PLANT OPERATINGTIME
PLANNED PRODUCTION TIME
PLANNED
SHUTDOWN
OPERATING TIME
DOWNTIME
LOSS
NET OPERATING TIME
SPEED
LOSS
FULLY PRODUCTIVE TIME
QUALITY
LOSS
14
QUALITY=
Good Pieces/
Total Pieces
PERFORMANCE
=Actual Run
Rate/ Ideal Run
Rate
AVAILABILITY=
Operating time/
Planned
Production Time
19
20
21
22
OEE= AVAILABILITY X PERFORMANCE X QUALITY
Availability = Operating Time / Planned Production
Time
Performance = (Total Pieces / Operating Time) / Ideal
Run Rate
Quality = Good Pieces / Total Pieces
23
OVERALL EQUIPMENT EFFECTIVENESS (EXCEL CALCULATOR)
Production Data
Shift Length 8Hours = 480Minutes
Short Breaks 2Breaks @ 10Minutes Each = 20Minutes Total
Meal Break 1Breaks @ 60Minutes Each = 60Minutes Total
Down Time 48Minutes
Ideal Run Rate 5PPM (Pieces Per Minute)
Total Pieces 1,600Pieces
Reject Pieces 52Pieces
Support Variable Calculation Result
Planned
Production Time Shift Length - Breaks 400Minutes
Operating Time Planned Production Time - Down Time 352Minutes
Good Pieces Total Pieces - Reject Pieces 1,548Pieces
OEE Factor Calculation OEE%
Availability Operating Time / Planned Production Time 88.00%
Performance (Total Pieces / Operation Time) / Ideal Run Rate90.91%
Quality Good Pieces / Total Pieces 96.75%
Overall OEE Availability x Performance x Quality 77.40%
OEE Factor
World
Class OEE
OEE%
Availability 90.00% 88.00%
Performance 95.00% 90.91%
Quality 99.90% 96.75%
Overall OEE 85.00%77.40% 28
World class OEE is a standard which is used to
compare the OEE of the firm.
OEE Factor WORLD CLASS
Availability 90%
Performance 95%
Quality 99%
OverallEquipment
Effectiveness
85%
29
30
FULLY PRODUCTIVE
TIME
QUALITY
LOSS
PLANT OPERATINGTIME
PLANNED PRODUCTION TIME
PLANNED
SHUTDOWN
OPERATING TIME
DOWNTIME
LOSS
RUNNING TIME
STOP TIME
LOSS
NET OPERATING TIME
SPEED
LOSS
31
UsabilitytakesintoaccountStopTime
Loss.
USABILITY = Running Time
Operating Time
32
OEE
AvailabilityUsabilityPerformance Quality
33
34
oShift Length: 8 Hours
oTea Breaks: 10 Minutes x 2
oMeals Break: 1 Hour
oWarm-up Time: 20 minutes
oEquipment Breakdown(Tool Failure): 28 min.
oIdle Runrate: 5 pieces/minute (Cycle
time=0.2min/pieces)
oTotal Pieces Produced: 1600
oRejected Pieces: 52
Downtime
Loss of 48
minutes (10%
of Shift)
35
Availability = Operating Time/ Planned
Production Time
Planned Production Time = 400 minutes
Operating Time = Planned Production Time-
Breakdowns= 400-28 = 372 minutes.
Availability= 372/400 = 0.93
Usability = Running time / Operating Time
Running Time= Operating Time –Warm-up
Time = 372-20 = 352 minutes.
Usability= 352 / 372 = 0.9462
36
Performance=(Total Pieces / Operating Time) /
Idle Run Rate = (1600 / 352) / 5 = 0.9091
Quality= Good Pieces / Total Pieces
= (1600-52) / 1600 = 0.9675
OEE = Availability x Usability x Performance x
Quality
OEE= 0.93 x 0.9462 x 0.9091 x 0.9675 = 0.774
Modified OVERALL EQUIPMENT
EFFECTIVENESS = 77.4%
37