Occupational health and safety management system

subodhhegde4 66 views 35 slides Aug 15, 2024
Slide 1
Slide 1 of 35
Slide 1
1
Slide 2
2
Slide 3
3
Slide 4
4
Slide 5
5
Slide 6
6
Slide 7
7
Slide 8
8
Slide 9
9
Slide 10
10
Slide 11
11
Slide 12
12
Slide 13
13
Slide 14
14
Slide 15
15
Slide 16
16
Slide 17
17
Slide 18
18
Slide 19
19
Slide 20
20
Slide 21
21
Slide 22
22
Slide 23
23
Slide 24
24
Slide 25
25
Slide 26
26
Slide 27
27
Slide 28
28
Slide 29
29
Slide 30
30
Slide 31
31
Slide 32
32
Slide 33
33
Slide 34
34
Slide 35
35

About This Presentation

health and safety mgt system


Slide Content

OHSAS 18001 AWARENESS

OHSAS 18001 - Occupational health and safety
management system

PDCA- PLAN, DO, CHECK,ACT
What is OSHAS 18001?
Originally developed in early 1990’s as BS8800
Revised in 1999 by BSI to be more compatible with
ISO 14001
Further revised in 2007.
Provides framework for OH&S-MS
Allows third-party certification/registration

KEY CHANGES IN OHSAS 2007 VERSION
FOCUS ON HEALTH
TOLERABLE RISK REPLACED BY ACCEPTABLE
RISK
ACCIDENT INCLUDED IN INCIDENT
HAZARD LINKED TO ASSET MANAGEMENT
NEW CHANGES SUCH AS :
HIERARCHY OF CONTROLS
EVALUATION OF COMPLIANCE
PARTICIPATION AND CONSULTATION
INVESTIGATION OF INCIDENTS

OHS POLICY
Clearly states overall OH&S objectives
Authorised by top management
Appropriate to nature & scale of OH&S risks
Documented, implemented, and maintained
Communicated to all employees
Available to interested parties
Reviewed periodically

OHS POLICY
Clearly states overall OH&S objectives
Authorised by top management
Appropriate to nature & scale of OH&S risks
Documented, implemented, and maintained
Communicated to all employees
Available to interested parties
Reviewed periodically

OHS POLICY COMMITMENTS
Prevention of injury /ill health
Continual improvement in OHSMS
Continual improvement in OHSMS performance
Comply with applicable legal requirements

OHS PLANNING
•Hazard identification, risk assessment, and risk
control
•Legal and other requirements
•Objectives
•OH&S management program(s)

•Conceptually similar to environmental aspects and
impacts –target of management program(s)
•Much more detailed than 14001 approach
•Assessment must address:
–routine and non-routine activities
–all personnel, including contractors and visitors
–facilities at the workplace, whether provided by the
organization or by others
Hazard Identification, Risk Assessment & Risk Hazard Identification, Risk Assessment & Risk
ControlControl

•Conceptually similar to environmental aspects and
impacts –target of management program(s)
•Much more detailed than 14001 approach
•Assessment must address:
–routine and non-routine activities
–all personnel, including contractors and visitors
–facilities at the workplace, whether provided by the
organization or by others
Hazard Identification, Risk Assessment & Risk Hazard Identification, Risk Assessment & Risk
ControlControl

•Methodology must be proactive
–in advance of process/equipment changes
–allow engineering of hazard controls during design
–implementation of controls as change occurs
•Success requires strong Management of Change
(MOC) procedure
Hazard Identification, Risk Assessment & Risk Hazard Identification, Risk Assessment & Risk
ControlControl

•Process overview
–identification of hazards
–evaluation of risks under current controls
–evaluation of the tolerability of residual risk
–identification of needed additional controls
•People are involved
–significant risks must be controlled
–individual behaviour is a significant factor
Hazard Identification, Risk Assessment & Risk Hazard Identification, Risk Assessment & Risk
ControlControl

Hazard Identification, Risk Assessment & Risk Hazard Identification, Risk Assessment & Risk
ControlControl

Implementation & Operation
•Structure and responsibilities
•Training awareness and competence
•Consultation and communication
•Documentation
•Document and data control
•Operational control
•Emergency preparedness and response

Structure & Responsibilities
•Documented roles, responsibilities, authorities,
and accountability
•Management appointee responsible for
implementation
•Resources
•Managers must demonstrate commitment to
continual improvement

Training , Awareness & Competence
•Ensure employee awareness and competence
•Take into account differing levels of:
–Responsibility
–Ability
–Literacy
–Risk
•Much of required training driven by regulation

Consultation & CommunicationConsultation & Communication
•More internally focused than ISO 14001
•Employee involvement and consultation
–in development/review of policies and procedures
–about changes that affect workplace safety or health
–ensuring representation in OH&S matters
•Buy-in, ownership, motivation
•Insights of shop floor perspective

Documentation & DataDocumentation & Data
•Documentation of core elements
–aids employee awareness
–shows how the various system relate
–extremely valuable during certification process
•Document and data control procedures
–critical documents are available
–obsolete documents and data are removed

Consultation & CommunicationConsultation & Communication
•More internally focused than ISO 14001
•Employee involvement and consultation
–in development/review of policies and procedures
–about changes that affect workplace safety or health
–ensuring representation in OH&S matters
•Buy-in, ownership, motivation
•Insights of shop floor perspective

Operational ControlOperational Control
•Identify operations and activities where risk
requires further control
•Plan these to ensure that
–documented procedures are developed
–operating criteria specify key steps and requirements
–procedures addressing risks related to contractor goods
and services
–establish design procedures to reduce/eliminate source
of risks

Operational ControlOperational Control

Emergency Preparedness & ResponseEmergency Preparedness & Response
•Emergency response procedures to address
–identifying potential for incidents and emergencies
–preventing and mitigating resultant illnesses and
injuries
–responding to incidents and emergencies when they
occur.

Emergency Preparedness & ResponseEmergency Preparedness & Response

Checking & Corrective actionChecking & Corrective action
•Performance measurement and monitoring
•Accidents, incidents, non-conformances and
corrective and preventive action
•Records and records management
•OH&S management system audit

Performance Measurement & Performance Measurement &
MonitoringMonitoring
•Monitoring the achievement of objectives
•Quantitative and qualitative measures
•Proactive and reactive methods
•Records to facilitate corrective and preventive
actions
•Calibration of monitoring equipment

Quantitative & QualitativeQuantitative & Qualitative
•Direct Quantitative Measures
–number of lost work days following an injury
–decibel levels of noise in a work area
•Indirect Qualitative Measures
–review of inspection logs
–observation of a task
–interviews

Proactive & Reactive MeasuresProactive & Reactive Measures
•Proactive monitoring of compliance
–routine basis, independent of any event
–monitoring may be required by regulations
•daily equipment checks
•periodic review of hot-work permits
•Reactive monitoring of accidents or incidents
–in response to an event or trigger
•accident investigation
•monitoring in response to a complaint

Accident, Incidents, Non-conformances & Corrective
and Preventive Action
•Handle, investigate, mitigate
–Accidents
–Incidents
–non-conformances
•Corrective and preventive actions
•Review action plans through risk assessment
process

Accident, Incidents, Non-conformances & Corrective
and Preventive Action
•Handle, investigate, mitigate
–Accidents
–Incidents
–non-conformances
•Corrective and preventive actions
•Review action plans through risk assessment
process

Accident, Incidents, Non-conformances & Corrective
and Preventive Action
•Handle = immediate action
–Notification
–emergency response
–recordkeeping to facilitate investigation
•Investigation process
–team and procedures
–root cause analysis
•People are involved
–human elements

Corrective and Preventive Action
QU
•Correct immediate problem
•Mitigate consequences
•Eliminate or control root cause
•Prevent recurrence
•Review action plans through risk assessment
process
•Communicate results and monitor

Records and Records Management
Q
•Identification, maintenance, and disposition
•Records must be:
–Legible
–Identifiable
–traceable to the activities involved
–easily retrievable
–protected from damage, deterioration, or loss
–held for specified and documented retention times

OH&S Management System Audit
•Determine if OH&S-MS:
–conforms with planned arrangements
–is properly implemented and maintained
–is effective in meeting policy and objectives
•Results provided to top management
•Audit program and schedule reflect risks and
previous audit results

Management Review

OHSAS 18001