Mission Bhagiratha

AshishJoel 7,774 views 18 slides Jan 19, 2018
Slide 1
Slide 1 of 18
Slide 1
1
Slide 2
2
Slide 3
3
Slide 4
4
Slide 5
5
Slide 6
6
Slide 7
7
Slide 8
8
Slide 9
9
Slide 10
10
Slide 11
11
Slide 12
12
Slide 13
13
Slide 14
14
Slide 15
15
Slide 16
16
Slide 17
17
Slide 18
18

About This Presentation

It is a Ppt on Mission Bhagiratha


Slide Content

W ELCOME

Rural Water Supply & Sanitation “ Mission Bhagiratha ”

INDEX Aim Source Distribution System Pipe Joints Fittings of Tap Connections Treatment Plant OHBR Purpose of OHBR Design Details of OHBR

on 7 August 2016

AIM This Project is adopted By Government of Telangana, to Supply Clean Drinking Water of 150 litres per person in 67 urban habitations and 100 litres per person for 2500 rural habitations.

SOURCE The source of water is Collected from Krishna and Godavari rivers which flow through Telangana State.

DISTRIBUTION SYSTEM The Water Collected are Transported to Filter beds and Treatment Plants using the Pipes shown below RCC Pipes: 80cm Diameter and 2.5 meters Long

Treatment Plants The Water are processed to filtrate and are supplied The Water are Treated and Supplied to their respective OHBR

Types Of Pipes 1.Major Pipes 2. Minor Pipes 3. Branch Pipes

PIPE JOINING A Machine named “Electro Butt Fusion Machine” is Used to Join HDPE Pipes.

Fixing Tap Connection Pipes Pipe Pealer Saddle Cutter Pipe Heating Device 1 2 3 4 The Apparatus for connecting Branch pipes to Minor Pipes are given below

Process of Making Holes In Major Pipes Step:1 Step:2 Step:3 Step:4 Step:5

Fitting Of Taps Taps are connected to each house

OHBR OHBR(Over Head Balance Reservoir) : Over head balance reservoir is an elevated tank which is above the ground surface. As shown in Below

Purpose of OHBR There are various purposes of an OHBR but some major purposes are; Water can be stored for long period. Water are supplied using Gravity Distribution System. Water can be stored based on the population of the village. Water stored are used for Domestic purposes and in Emergency cases

Design Details of OHBR The type of foundation is raft foundation. The grade of concrete mix is M 25 . The mix proportion of concrete is 1:1 1/2 :3. The total height of tank is 12.90m, it depends on the capacity of OHBR i.e. 40kL The dia of main steel Bars are 10mm and distribution steel bars are 8mm The Steps are Pre-stressed Concrete Steps and are arranged Spherically to Column

Layout of Water Supply

T hank Y ou
Tags