Technical Information of Project
Present Average Load Demand
3.8 MW
Potential Demand
38 MW
Number of Existing SS
1
Existing Substations Capacity
32MVA
Connection Point and Capacity Pul-e- Alam
SS/TL-32MVA
Project Interconnection point
Distance
1.8 Km
Existing Transmission on Line
Voltage
220 kV
Nearby Substation GPS Point N= 33.998591
E= 68.980399
Summary of Project Status
Survey Done
Undone
☐
land availability Available
Unavailable
☐
Land Ownership Government
Other
☐
Pre-feasibility study Done
Undone
☐
Feasibility Study Done
Undone
☐
Grid Impact Studies Done
Undone
☐
Salient Features of the Project
Location
Logar, Pul-e- Alam
GPS Point N = 34°0'35.37"
E= 68°57'55.55"
Capacity
40 MWp
Budget
Investor
Contract Duration
20-25 years
Implementation Agency
IPP
Power Purchase Agency
DABS
Logar, Pul-e-Alam 40MWp Solar Power Plant
40
????????????????????????????????????????????????
Steps Taken by Project Team
Survey and data
collection of project has
been done.
The require land of the
project is identified.
Prepared by:
Investment Coordination Directorate
Da Afghanistan Breshna Sherkat (DABS)
1
3
Investment Coordination Directorate
1. Investors to send an official “Letter of Interest” to DABS to express their investment interest;
2. DABS to introduce investment opportunities to the investors;
3. DABS to submit “Investment Registration Form” to the investor; seeking various information required;
4. Investor to submit the “Concept Proposal” to the High Economic Commission / Inter-Ministerial Investment
Committee(HEC/IMIC);
5. The ”HEC/IMIC” will refer the concept proposal to DABS / related authorities;
6. DABS to review the concept proposal technically, financially & legally in coordination with related authorities;
7. DABS to conduct “Grid Connection Study” for the specific project;
8. Investor to conduct “Feasibility Study” and “Grid Connection Study” of the specific project in coordination with DABS;
9. Investor to submit “Complete Proposal” including detailed “Financial Model” of specific project to DABS;
10. Tariff Negotiations between DABS and the investor;
11. DABS to present the “Project Summary Sheet” for tariff determination/approval to DABS Senior Management Group
“SMG”;
12. DABS to present the “Complete Proposal” and agreed tariff to the HEC / related authorities approval;
13. PPA Signing Ceremony.
14.
Way Forward
The Pre-feasibility study
of project has been
conducted.