About This Presentation
Hi
Size:
1.22 MB
Language:
en
Added:
Sep 14, 2024
Slides:
19 pages
Slide Content
Slide 1
Mitsubishi Power Europe GmbH
© Mitsubishi Power Europe GmbH
BATTERY ENERGY
STORAGE SYSTEM
30.09.2021
Slide 2
© Mitsubishi Power Europe GmbH 2
MITSUBISHI HEAVY INDUSTRIES OVERVIEW
Mitsubishi Power Europe100%
▸HQ Location: Yokohama, Japan
▸Worth of orders: €25b
▸Employees: approx. 80,000
▸Revenue: €27.7b
Mitsubishi Power EMEA
▸HQ Location: London (UK)
and Duisburg (DE)
▸Employees: approx. 1,000
▸Market Region: Europe,
Middle East, Africa (EMEA)
Slide 3
© Mitsubishi Power Europe GmbH 3
Thermal Industries
Turnkey Projects, Products und Services for:
▸Combined Cycle Gas Turbine Plants (CCGT)
▸Integrated Gasification Combined Cycle (IGCC)
▸Coal-fired Boilers
▸Waste-to-Energy Boilers
▸Industrial Boilers
Expanding
our
Portfolio
+
Decarbonisation of Energy Industry
and Industrial Sectors
Turnkey Projects, Products und Services for:
▸Hydrogen Gas Turbines
▸Power-to-X (Heat Pumps, Green Hydrogen)
▸Energy Storage
▸Solid Oxide Fuel Cells
▸CO
2capture/utilization
▸Digital Solutions
MITSUBISHI POWERS RESPONSE TO CHANGING MARKETS
Slide 4
© Mitsubishi Power Europe GmbH 4
BATTERY ENERGY STORAGE SYSTEM
Electricity
ENERGY EFFICIENCY ENERGY EFFICIENCYENERGY EFFICIENCY
Slide 5
© Mitsubishi Power Europe GmbH 5
MITSUBISHI POWER OFFERING FLEXIBLE TECHNOLOGIES, DELIVERING SOLUTIONS
Commercial &
Industrial Use
Renewable
Energy
Integration
Grid
Services
Microgrids
Fuel cell + Solar
Storage
Hybrid Power
Plants
Gas Turbines
Lithium
Ion
(<6 hours)
Flow
(4-12
hours)
Renewable
Hydrogen
(>24 hours)
H
Hydrogen
H
Hydrogen
1.00794
H
1
~ 500kW –3MW ~ > 5MW ~ > 5MW ~ > 500kW ~ > 20MW
Slide 6
© Mitsubishi Power Europe GmbH 6
BESS FUNCTION DIAGRAM
▸HVAC: Heating Ventilation and Air Conditioning
▸UPS: Uninterruptible Power Supply
▸FSS: Fire Suppression System
▸BMS: Battery Management System
▸BCP: Battery Control Panel
▸EMS: Energy management system
▸SCADA: Supervisory Control And Data Acquisition
Typical BESS Container
DC
System Operation
EMS & SCADA System
Inverter
DC –AC conversion
Transformer
LV –MV conversion
ReserveUPS
HVAC
FSS
BMS
BCP
Grid
Connection
Battery
Rack
Slide 7
© Mitsubishi Power Europe GmbH 7
BESS APPLICATIONS
TransmissionGeneration
Residential
Commercial and IndustriesDistribution
Electricity
Meter
Front of The Meter
Applications
Behind The Meter
Applications
BESS
Microgrid
BESS BESS
Slide 8
© Mitsubishi Power Europe GmbH 8
MITSUBISHI POWER OFFERING DIVERSE APPLICATIONS
Frequency Regulation
& Ancillary Services
▸BESSprovides:
•Frequency regulation
•Black start
•Spinning and non-
spinning reserve
• Reactive Power and
Voltage control
•Power Quality
•Load following/
Ramping up for
renewables
Critical Power, Generation
Enhancement / Deferral
▸BESSprovides
•Backup power
•The defer need for
other peaking
supply resource
•Transmission
congestion relief
•Transmission upgrade
deferral
•Energy Arbitrage
•Firming capacity
▸BESSis dispatched
•To smooth out the
output of renewable
energy assets
•To provide more
predictable production
•Firming capacity
Renewable Integration
▸BESSis dispatched
•To reduce peak load
•To provide time shifting
•To provide electric
supply capacity
•To provide power quality
or demand charge
management
Energy Management,
Peak Capacity
Duration: 0.5h –1h Duration: 1h –2h Duration: 2h –4h Duration: ~4
Slide 9
© Mitsubishi Power Europe GmbH 9
BESS INTEGRATED WITH GRID SERVICES
Standard Situation
▸High demand or supply.
▸Costly TSO or DSO assets installation to treat occasionally peak
demand.
▸Distribution circuit experiencing load growth.
▸Grid outages.
▸Voltage unbalance events.
BESS Applications
▸Frequency regulations
▸Voltage control and Power quality
▸Black start
▸Spinning reserve
BESS Advantages
▸Reducethe cost for backup fossil fuel-based generation ancillary
services.
▸Fast response under load variations.
▸Providingblack start services for conventional generating plant.
▸Savethe operational costs in powering the grid.
▸Reducethe cost to provide frequency regulation and spinning
reserve services.
▸Balancebetween supply and demand.
▸Protectionagainst voltage fluctuations and defects on facility
components.
Withoutpower quality Withpower quality
Frequency Deviation
Frequency Deviation
ChargeCharge
Discharge
Frequency Regulation
Non-critical
Frequency range
Nominal Frequency
Mains voltage /Mains current
Slide 10
© Mitsubishi Power Europe GmbH 10
BESS INTEGRATED WITH HYBRID POWER PLANTS
Standard Situation
▸Limited use of diesel generators or gas engine to black start capabilities.
▸Slow power plant response to grid fluctuations.
▸Increase or decrease of the demand needs below the minimum run
threshold of the power plant.
▸Load changes.
BESS Applications
▸Black start and support of grid restorage.
▸Spinning reserve for peak power.
▸Stabilization of ramp loads in case of imbalances in the grid.
▸Islanding and off-grid services (industrial power plants).
BESS Advantages
▸Offeringlarge number of application opportunies in addition to black
start capabilities.
▸Fast response (<1 sec) of power supply to the grid until the gas
turbine take over.
▸Stablizingof gas and steam turbines during grid outages.
▸Reducethe stress on the gas and steam turbine.
▸ReduceCO2 emissions.
▸Reducethe maintenance and fuel costs.
▸Offeringregulation capacities for the power plant.
Transformer GridGeneratorGas Turbine
Power
Fast start
Black
start
Fast ramp-up and
ramp-down
support
Frequency response PFR +
SFR
Time
Spinning
reserve
Islanding,
off-grid
Minimum
environmental
load
Flexible operation line
Standard operation line
BESS
Inverter
Slide 11
© Mitsubishi Power Europe GmbH 11
BESS INTEGRATED WITH RENEWABLE ENERGY
Standard Situation
▸Renewable energy fluctuations.
▸The use of high- cost generators ( e.g. gas plants)
▸High generation in off-peak time
▸Limited RE generation during peak time.
BESS Applications
▸Ramp rate control.
▸More predictable production.
▸Firming capacity.
BESS Advantages
▸Increaseself consumption.
▸SmoothingPV power fluctuations.
▸Meet the demand during peak periods or other
high-risk periods.
▸Ensureadequate peaking generation capacity.
▸Shiftingrenewable energy generation for peak
demand coverage.
▸Reducethe use of the high cost of generators.
▸Optimizethe energy costs.
Night Day
Charge
Discharge
Charge
Discharge
Power
Ramp rate control
State of charge
control
Power
Power to grid
PV to grid
BESS to grid
PV to BESS
Wind Power Wind Power + BESS power
Time
Time
Slide 12
© Mitsubishi Power Europe GmbH 12
BESS IN COMMERCIAL AND INDUSTRIAL USE
Standard Situation
▸High demand in peak times.
▸Low demand in off-peak times.
▸High electricity prices.
▸Risk of critical load: power supply interruptions.
BESS Applications
▸Power backup.
▸Energy Arbitrage.
▸Load leveling.
▸Peak shaving.
▸Demand response.
BESS Advantages
▸Taking advantage of electricity prices.
▸Balancingenergy demand and supply.
▸Protectionfrom power quality and power supply
interruptions by filtering out imperfections in grid power.
▸Shiftingthe peak demand by charging during off-peak
times and discharging during the peak times.
▸Reductionof peak demand and reduction in electricity bill.
Daily net load profile with energy storage
Demand shift
Smoothed load
Discharging
Charging
Original load
Charging
Discharging
Peak clipped at 12
MW
20
15
10
5
0
-5
Battery
Net Load
Time
Power
Time
Slide 13
© Mitsubishi Power Europe GmbH 13
MITSUBISHI POWER`S VALUE PROPOSITION
Financing
Our balance sheet and low cost of
capital allows variety of financing to
meet customer needs
EPC
Ability to execute both union and non-
union EPC projects using in-house
capabilities and partners
Cost Effective
Strong global supply chain partners
and scale delivering cost effective
solutions
Long- Term Service
Performance guarantee
Remote monitoring
Operation support
Spare part management
System Integration
Optimal System design
Supply of components for long term performance
Integration of Tier1 battery and inverter
manufacturers
Slide 14
© Mitsubishi Power Europe GmbH 14
MITSUBISHI POWER`S PERFORMANCE GUARANTEES
EnergyCapacityGuarantee:
• TheEnergyCapacityGuaranteegivesmaximumacceptablereductionin
systemenergycapacityasafunctionoftimeandasafunctionofsystem
usage.
AvailabilityGuarantee:
• Energyavailableforchargeanddischargeasapercentageoftime.
RoundTripEfficiency(RTE):
• RTEisdefinedastheratiobetweentheenergychargedandtheenergy
dischargedfromtheBESS. Itisgenerallymeasuredatthepointof
interconnection.
Performanceguaranteesaredependentonfinalselectionofbatterytechnology,powerconversionsystems,andSCADAsystems .
Slide 15
© Mitsubishi Power Europe GmbH 15
MITSUBISHI POWER CASE STUDIES
Key Capture Energy: Texas BESS
Mitsubishi Powerturnkey 200 MW / 200 MWh BESS
systems will provide Ancillary Services to help ERCOT
meet the power and energy needs of Texas for many
years to come.
BESS Project Overview
▸Size: 200 MW / 200 MWh
▸Mitsubishi Power Scope: FullTurnkey: All
Equipment, EPC, andPermits
▸Application: ERCOT AncillaryServices
▸Project Life: 15 Years
▸Interconnection Voltage: 138 kV
▸Key Suppliers:
✓Powin
✓SMA
✓CATL
Slide 16
© Mitsubishi Power Europe GmbH 16
MITSUBISHI POWER CASE STUDIES
Hecate Johanna: BESS for California
Mitsubishi Powerturnkey 20 MW / 80 MWh
BESSsystems will provide peak capacity and
revenue from the CAISOmerchant market for
many years to come.
BESS Project Overview
▸Size: 20 MW / 80 MWh
▸Mitsubishi Power Scope: FullTurnkey: All Equipment
andEPC
▸Application: CapacityandCAISO MerchantMarket
▸Project Life: 10 Years
▸Interconnection Voltage: 12 kV
▸Key Suppliers:
Powin
Ingeteam
CATL
Slide 17
© Mitsubishi Power Europe GmbH 17
BESS KEY TAKE- AWAYS
Providing
▸Optimal and customized system design
▸Project feasibility studies
▸Cost-effective and agnostic solutions
▸Proven partnerships with suppliers
▸Turnkey solutions
▸Long-term service agreement
▸Performance guarantees
Enabling
▸Grid control
▸Decentralization
▸Integration of renewables
▸Effective and high- quality project execution
Tags
Categories
General
Download
Download Slideshow
Get the original presentation file
Quick Actions
Embed
Share
Save
Print
Full
Report
Statistics
Views
96
Slides
19
Age
453 days
Related Slideshows
22
Pray For The Peace Of Jerusalem and You Will Prosper
RodolfoMoralesMarcuc
37 views
26
Don_t_Waste_Your_Life_God.....powerpoint
chalobrido8
40 views
31
VILLASUR_FACTORS_TO_CONSIDER_IN_PLATING_SALAD_10-13.pdf
JaiJai148317
36 views
14
Fertility awareness methods for women in the society
Isaiah47
33 views
35
Chapter 5 Arithmetic Functions Computer Organisation and Architecture
RitikSharma297999
32 views
5
syakira bhasa inggris (1) (1).pptx.......
ourcommunity56
34 views
View More in This Category
Embed Slideshow
Dimensions
Width (px)
Height (px)
Start Page
Which slide to start from (1-19)
Options
Auto-play slides
Show controls
Embed Code
Copy Code
Share Slideshow
Share on Social Media
Share on Facebook
Share on Twitter
Share on LinkedIn
Share via Email
Or copy link
Copy
Report Content
Reason for reporting
*
Select a reason...
Inappropriate content
Copyright violation
Spam or misleading
Offensive or hateful
Privacy violation
Other
Slide number
Leave blank if it applies to the entire slideshow
Additional details
*
Help us understand the problem better