OEE CALCULATION PPT

veeramaniveltraining 1,187 views 43 slides Aug 30, 2022
Slide 1
Slide 1 of 43
Slide 1
1
Slide 2
2
Slide 3
3
Slide 4
4
Slide 5
5
Slide 6
6
Slide 7
7
Slide 8
8
Slide 9
9
Slide 10
10
Slide 11
11
Slide 12
12
Slide 13
13
Slide 14
14
Slide 15
15
Slide 16
16
Slide 17
17
Slide 18
18
Slide 19
19
Slide 20
20
Slide 21
21
Slide 22
22
Slide 23
23
Slide 24
24
Slide 25
25
Slide 26
26
Slide 27
27
Slide 28
28
Slide 29
29
Slide 30
30
Slide 31
31
Slide 32
32
Slide 33
33
Slide 34
34
Slide 35
35
Slide 36
36
Slide 37
37
Slide 38
38
Slide 39
39
Slide 40
40
Slide 41
41
Slide 42
42
Slide 43
43

About This Presentation

OEE Related all details available


Slide Content

WELCOME

KAILAS SREE CHANDRAN
CLASS: S7 INDUSTRIAL 432
Guide: V REGIKUMAR
OVERALL EQUIPMENT EFFECTIVENESS
OEE

MODERN APPROACH TO
OVERALL EQUIPMENT EFFECTIVENESS
OEE

2

3

4

5

Lossduetobreakdownofequipment.
Lossismorethan10minutes.
BiggestofSIXBIGLOSSES.
ToolingFailures
UnplannedMaintenance
GeneralBreakdowns
EquipmentFailure
6

Thetimelostduetoadjustments
intheequipment.
Lossislessthen10minutes.
Setup/Changeover
MaterialShortages
MajorAdjustments
7

Smallstopslossesoccurwhenequipment
stopsforashorttimeasaresultofa
temporaryproblem.
Theseincludesstopsthatareunderten
minutes.
ComponentJams
Misfeeds
SensorBlocked
DeliveryBlocked
Cleaning/Checking
8

Reducedspeedreferstothe
differencebetweenDesignspeed
andActualOperatingspeed.
UnderNameplateCapacity
UnderDesignCapacity
DuetoEquipmentWear
DuetoOperatorInefficiency
9

Someequipmentsrequirewarm-
uptimeandcertainadjustments
toobtainoptimumoutput.
Startuprejectionoccursduring
thisstartuptime.
Scrap
Rework
10

Theselossesoccurswhenproducts
producedarenotconformingtothe
specifications.
Thesearerejectsduringsteady-state
production.
Scrap
Rework
11

12

Theamountoftimethefacilityisopenand
availableforoperation.
Oneyearconsistsof365days,oneday
consistsof24hours,60minutesinone
hour,60secondsinoneminute.
PLANTOPERATINGTIME=Fully
ProductiveTime+QualityLoss+Speed
Loss+DowntimeLoss+Planned
Shutdown
13

PLANT OPERATINGTIME
PLANNED PRODUCTION TIME
PLANNED
SHUTDOWN
OPERATING TIME
DOWNTIME
LOSS
NET OPERATING TIME
SPEED
LOSS
FULLY PRODUCTIVE TIME
QUALITY
LOSS
14

OEE FACTORS
15

Availabilityrepresentsthepercentage
ofscheduledtimethattheequipmentis
availabletooperate.
AvailabilitytakesintoaccountDown
TimeLosses.
AVAILABILITY= OperatingTime
PlannedProductionTime
16

Performancerepresentsthespeedat
whichtheequipmentrunsasa
percentageofitsdesignedspeed.
PerformancetakesintoaccountSpeed
loss.
PERFORMANCE=NetOperatingTime
OperatingTime
17

QualityrepresentstheGoodunits
producedasapercentageoftheTotal
unitsproduced.
QUALITY=FullyProductiveTime
NetOperatingTime
18

QUALITY=
Good Pieces/
Total Pieces
PERFORMANCE
=Actual Run
Rate/ Ideal Run
Rate
AVAILABILITY=
Operating time/
Planned
Production Time
19

20

21

22

OEE= AVAILABILITY X PERFORMANCE X QUALITY
Availability = Operating Time / Planned Production
Time
Performance = (Total Pieces / Operating Time) / Ideal
Run Rate
Quality = Good Pieces / Total Pieces
23

Thismethodusecomputersfor
accessinginputs,calculatingOEE
anditsanalysis.
E.g.:OEEIMPACT,VISUALOEE,
OEETOOLKIT,PROVIDEAMetc.
Spreadsheets
SystemSoftware
24

oShift Length: 8 Hours
oTea Breaks: 10 Minutes x 2
oMeals Break: 1 Hour
oDowntime: 10% of shift
oIdle Runrate: 5 pieces/minute (Cycle
time=0.2min/pieces)
oTotal Pieces Produced: 1600
oRejected Pieces: 52
25

OEE= Availability x Performance x Quality
Availability=OperatingTime/Planned
ProductionTime
PlannedProductionTime=PlantOperating
Time–PlannedShutdown
PlantOperatingTime=8hoursx60=480min.
PlannedShutdown=Teabreak+Lunch
Break=(10x2)+60=80minutes.
26

PlannedProductionTime=480-80=400min.
OperatingTime=PlannedProductionTime-
DowntimeLoss=400-48=352minutes.
Availability=352/400=0.88
Performance=(TotalPieces/OperatingTime)/
IdleRunRate=(1600/352)/5=0.9091
Quality =GoodPieces/TotalPieces
=(1600-52)/1600=0.9675
OEE = 0.88 x 0.9091 x 0.9675 = 0.774
OVERALL EQUIPMENT EFFECTIVENESS= 77.4%
27

OVERALL EQUIPMENT EFFECTIVENESS (EXCEL CALCULATOR)
Production Data
Shift Length 8Hours = 480Minutes
Short Breaks 2Breaks @ 10Minutes Each = 20Minutes Total
Meal Break 1Breaks @ 60Minutes Each = 60Minutes Total
Down Time 48Minutes
Ideal Run Rate 5PPM (Pieces Per Minute)
Total Pieces 1,600Pieces
Reject Pieces 52Pieces
Support Variable Calculation Result
Planned
Production Time Shift Length - Breaks 400Minutes
Operating Time Planned Production Time - Down Time 352Minutes
Good Pieces Total Pieces - Reject Pieces 1,548Pieces
OEE Factor Calculation OEE%
Availability Operating Time / Planned Production Time 88.00%
Performance (Total Pieces / Operation Time) / Ideal Run Rate90.91%
Quality Good Pieces / Total Pieces 96.75%
Overall OEE Availability x Performance x Quality 77.40%
OEE Factor
World
Class OEE
OEE%
Availability 90.00% 88.00%
Performance 95.00% 90.91%
Quality 99.90% 96.75%
Overall OEE 85.00%77.40% 28

World class OEE is a standard which is used to
compare the OEE of the firm.
OEE Factor WORLD CLASS
Availability 90%
Performance 95%
Quality 99%
OverallEquipment
Effectiveness
85%
29

30

FULLY PRODUCTIVE
TIME
QUALITY
LOSS
PLANT OPERATINGTIME
PLANNED PRODUCTION TIME
PLANNED
SHUTDOWN
OPERATING TIME
DOWNTIME
LOSS
RUNNING TIME
STOP TIME
LOSS
NET OPERATING TIME
SPEED
LOSS
31

UsabilitytakesintoaccountStopTime
Loss.
USABILITY = Running Time
Operating Time
32

OEE
AvailabilityUsabilityPerformance Quality
33

34

oShift Length: 8 Hours
oTea Breaks: 10 Minutes x 2
oMeals Break: 1 Hour
oWarm-up Time: 20 minutes
oEquipment Breakdown(Tool Failure): 28 min.
oIdle Runrate: 5 pieces/minute (Cycle
time=0.2min/pieces)
oTotal Pieces Produced: 1600
oRejected Pieces: 52
Downtime
Loss of 48
minutes (10%
of Shift)
35

Availability = Operating Time/ Planned
Production Time
Planned Production Time = 400 minutes
Operating Time = Planned Production Time-
Breakdowns= 400-28 = 372 minutes.
Availability= 372/400 = 0.93
Usability = Running time / Operating Time
Running Time= Operating Time –Warm-up
Time = 372-20 = 352 minutes.
Usability= 352 / 372 = 0.9462
36

Performance=(Total Pieces / Operating Time) /
Idle Run Rate = (1600 / 352) / 5 = 0.9091
Quality= Good Pieces / Total Pieces
= (1600-52) / 1600 = 0.9675
OEE = Availability x Usability x Performance x
Quality
OEE= 0.93 x 0.9462 x 0.9091 x 0.9675 = 0.774
Modified OVERALL EQUIPMENT
EFFECTIVENESS = 77.4%
37

38

39

AnilS.Badiger,‘Aproposal:evaluationof
OEEandimpactofsixbiglosses’,Int.J.
ProcessManagementandBenchmarking,
Vol.2,No.3,2008,pp234-248.
RavikumarM.M.,‘ImprovingEquipment
Effectiveness’,Int.BusinessManagement,
Vol.3,No.2,2008,pp91-96.
www.bestmanagementarticles.com
www.maintenanceworld.com
40