipo de
cimentación que seutilice. La función primordial de esta es en

realidad la de ofrecer un apoyo firme, continuo y homogéneo
donde se pueda colocar convenientemente la tubería,
retirando cualquier objeto extraño que pueda impedirlo. Así
como permitir distribuir la resultante vertical de las cargas
totales.
La cimentación se debe elaborar colocando una capa continua
de material selecto con un espesor mínimo de 10 cm,
preferiblemente gravilla o triturado. Esto permite absorber
o eliminar las irregularidades que siempre quedan en el
fondo de la zanja al ejecutar su excavación.
RIB LC yRIB STEL
® ®O E
En caso de que se encuentre un material poco consistente en
el fondo de la zanja, se recomienda sustituir por lo menos
20 cm, dependiendo de la magnitud del problema, con
material granular hasta lograr una buena consistencia.
26 15
LCO
RIB
®
El Yopal, Emisario Final
Mantenimiento, Colocación de la Unión en Obra
1
5
2
6
3 4
Funza, Centro Logístico La Cofradía
Funza, Centro Logístico La Cofradía

Granulometría de materiales
La tabla contigua permite tener criterios para
seleccionar los materiales de atraque y relleno
inicial, la decisión de uso o no depende de su
consecución cerca de la obra.
El interés es dar herramientas de criterio más no son
obligatorios.

TABLA 9
Nombre del MaterialTamiz mm Recebo B600 Recebo B400 Grava Triturado
3"75.000
2 ½"63.000
2"50.000 100
1 ¾"45.000 100
1 ½"37.500 100 100 10090 - 100
1 ¼"31.500 90 - 10070 - 95
1"25.000 70 - 100 75 - 9585 - 9050 - 70
¾"19.000 60 - 90 50 - 6535 - 40
½"12.500 30 - 4015 - 25
3
/
8"9.500 40 - 75 40 - 7515 - 30 0 - 5
No 44.750 30 - 60 30 - 60 0 - 5
No 82.360
No 102.000 20 - 50 20 - 45
No 161.180
No 300.600
No 400.425 oct-30 15 - 30
No 500.300
No 1000.150
No 2000.075 may-15 5 - 20
Arena Gruesa
Arena Media
Arena Fina
Grava Gruesa
Grava Fina
La versatilidad del sistema permite utilizar
tubos en longitudes variables según necesidades
disminuyendo los desperdicios de las obras.
Tenga a mano todos los elementos necesarios para
habilitar el nuevo espigo: sección de tubería con corte
perpendicular, perfil unión soldadura ,
limpiador Durman, flexómetro, serrucho, brocha,
escuadra y marcador .

Rectifique el diámetro interno del Tubo.
Determine el perímetro del tubo para calcular la
longitud de la unión multiplicando el diámetro del tubo
por (3.1416).

Corte la unión perpendicularmente en el lugar
marcado.
Limpie la sección de unión con limpiador de PVC.
Limpie la zona del tubo donde se colocará la unión.
RIB LC®
RIB LC®
O
O
1.
2.
3.
4.
5.
6.

Elaboración de la zanja
Al excavar una zanja, primero se verifica el trazado según planos,
la pendiente longitudinal y el ancho requerido. Se recomienda
iniciar desde el descole, lo que significa que la dirección del
proceso de excavación irá en contra flujo, de aguas abajo hacia
aguas arriba.
Se debe usar tablestacados, entibación, apuntalamiento o
pantallas en la zanja por seguridad buscando proteger al
personal de derrumbes, u otras condiciones inestables del suelo
y como prevención para evitar daños en cimentaciones de
edificios vecinos, vías o alteraciones que puedan afectar el
ambiente.
Al presentarse agua en la excavación de la zanja será necesario
drenarla para mantener la estabilidad del sitio. Cuando se
excava se debe controlar el nivel freático, asegurándose que se
mantenga por debajo del fondo de la excavación para prevenir la
salida de material entre el tablestacado o el apuntalamiento
exponiendo las paredes de la zanja. El agua deberá ser
controlada en la zanja antes y durante la instalación de la
tubería, manteniendo el control durante la instalación del
recubrimiento y la colocación de suficiente relleno previendo la
flotación de la tubería (análisis de boyancia o flotación).
Para prevenir la perdida del soporte natural, los métodos de
drenaje deberán ser usados minimizando el traslado de finos
y la creación de cavernas en el terreno natural. En ocasiones
puede ser necesario usar un geotextil para limitar la
migración de finos.
Los materiales, como la gravilla o triturado, utilizados para la
cimentación de la tubería permiten el drenaje de las aguas
subterraneas.
!Si el nivel de agua es bajo por tener aportaciones pequeñas,
se puede evacuar por medio de bombas sumergibles
situadas en el punto más bajo.
!Si las aportaciones de agua son mayores, además de utilizar
bombas en los puntos bajos, será necesario colocar un
drenaje “francés” en la parte inferior de la solera de la
instalación, conformado por grava con una granulometría
20/40, ayudado con tubería de drenaje para trabajar en
seco. (Analizar si se requiere de Geotextil).
14 27
CALIDAD CERTIFICADA
NTC 4764LCO
RIB
®
Bogotá D.C., Barrio San Carlos Suba
Villavicencio, Plan Maestro de Alcantarillado Sanitario
7 8
9 10
11 12
7.
8.
9.
10.
11.
12.
Aplique uniformemente soldadura en la
zona de la tubería.
Continúe la aplicación de la soldadura en la unión en un
extremo del lado donde se ubica la vena separadora.
Coloque la unión en el tubo llevando a tope los dos
extremos y sujétela en la parte inferior.
Doble la unión en forma de un corazón para introducirla
en su totalidad.
Distribuya los posibles excesos de soldadura en todo el
borde de la unión.
Coloque el parche en la zona donde empalman los dos
extremos de la banda.
RIB LC
®O
Mantenimiento, Procedimiento para el corte del tubo en obra
1.
2.
3.
4.
5.
6.
Determine la longitud de tubería a cortar.
+
Mida la distancia entre cada una de las
Tee´s en forma tangencial al eje en
alguno de los extremos del Tubo.
+
Marque la distancia medida en la zona a
cortar y continúe demarcando la tubería
siempre trasladando la marca a la
siguiente Tee del lado derecho.
+
Comience el corte empleando un
serrucho de diente pequeño, buscado la
siguiente marca.
+
Recorra todo el perímetro del tubo hasta
finalizar el corte, manteniendo la
dirección conformada por las marcas
realizadas.
+
Limpie la rebaba del corte.
21 3
4 5 6