Project evaluating network techniques are CPM AND PERT
Size: 7.09 MB
Language: en
Added: Dec 03, 2016
Slides: 22 pages
Slide Content
NAME : AVULA ANIL KUMAR ROLL NO : 1007-15-508-010 SUBJECT : APPLIED STATISTICS SEMISTER : III TOPIC : Network Techniques 4 December 2016
CPM and PERT Network techniques 4 December 2016
Contents INTRODUCTION DEFINITIONS OF PROJECT AND PROJECT MANAGEMENT NETWORK PLANNING METHODS WHAT IS NETWORK CONSTRUCTION OF NETWORK CPM PERT CPM VS PERT 4 December 2016
INTRODUCTION To perform any job optimally we should have some planning Generally planning and performing job is called project. The project requires some techniques to done the project Those are CPM and PERT 4 December 2016
Definitions Project : project is a group or combination of activities that must be executed in a certain fixed order before entire task is completed. The projects are non-repetitive large tasks Project management : Project management is a scientific way of planning, implementing, monitoring & controlling the various aspects of a project such as time, money, materials, manpower & other resources. 4 December 2016
Real time example for a project Project : Getting ready to attend the college Wake up in the Morning Brush your teeth Take bath Wear formal dress Take break fast Walk to the college These are the basic activities we need to complete for accomplishment of project. 4 December 2016
Network Planning methods Methods used for network planning are: CPM PERT Managing a project with network planning methods involves four steps: Describing the project. Diagramming the Network. Estimating time of completion. Monitoring project progress. 4 December 2016
Network Diagram Network : Network is a graphical representation of a project operations and it is composed of several activities and events which are inter-related. Network consists of : Event Activity 4 December 2016
Basic Building blocks of Network Activity: Activity is a recognizable part of the project which consume time and resources for its completion. In network diagram “ARROW” represents activity Critical activity Dummy activity Event : An event represents the accomplishment of some task. In a network diagram, beginning and ending of an activity represented by an event. In network diagram “NODE” represents event. Merge event Burst event 4 December 2016
Construction of a Network Rules for drawing network diagram Each activity is represented by one and only one arrow in the network No two activities can be identified by the same end events Before an activity can begin, it preceding activities must be completed. Arrows indicate logical precedence. Flow of the diagram is from left to right Arrows should not intersect. Dangling should be avoided. 4 December 2016
Activity Precedence A -------- B -------- C A D B E A F B G C,D H G,F I E J H,I K J 4 December 2016
CPM CPM means “critical path method”. It is a network technique used to evaluate the project. If the activity times are deterministic then critical path method can be used as a systematic method. CPM evaluates project by determining critical path in the network. 4 December 2016
Critical Path Critical path is the longest path in the network from the starting event to ending event Critical path defines minimum time required to complete the project In network diagram critical path is represented with double arrows Critical path consist: Critical event: The events with zero slack Critical activity: The activities with zero total float 4 December 2016
Network of CPM Earliest Activity start time(EST) The earliest start time that an activity can be started Earliest Activity finish time(EFT) EFT= EST + Duration Latest Activity finish time(LFT) Latest Activity start time(LST) LST= LFT-duration 4 December 2016
Types of Float Total float (TF) ij = (L j – T ij )- E i Free float (Ff) Ij =Total float – ( L j - E j ) Independent float (If) ij = Free float- Tail event slack E i E j L i L j 4 December 2016
Draw network diagram and analyzing CPM Activity Immediate predecessor Duration (months) A -------------- 2 B -------------- 5 C -------------- 4 D B 5 E A 7 F A 3 G B 3 H C,D 6 I C,D 2 J E 5 K F,G,H 4 L F,G,H 3 M I 12 N J,K 8 4 December 2016
PERT PERT means project (or) programme Evaluation & Review Technique. When activity times are probabilistic, PERT is an effective tool for evaluate project. PERT is associated with 3 time estimates Optimistic Time ( t o ) Pessimistic Time ( t P ) Most likely Time ( t m ) 4 December 2016
Activity Times in PERT Optimistic Time : ( T o ) It is the minimum time that is required to complete an activity when every resource is available Most likely Time : ( T m ) This is the time required for the completion of activity under normal conditions. Pessimistic Time : ( T p ) The most time that is required to complete activity when every resource is not available Note: In PERT β – distribution is used to represent these three time estimates 4 December 2016
Formulae used for evaluation of PERT Time estimate ( T e )= Standard deviation ( )= Variance 4 December 2016
CPM VS PERT CPM PERT I t is activity oriented It is event oriented It is associated with deterministic activities It is associated with probabilistic activities It is based upon single time to complete an activity It is based upon 3 time estimate to complete an activity It is used mainly for construction project It is used mainly for research and development project 4 December 2016